X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0324262603003

Well Details

Well ID: 0324262603003
Loading map...
Location: 00/03-26-032-26W4/3
Location Alias: 00/03-26-32-26 W4M
Location Alias 2: 00/03-26-032-26 W4/03
Country: Canada
Province: Alberta
Township: 032
Meridian: 4
Range: 26
Section: 26
County/Municipality: Kneehill County
Well Name: EMBER WIM 3-26-32-26
Operator Name: Ember Resources Inc.
License Number: 0237897
License Date: 2000-05-31
License Status: Amended
Spud Date: 2000-06-03
Final Drill Date: 2000-06-10
Well Total Depth: 1810.00 m
Surface Hole Latitude: 51.766029
Surface Hole Longitude: -113.584952

For data sources see[1][2]

Well History

Date Event
2000-05-31 Obtained License
2000-06-04 Surface Casing Operation Performed
2000-06-10 Finished Drilling
2000-06-10 Well Mode changed to Drilled and Cased
2000-06-11 Well Log Performed
2000-06-12 Production Casing Operation Performed
2000-06-12 Rig Released
2000-08-09 Perforation Treatment Performed - Jet Perforation
2000-08-09 Well Log Performed
2000-08-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-08-11 Plug Back Performed
2000-08-11 Well Log Performed
2000-08-12 Perforation Treatment Performed - Jet Perforation
2000-08-12 Well Log Performed
2000-10-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-10-27 Plug Back Performed
2000-10-27 Well Log Performed
2000-10-28 Perforation Treatment Performed - Jet Perforation
2000-10-28 Well Mode changed to Drilled and Cased
2000-11-16 Perforation Treatment Performed - Fractured
2009-05-14 Well Log Performed
2009-05-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-05-15 Perforation Treatment Performed - Jet Perforation
2009-05-15 Plug Back Performed
2009-05-15 Well Log Performed
2009-05-15 Well Mode changed to Abandoned Zone
2009-05-21 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2000-08-09 Perforation 1765.50 1766.00 14
2009-05-15 Perforation 280.60 281.10 13
2009-05-15 Perforation 300.90 301.40 13
2009-05-15 Perforation 398.90 399.40 13
2009-05-15 Perforation 418.90 419.40 13
2009-05-15 Perforation 448.10 449.10 13
2009-05-15 Perforation 472.40 472.90 13
2009-05-15 Perforation 530.30 530.80 13
2009-05-15 Perforation 537.00 538.00 13
2009-05-15 Perforation 554.00 554.50 13
2009-05-15 Perforation 576.80 577.30 13
2000-08-09 Perforation 1766.50 1767.50 14
2009-05-15 Perforation 582.70 583.20 13
2009-05-15 Perforation 606.60 609.10 13
2009-05-15 Perforation 621.30 621.80 13
2009-05-15 Perforation 630.70 631.20 13
2009-05-15 Perforation 639.80 640.80 13
2009-05-15 Perforation 661.00 664.00 13
2009-05-15 Perforation 664.80 665.30 13
2009-05-15 Perforation 679.50 680.00 13
2009-05-15 Perforation 683.50 684.00 13
2009-05-21 Fracture 280.60 684.00 0
2000-08-11 Packing Device Capped w/Cement 1752.00 1760.00 0
2000-08-12 Perforation 1586.00 1591.50 14
2000-08-12 Perforation 1580.00 1586.00 14
2000-10-27 Packing Device Capped w/Cement 1567.00 1575.00 0
2000-10-28 Perforation 986.00 988.00 14
2000-11-16 Fracture 986.00 988.00 0
2009-05-15 Packing Device Capped w/Cement 973.00 981.00 0

For data sources see[4]



References