X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0324260310003

Well Details

Well ID: 0324260310003
Loading map...
Location: 00/10-03-032-26W4/3
Location Alias: 00/10-03-32-26 W4M
Location Alias 2: 00/10-03-032-26 W4/03
Country: Canada
Province: Alberta
Township: 032
Meridian: 4
Range: 26
Section: 03
County/Municipality: Kneehill County
Well Name: EMBER WIM 10-3-32-26
Operator Name: Ember Resources Inc.
License Number: 0321819
License Date: 2004-12-15
License Status: Issued
Spud Date: 2005-01-15
Final Drill Date: 2005-01-17
Well Total Depth: 1011.00 m
Surface Hole Latitude: 51.714964
Surface Hole Longitude: -113.605650

For data sources see[1][2]

Well History

Date Event
2004-12-15 Obtained License
2005-01-16 Surface Casing Operation Performed
2005-01-17 Finished Drilling
2005-01-17 Well Mode changed to Drilled and Cased
2005-01-18 Well Log Performed
2005-01-19 Production Casing Operation Performed
2005-01-19 Rig Released
2005-01-31 Well Log Performed
2005-02-02 Perforation Treatment Performed - Jet Perforation
2005-02-02 Well Log Performed
2005-02-04 Perforation Treatment Performed - Fractured
2005-02-10 Perforation Treatment Performed - Fractured
2005-02-10 Perforation Treatment Performed - Jet Perforation
2005-02-10 Well Log Performed
2005-12-17 Well Began Production
2005-12-17 Well Fluid changed to Gas
2005-12-17 Well Mode changed to Flowing
2006-07-22 Well Structure changed to Commingled

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-02-02 Perforation 964.00 968.00 17
2005-02-10 Fracture 723.00 857.00 0
2005-02-10 Perforation 507.70 508.20 13
2005-02-10 Perforation 511.00 511.50 13
2005-02-10 Perforation 522.50 523.00 13
2005-02-10 Perforation 546.00 546.50 13
2005-02-10 Perforation 552.80 553.70 13
2005-02-10 Perforation 579.60 582.20 13
2005-02-10 Perforation 597.70 598.20 13
2005-02-10 Perforation 601.00 601.50 13
2005-02-10 Perforation 603.30 603.80 13
2005-02-02 Perforation 982.50 987.50 17
2005-02-10 Perforation 613.80 615.30 13
2005-02-10 Perforation 639.00 642.60 13
2005-02-10 Perforation 643.00 644.00 13
2005-02-10 Perforation 647.70 648.70 13
2005-02-10 Perforation 649.80 650.30 13
2005-02-10 Perforation 656.70 657.80 13
2005-02-10 Perforation 658.70 659.50 13
2005-02-10 Perforation 660.40 660.90 13
2005-02-10 Fracture 507.70 660.90 0
2005-02-10 Perforation 415.00 418.00 17
2005-02-02 Perforation 987.50 993.00 17
2005-02-10 Perforation 427.00 429.00 17
2005-02-10 Perforation 448.00 453.00 17
2005-02-10 Perforation 501.00 505.00 17
2005-02-10 Fracture 415.00 505.00 0
2005-02-02 Perforation 987.00 988.00 3
2005-02-04 Fracture 964.00 993.00 0
2005-02-10 Perforation 723.00 724.50 17
2005-02-10 Perforation 731.50 733.00 17
2005-02-10 Perforation 746.50 750.50 17
2005-02-10 Perforation 855.00 857.00 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2005 327 0.0 0.0 0.0
2006 4392 0.0 0.0 0.0

For data sources see[5]

References