If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0324282105002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.755453,"lon":-113.920835,"icon":""}]} |
Location: 00/05-21-032-28W4/2 | |
Location Alias: 00/05-21-32-28 W4M | |
Location Alias 2: 00/05-21-032-28 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 032 | |
Meridian: 4 | |
Range: 28 | |
Section: 21 | |
County/Municipality: Mountain View County | |
Well Name: EMBER STEWART 5-21-32-28 | |
Operator Name: Ember Resources Inc. | |
License Number: 0241647 | |
License Date: 2000-09-06 | |
License Status: Amended | |
Spud Date: 2000-09-11 | |
Final Drill Date: 2000-09-21 | |
Well Total Depth: 2128.00 m | |
Surface Hole Latitude: 51.755453 | |
Surface Hole Longitude: -113.920835 |
Date | Event |
---|---|
2000-09-06 | Obtained License |
2000-09-13 | Surface Casing Operation Performed |
2000-09-21 | Finished Drilling |
2000-09-21 | Well Log Performed |
2000-09-21 | Well Mode changed to Drilled and Cased |
2000-09-23 | Production Casing Operation Performed |
2000-09-23 | Rig Released |
2000-09-28 | Perforation Treatment Performed - Jet Perforation |
2000-09-28 | Well Log Performed |
2000-09-30 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2000-09-30 | Perforation Treatment Performed - Jet Perforation |
2000-09-30 | Plug Back Performed |
2000-09-30 | Well Log Performed |
2000-10-01 | Perforation Treatment Performed - Fractured |
2000-11-16 | Well Began Production |
2000-11-16 | Well Fluid changed to Gas |
2000-11-16 | Well Mode changed to Flowing |
2000-11-17 | Well Fluid changed to Gas |
2000-11-17 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2000-09-28 | Perforation | 2085.50 | 2090.50 | 17 |
2000-09-30 | Packing Device Capped w/Cement | 2071.00 | 2079.00 | 0 |
2000-09-30 | Perforation | 1807.00 | 1812.00 | 17 |
2000-10-01 | Fracture | 1807.00 | 1812.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2000 | 1056 | 0.0 | 0.0 | 0.0 |
2001 | 7173 | 0.0 | 0.0 | 0.0 |
2002 | 8630 | 0.0 | 0.0 | 0.0 |
2003 | 8723 | 0.0 | 0.0 | 0.0 |
2004 | 8745 | 0.0 | 0.0 | 0.0 |
2005 | 8663 | 0.0 | 0.0 | 0.0 |
2006 | 8734 | 0.0 | 0.0 | 0.0 |
2007 | 8759 | 0.0 | 0.0 | 0.0 |
2008 | 8783 | 0.0 | 0.0 | 0.0 |
2009 | 8510 | 0.0 | 0.0 | 0.0 |
2010 | 8759 | 0.0 | 0.0 | 0.0 |
2011 | 8623 | 0.0 | 0.0 | 0.0 |
2012 | 8646 | 0.0 | 0.0 | 0.0 |
2013 | 8695 | 0.0 | 0.0 | 0.0 |
2014 | 8687 | 0.0 | 0.0 | 0.0 |
2015 | 7775 | 0.0 | 0.0 | 0.0 |
2016 | 8759 | 0.0 | 0.0 | 0.0 |
2017 | 4690 | 0.0 | 0.0 | 0.0 |
2018 | 1 | 0.0 | 0.0 | 0.0 |
2020 | 1439 | 0.0 | 0.0 | 0.0 |
For data sources see[5]