If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0324253506002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.785571,"lon":-113.443159,"icon":""}]} |
Location: 00/06-35-032-25W4/2 | |
Location Alias: 00/06-35-32-25 W4M | |
Location Alias 2: 00/06-35-032-25 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 032 | |
Meridian: 4 | |
Range: 25 | |
Section: 35 | |
County/Municipality: Kneehill County | |
Well Name: EMBER TWINING 6-35-32-25 | |
Operator Name: Ember Resources Inc. | |
License Number: 0402830 | |
License Date: 2008-10-27 | |
License Status: Issued | |
Spud Date: 2008-11-13 | |
Final Drill Date: 2008-11-15 | |
Well Total Depth: 959.00 m | |
Surface Hole Latitude: 51.785571 | |
Surface Hole Longitude: -113.443159 |
Date | Event |
---|---|
2008-10-27 | Obtained License |
2008-11-13 | Surface Casing Operation Performed |
2008-11-15 | Finished Drilling |
2008-11-15 | Production Casing Operation Performed |
2008-11-15 | Rig Released |
2008-11-15 | Well Log Performed |
2008-11-15 | Well Mode changed to Drilled and Cased |
2008-11-21 | Well Log Performed |
2009-01-09 | Perforation Treatment Performed - Jet Perforation |
2009-01-09 | Well Log Performed |
2009-01-19 | Perforation Treatment Performed - Bridge Plug No Cement Required |
2009-01-19 | Well Log Performed |
2009-01-21 | Perforation Treatment Performed - Jet Perforation |
2009-01-21 | Well Log Performed |
2009-01-30 | Perforation Treatment Performed - Fractured |
2015-08-01 | Well Began Production |
2015-08-01 | Well Fluid changed to Gas |
2015-08-01 | Well Mode changed to Flowing |
2017-03-22 | Well Fluid changed to Gas |
2017-03-22 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2009-01-09 | Perforation | 698.50 | 700.00 | 13 |
2009-01-21 | Perforation | 497.10 | 497.60 | 13 |
2009-01-21 | Perforation | 504.80 | 505.80 | 13 |
2009-01-21 | Perforation | 513.20 | 513.70 | 13 |
2009-01-21 | Perforation | 520.40 | 520.90 | 13 |
2009-01-21 | Perforation | 554.90 | 555.40 | 13 |
2009-01-21 | Perforation | 569.60 | 570.10 | 13 |
2009-01-21 | Perforation | 584.70 | 585.70 | 13 |
2009-01-21 | Perforation | 588.40 | 589.40 | 13 |
2009-01-21 | Perforation | 592.00 | 592.50 | 13 |
2009-01-21 | Perforation | 608.90 | 609.40 | 13 |
2009-01-09 | Perforation | 705.50 | 706.50 | 13 |
2009-01-21 | Perforation | 615.10 | 615.60 | 13 |
2009-01-30 | Fracture | 615.10 | 615.60 | 0 |
2009-01-30 | Fracture | 608.90 | 609.40 | 0 |
2009-01-30 | Fracture | 588.40 | 592.50 | 0 |
2009-01-30 | Fracture | 584.70 | 585.70 | 0 |
2009-01-30 | Fracture | 569.60 | 570.10 | 0 |
2009-01-30 | Fracture | 554.90 | 555.40 | 0 |
2009-01-30 | Fracture | 520.40 | 520.90 | 0 |
2009-01-30 | Fracture | 513.20 | 513.70 | 0 |
2009-01-30 | Fracture | 504.80 | 505.80 | 0 |
2009-01-19 | Bridge Plug, No Cement | 690.00 | 690.30 | 0 |
2009-01-30 | Fracture | 497.10 | 497.60 | 0 |
2009-01-30 | Fracture | 475.10 | 475.60 | 0 |
2009-01-30 | Fracture | 465.30 | 466.80 | 0 |
2009-01-30 | Fracture | 450.90 | 451.40 | 0 |
2009-01-30 | Fracture | 352.80 | 353.80 | 0 |
2009-01-30 | Fracture | 329.40 | 329.90 | 0 |
2009-01-30 | Fracture | 239.60 | 240.10 | 0 |
2009-01-21 | Perforation | 239.60 | 240.10 | 13 |
2009-01-21 | Perforation | 329.40 | 329.90 | 13 |
2009-01-21 | Perforation | 352.80 | 353.80 | 13 |
2009-01-21 | Perforation | 450.90 | 451.40 | 13 |
2009-01-21 | Perforation | 465.30 | 466.80 | 13 |
2009-01-21 | Perforation | 475.10 | 475.60 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2015 | 2950 | 0.0 | 0.0 | 0.0 |
2016 | 8765 | 0.0 | 0.0 | 0.0 |
2017 | 8747 | 0.0 | 0.0 | 0.0 |
2018 | 8759 | 0.0 | 0.0 | 0.0 |
2019 | 6597 | 0.0 | 0.0 | 0.0 |
2020 | 2083 | 0.0 | 0.0 | 0.0 |
For data sources see[5]