If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0324250105000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.710492,"lon":-113.423528,"icon":""}]} |
Location: 00/05-01-032-25W4/0 | |
Location Alias: 00/05-01-32-25 W4M | |
Location Alias 2: 00/05-01-032-25 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 032 | |
Meridian: 4 | |
Range: 25 | |
Section: 01 | |
County/Municipality: Kneehill County | |
Well Name: EMBER SD TWINING 5-1-32-25 | |
Operator Name: Ember Resources Inc. | |
License Number: 0427376 | |
License Date: 2010-12-09 | |
License Status: Issued | |
Spud Date: 2010-12-20 | |
Final Drill Date: 2010-12-21 | |
Well Total Depth: 1037.00 m | |
Surface Hole Latitude: 51.710492 | |
Surface Hole Longitude: -113.423528 |
Date | Event |
---|---|
2010-12-09 | Obtained License |
2010-12-20 | Direction Drilling Operation Performed - Deviate |
2010-12-20 | Surface Casing Operation Performed |
2010-12-21 | Finished Drilling |
2010-12-21 | Production Casing Operation Performed |
2010-12-21 | Well Mode changed to Drilled and Cased |
2010-12-22 | Rig Released |
2011-01-18 | Well Log Performed |
2011-02-06 | Perforation Treatment Performed - Jet Perforation |
2011-02-07 | Perforation Treatment Performed - Jet Perforation |
2011-02-21 | Perforation Treatment Performed - Fractured |
2011-02-25 | Well Fluid changed to Coalbed Methane-Coals and Other |
2011-02-25 | Well Mode changed to Testing |
2011-09-01 | Well Began Production |
2011-09-01 | Well Fluid changed to Coalbed Methane-Coals and Other |
2011-09-01 | Well Mode changed to Flowing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2010-12-20 | 0.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-02-06 | Perforation | 739.00 | 740.00 | 13 |
2011-02-07 | Perforation | 505.80 | 506.80 | 13 |
2011-02-07 | Perforation | 510.50 | 511.00 | 13 |
2011-02-07 | Perforation | 427.00 | 429.00 | 13 |
2011-02-07 | Perforation | 497.00 | 501.00 | 13 |
2011-02-07 | Perforation | 321.00 | 324.00 | 13 |
2011-02-07 | Perforation | 376.10 | 377.90 | 13 |
2011-02-07 | Perforation | 501.50 | 504.00 | 13 |
2011-02-07 | Perforation | 363.80 | 364.30 | 13 |
2011-02-07 | Perforation | 377.90 | 378.10 | 13 |
2011-02-07 | Perforation | 297.00 | 297.50 | 13 |
2011-02-06 | Perforation | 744.30 | 745.30 | 13 |
2011-02-07 | Perforation | 358.00 | 359.00 | 13 |
2011-02-07 | Perforation | 637.70 | 638.20 | 13 |
2011-02-07 | Perforation | 643.10 | 643.60 | 13 |
2011-02-07 | Perforation | 625.80 | 626.80 | 13 |
2011-02-07 | Perforation | 631.30 | 632.80 | 13 |
2011-02-07 | Perforation | 664.20 | 664.70 | 13 |
2011-02-07 | Perforation | 665.70 | 666.20 | 13 |
2011-02-07 | Perforation | 648.70 | 649.70 | 13 |
2011-02-07 | Perforation | 661.40 | 661.90 | 13 |
2011-02-07 | Perforation | 608.60 | 609.60 | 13 |
2011-02-07 | Perforation | 490.00 | 490.50 | 13 |
2011-02-07 | Perforation | 550.40 | 550.90 | 13 |
2011-02-07 | Perforation | 554.90 | 555.40 | 13 |
2011-02-07 | Perforation | 541.20 | 541.70 | 13 |
2011-02-07 | Perforation | 547.70 | 548.70 | 13 |
2011-02-07 | Perforation | 590.10 | 590.60 | 13 |
2011-02-07 | Perforation | 597.20 | 597.70 | 13 |
2011-02-07 | Perforation | 565.50 | 565.80 | 13 |
2011-02-07 | Perforation | 564.80 | 565.50 | 13 |
2011-02-21 | Fracture | 321.00 | 504.00 | 0 |
2011-02-21 | Fracture | 661.40 | 666.20 | 0 |
2011-02-07 | Perforation | 493.90 | 494.40 | 13 |
2011-02-21 | Fracture | 297.00 | 649.70 | 0 |
2011-02-07 | Perforation | 422.90 | 423.40 | 13 |
2011-02-07 | Perforation | 488.60 | 489.10 | 13 |
2011-02-07 | Perforation | 491.20 | 497.10 | 13 |
2011-02-07 | Perforation | 513.60 | 514.10 | 13 |
2011-02-07 | Perforation | 515.20 | 515.70 | 13 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 2940 | 0.0 | 0.0 | 0.0 |
2012 | 8591 | 0.0 | 0.0 | 0.0 |
2013 | 8640 | 0.0 | 0.0 | 0.0 |
2014 | 8704 | 0.0 | 0.0 | 0.0 |
2015 | 8565 | 0.0 | 0.0 | 0.0 |
2016 | 8736 | 0.0 | 0.0 | 0.0 |
2017 | 8698 | 0.0 | 0.0 | 0.0 |
2018 | 8601 | 0.0 | 0.0 | 0.0 |
2019 | 8708 | 0.0 | 0.0 | 0.0 |
2020 | 2162 | 0.0 | 0.0 | 0.0 |
For data sources see[6]