If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0324263009002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.774084,"lon":-113.67008,"icon":""}]} |
Location: 00/09-30-032-26W4/2 | |
Location Alias: 00/09-30-32-26 W4M | |
Location Alias 2: 00/09-30-032-26 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 032 | |
Meridian: 4 | |
Range: 26 | |
Section: 30 | |
County/Municipality: Kneehill County | |
Well Name: EMBER WIM 9-30-32-26 | |
Operator Name: Ember Resources Inc. | |
License Number: 0355054 | |
License Date: 2006-04-03 | |
License Status: Issued | |
Spud Date: 2006-08-05 | |
Final Drill Date: 2006-08-10 | |
Well Total Depth: 1044.00 m | |
Surface Hole Latitude: 51.774084 | |
Surface Hole Longitude: -113.670080 |
Date | Event |
---|---|
2006-04-03 | Obtained License |
2006-08-06 | Surface Casing Operation Performed |
2006-08-10 | Finished Drilling |
2006-08-10 | Well Log Performed |
2006-08-10 | Well Mode changed to Drilled and Cased |
2006-08-11 | Production Casing Operation Performed |
2006-08-11 | Rig Released |
2006-08-20 | Well Log Performed |
2006-08-27 | Perforation Treatment Performed - Jet Perforation |
2006-08-27 | Well Log Performed |
2006-09-07 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2006-09-07 | Perforation Treatment Performed - Jet Perforation |
2006-09-07 | Plug Back Performed |
2006-09-07 | Well Log Performed |
2006-09-30 | Perforation Treatment Performed - Fractured |
2006-10-04 | Well Began Production |
2006-10-04 | Well Fluid changed to Coalbed Methane-Coals Only |
2006-10-04 | Well Mode changed to Flowing |
2016-02-18 | Perforation Treatment Performed - Jet Perforation |
2016-03-01 | Perforation Treatment Performed - Fractured |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2006-08-27 | Perforation | 815.00 | 819.50 | 17 |
2006-09-07 | Perforation | 666.80 | 667.60 | 14 |
2006-09-07 | Perforation | 662.80 | 665.80 | 14 |
2006-09-07 | Perforation | 651.80 | 652.10 | 14 |
2006-09-07 | Perforation | 636.30 | 636.60 | 14 |
2006-09-07 | Perforation | 623.90 | 624.50 | 14 |
2006-09-07 | Perforation | 615.50 | 615.90 | 14 |
2006-09-07 | Perforation | 582.90 | 583.30 | 14 |
2006-09-07 | Perforation | 580.90 | 581.20 | 14 |
2006-09-07 | Perforation | 575.30 | 575.70 | 14 |
2006-09-07 | Perforation | 563.40 | 563.80 | 14 |
2006-08-27 | Perforation | 792.00 | 795.00 | 17 |
2006-09-07 | Perforation | 547.00 | 547.40 | 14 |
2006-09-07 | Perforation | 538.80 | 539.20 | 14 |
2006-09-07 | Perforation | 522.00 | 522.40 | 14 |
2006-09-07 | Perforation | 502.80 | 503.20 | 14 |
2006-09-07 | Perforation | 430.40 | 430.80 | 14 |
2006-09-07 | Perforation | 412.70 | 413.00 | 14 |
2006-09-07 | Perforation | 408.70 | 409.10 | 14 |
2006-09-07 | Perforation | 380.40 | 380.80 | 14 |
2006-09-07 | Perforation | 271.50 | 272.10 | 14 |
2006-09-07 | Perforation | 263.60 | 264.00 | 14 |
2006-08-27 | Perforation | 766.00 | 769.50 | 17 |
2006-09-30 | Fracture | 263.60 | 681.90 | 0 |
2016-02-18 | Perforation | 640.00 | 642.00 | 14 |
2016-02-18 | Perforation | 597.00 | 599.00 | 14 |
2016-02-18 | Perforation | 592.00 | 593.00 | 14 |
2016-02-18 | Perforation | 494.50 | 497.00 | 14 |
2016-02-18 | Perforation | 485.00 | 487.00 | 14 |
2016-02-18 | Perforation | 475.00 | 479.00 | 14 |
2016-02-18 | Perforation | 444.00 | 447.00 | 14 |
2016-02-18 | Perforation | 426.50 | 429.50 | 14 |
2016-02-18 | Perforation | 397.00 | 401.00 | 14 |
2006-09-07 | Packing Device Capped w/Cement | 755.80 | 763.80 | 0 |
2016-03-01 | Fracture | 397.00 | 642.00 | 0 |
2006-09-07 | Perforation | 681.50 | 681.90 | 14 |
2006-09-07 | Perforation | 678.40 | 678.80 | 14 |
2006-09-07 | Perforation | 676.00 | 676.70 | 14 |
2006-09-07 | Perforation | 671.00 | 671.30 | 14 |
2006-09-07 | Perforation | 669.50 | 670.00 | 14 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2006 | 1814 | 0.0 | 0.0 | 0.0 |
2007 | 7054 | 0.0 | 0.0 | 0.0 |
2008 | 7849 | 0.0 | 0.0 | 0.0 |
2009 | 8610 | 0.0 | 0.0 | 0.0 |
2010 | 8668 | 0.0 | 0.0 | 0.0 |
2011 | 8654 | 0.0 | 0.0 | 0.0 |
2012 | 8663 | 0.0 | 0.0 | 0.0 |
2013 | 8687 | 0.0 | 0.0 | 0.0 |
2014 | 8399 | 0.0 | 0.0 | 0.0 |
2015 | 8567 | 0.0 | 0.0 | 0.0 |
2016 | 8759 | 0.0 | 0.0 | 0.0 |
2017 | 8759 | 0.0 | 0.0 | 0.0 |
2018 | 8759 | 0.0 | 0.0 | 0.0 |
2019 | 2929 | 0.0 | 0.0 | 0.0 |
2020 | 56 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2016-02-18 | No Incident Encountered | 0.00 | 0.00 |
2016-03-01 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]