X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0325020310000

Well Details

Well ID: 0325020310000
Loading map...
Location: 00/10-03-032-02W5/0
Location Alias: 00/10-03-32-02 W5M
Location Alias 2: 00/10-03-032-02 W5/00
Country: Canada
Province: Alberta
Township: 032
Meridian: 5
Range: 02
Section: 03
County/Municipality: Mountain View County
Well Name: WHITECAP GARR 10-3-32-2
Operator Name: Whitecap Resources Inc.
License Number: 0025708
License Date: 1964-02-14
License Status: Suspension
Spud Date: 1964-02-16
Final Drill Date: 1964-02-26
Well Total Depth: 1876.00 m
Surface Hole Latitude: 51.717341
Surface Hole Longitude: -114.199563

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1964-02-14 Obtained License
1964-02-26 Finished Drilling
1964-02-26 Production Casing Operation Performed
1964-02-26 Well Mode changed to Drilled and Cased
1964-02-29 Perforation Treatment Performed - Selective Jet Perforations
1964-03-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-03-03 Perforation Treatment Performed - Fractured
1964-03-09 Well Began Production
1964-03-09 Well Fluid changed to Crude Oil
1964-03-09 Well Mode changed to Flowing
1965-03-26 Well Fluid changed to Crude Oil
1965-03-26 Well Mode changed to Pumping
1980-09-01 Well Fluid changed to Crude Oil
1980-09-01 Well Mode changed to Suspended
1981-05-14 Perforation Treatment Performed - Jet Perforation
1981-05-15 Perforation Treatment Performed - Chemical Squeeze
1981-05-20 Perforation Treatment Performed - Fractured
1992-05-01 Well Fluid changed to Crude Oil
1992-05-01 Well Mode changed to Gas Lift
2014-06-01 Well Fluid changed to Crude Oil
2014-06-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1964-02-29 Selective Jet Perforations 1852.90 1853.20 0
1964-02-29 Selective Jet Perforations 1853.50 1853.80 0
1964-03-01 Acid Treatment 1852.90 1853.80 0
1964-03-03 Fracture 1852.90 1853.80 0
1981-05-14 Perforation 1852.60 1853.80 13
1981-05-15 Chemical Squeeze 1852.60 1853.80 0
1981-05-20 Fracture 1852.60 1853.80 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 4488 0.0 0.0 0.0
1968 3947 0.0 0.0 0.0
1969 4128 0.0 0.0 0.0
1970 2424 0.0 0.0 0.0
1971 1248 0.0 0.0 0.0
1972 3746 0.0 0.0 0.0
1973 5046 0.0 0.0 0.0
1974 7772 0.0 0.0 0.0
1975 7968 0.0 0.0 0.0
1976 7810 0.0 0.0 0.0
1977 8615 0.0 0.0 0.0
1978 8611 0.0 0.0 0.0
1979 7379 0.0 0.0 0.0
1980 4140 0.0 0.0 0.0
1992 5026 0.0 0.0 0.0
1993 7143 0.0 0.0 0.0
1994 7851 0.0 0.0 0.0
1995 8087 0.0 0.0 0.0
1996 8783 0.0 0.0 0.0
1997 8375 0.0 0.0 0.0
1998 7003 0.0 0.0 0.0
1999 4943 0.0 0.0 0.0
2000 2040 0.0 0.0 0.0
2002 3226 0.0 0.0 0.0
2003 8382 0.0 0.0 0.0
2004 8740 0.0 0.0 0.0
2005 8167 0.0 0.0 0.0
2006 8469 0.0 0.0 0.0
2007 8518 0.0 0.0 0.0
2008 7837 0.0 0.0 0.0
2009 8425 0.0 0.0 0.0
2010 7444 0.0 0.0 0.0
2011 7762 0.0 0.0 0.0
2012 2520 0.0 0.0 0.0

For data sources see[5]

References