If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0324262603004 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.766029,"lon":-113.584952,"icon":""}]} |
Location: 00/03-26-032-26W4/4 | |
Location Alias: 00/03-26-32-26 W4M | |
Location Alias 2: 00/03-26-032-26 W4/04 | |
Country: Canada | |
Province: Alberta | |
Township: 032 | |
Meridian: 4 | |
Range: 26 | |
Section: 26 | |
County/Municipality: Kneehill County | |
Well Name: EMBER WIM 3-26-32-26 | |
Operator Name: Ember Resources Inc. | |
License Number: 0237897 | |
License Date: 2000-05-31 | |
License Status: Amended | |
Spud Date: 2000-06-03 | |
Final Drill Date: 2000-06-10 | |
Well Total Depth: 1810.00 m | |
Surface Hole Latitude: 51.766029 | |
Surface Hole Longitude: -113.584952 |
Date | Event |
---|---|
2000-05-31 | Obtained License |
2000-06-04 | Surface Casing Operation Performed |
2000-06-10 | Finished Drilling |
2000-06-10 | Well Mode changed to Drilled and Cased |
2000-06-11 | Well Log Performed |
2000-06-12 | Production Casing Operation Performed |
2000-06-12 | Rig Released |
2000-08-09 | Perforation Treatment Performed - Jet Perforation |
2000-08-09 | Well Log Performed |
2000-08-11 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2000-08-11 | Plug Back Performed |
2000-08-11 | Well Log Performed |
2000-08-12 | Perforation Treatment Performed - Jet Perforation |
2000-08-12 | Well Log Performed |
2000-10-27 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2000-10-27 | Plug Back Performed |
2000-10-27 | Well Log Performed |
2000-10-28 | Perforation Treatment Performed - Jet Perforation |
2000-11-16 | Perforation Treatment Performed - Fractured |
2009-05-14 | Well Log Performed |
2009-05-15 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2009-05-15 | Perforation Treatment Performed - Jet Perforation |
2009-05-15 | Plug Back Performed |
2009-05-15 | Well Log Performed |
2009-05-21 | Perforation Treatment Performed - Fractured |
2009-05-23 | Well Began Production |
2009-05-23 | Well Fluid changed to Coalbed Methane-Coals and Other |
2009-05-23 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2000-08-09 | Perforation | 1765.50 | 1766.00 | 14 |
2009-05-15 | Perforation | 280.60 | 281.10 | 13 |
2009-05-15 | Perforation | 300.90 | 301.40 | 13 |
2009-05-15 | Perforation | 398.90 | 399.40 | 13 |
2009-05-15 | Perforation | 418.90 | 419.40 | 13 |
2009-05-15 | Perforation | 448.10 | 449.10 | 13 |
2009-05-15 | Perforation | 472.40 | 472.90 | 13 |
2009-05-15 | Perforation | 530.30 | 530.80 | 13 |
2009-05-15 | Perforation | 537.00 | 538.00 | 13 |
2009-05-15 | Perforation | 554.00 | 554.50 | 13 |
2009-05-15 | Perforation | 576.80 | 577.30 | 13 |
2000-08-09 | Perforation | 1766.50 | 1767.50 | 14 |
2009-05-15 | Perforation | 582.70 | 583.20 | 13 |
2009-05-15 | Perforation | 606.60 | 609.10 | 13 |
2009-05-15 | Perforation | 621.30 | 621.80 | 13 |
2009-05-15 | Perforation | 630.70 | 631.20 | 13 |
2009-05-15 | Perforation | 639.80 | 640.80 | 13 |
2009-05-15 | Perforation | 661.00 | 664.00 | 13 |
2009-05-15 | Perforation | 664.80 | 665.30 | 13 |
2009-05-15 | Perforation | 679.50 | 680.00 | 13 |
2009-05-15 | Perforation | 683.50 | 684.00 | 13 |
2009-05-21 | Fracture | 280.60 | 684.00 | 0 |
2000-08-11 | Packing Device Capped w/Cement | 1752.00 | 1760.00 | 0 |
2000-08-12 | Perforation | 1586.00 | 1591.50 | 14 |
2000-08-12 | Perforation | 1580.00 | 1586.00 | 14 |
2000-10-27 | Packing Device Capped w/Cement | 1567.00 | 1575.00 | 0 |
2000-10-28 | Perforation | 986.00 | 988.00 | 14 |
2000-11-16 | Fracture | 986.00 | 988.00 | 0 |
2009-05-15 | Packing Device Capped w/Cement | 973.00 | 981.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2009 | 5221 | 0.0 | 0.0 | 0.0 |
2010 | 8699 | 0.0 | 0.0 | 0.0 |
2011 | 8619 | 0.0 | 0.0 | 0.0 |
2012 | 8383 | 0.0 | 0.0 | 0.0 |
2013 | 8439 | 0.0 | 0.0 | 0.0 |
2014 | 8729 | 0.0 | 0.0 | 0.0 |
2015 | 8732 | 0.0 | 0.0 | 0.0 |
2016 | 8689 | 0.0 | 0.0 | 0.0 |
2017 | 8647 | 0.0 | 0.0 | 0.0 |
2018 | 8614 | 0.0 | 0.0 | 0.0 |
2019 | 8711 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[5]