If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0324243408020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.783584,"lon":-113.313179,"icon":""}]} |
Location: 02/08-34-032-24W4/0 | |
Location Alias: 02/08-34-32-24 W4M | |
Location Alias 2: 02/08-34-032-24 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 032 | |
Meridian: 4 | |
Range: 24 | |
Section: 34 | |
County/Municipality: Kneehill County | |
Well Name: EMBER 102 TWINING 8-34-32-24 | |
Operator Name: Ember Resources Inc. | |
License Number: 0411236 | |
License Date: 2009-06-30 | |
License Status: Amended | |
Spud Date: 2009-10-15 | |
Final Drill Date: 2009-11-04 | |
Well Total Depth: 938.00 m | |
Surface Hole Latitude: 51.783584 | |
Surface Hole Longitude: -113.313179 |
Date | Event |
---|---|
2009-06-30 | Obtained License |
2009-10-15 | Lost Circulation Occurred |
2009-10-15 | Surface Casing Operation Performed |
2009-11-04 | Finished Drilling |
2009-11-04 | Production Casing Operation Performed |
2009-11-04 | Rig Released |
2009-11-04 | Well Mode changed to Drilled and Cased |
2009-11-13 | Well Log Performed |
2009-12-04 | Perforation Treatment Performed - Jet Perforation |
2009-12-07 | Perforation Treatment Performed - Fractured |
2009-12-09 | Well Fluid changed to Gas |
2009-12-09 | Well Mode changed to Testing |
2009-12-11 | Well Fluid changed to Gas |
2009-12-11 | Well Mode changed to Test Completed |
2009-12-13 | Perforation Treatment Performed - Jet Perforation |
2009-12-18 | Perforation Treatment Performed - Jet Perforation |
2010-01-04 | Perforation Treatment Performed - Fractured |
2010-01-08 | Well Fluid changed to Coalbed Methane-Coals and Other |
2010-01-08 | Well Mode changed to Testing |
2010-01-17 | Well Began Production |
2010-01-17 | Well Fluid changed to Coalbed Methane-Coals and Other |
2010-01-17 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2009-12-04 | Perforation | 838.00 | 839.00 | 13 |
2009-12-18 | Perforation | 313.90 | 314.40 | 13 |
2009-12-18 | Perforation | 487.00 | 488.50 | 13 |
2009-12-18 | Perforation | 317.00 | 318.00 | 13 |
2009-12-18 | Perforation | 374.10 | 374.60 | 13 |
2009-12-18 | Perforation | 363.70 | 364.20 | 13 |
2009-12-18 | Perforation | 320.40 | 321.40 | 13 |
2009-12-18 | Perforation | 463.80 | 465.30 | 13 |
2009-12-18 | Perforation | 548.90 | 549.90 | 13 |
2009-12-18 | Perforation | 540.50 | 541.50 | 13 |
2009-12-18 | Perforation | 525.90 | 526.90 | 13 |
2009-12-07 | Fracture | 838.00 | 839.00 | 0 |
2009-12-18 | Perforation | 571.10 | 572.10 | 13 |
2009-12-18 | Perforation | 562.70 | 563.70 | 13 |
2009-12-18 | Perforation | 555.10 | 556.10 | 13 |
2009-12-18 | Perforation | 473.40 | 474.40 | 13 |
2009-12-18 | Perforation | 472.00 | 472.50 | 13 |
2009-12-18 | Perforation | 468.10 | 468.60 | 13 |
2009-12-18 | Perforation | 506.00 | 506.50 | 13 |
2009-12-18 | Perforation | 516.30 | 516.80 | 13 |
2009-12-18 | Perforation | 478.80 | 479.30 | 13 |
2010-01-04 | Fracture | 317.00 | 488.50 | 0 |
2009-12-13 | Perforation | 574.60 | 575.60 | 13 |
2010-01-04 | Fracture | 313.90 | 572.50 | 0 |
2009-12-18 | Perforation | 421.00 | 423.50 | 13 |
2009-12-18 | Perforation | 414.70 | 416.20 | 13 |
2009-12-18 | Perforation | 403.00 | 403.50 | 13 |
2009-12-18 | Perforation | 460.80 | 461.30 | 13 |
2009-12-18 | Perforation | 431.40 | 431.90 | 13 |
2009-12-18 | Perforation | 429.10 | 429.60 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2009 | 24 | 0.0 | 0.0 | 0.0 |
2010 | 8370 | 0.0 | 0.0 | 0.0 |
2011 | 8734 | 0.0 | 0.0 | 0.0 |
2012 | 8679 | 0.0 | 0.0 | 0.0 |
2013 | 8697 | 0.0 | 0.0 | 0.0 |
2014 | 8699 | 0.0 | 0.0 | 0.0 |
2015 | 8754 | 0.0 | 0.0 | 0.0 |
2016 | 8776 | 0.0 | 0.0 | 0.0 |
2017 | 8748 | 0.0 | 0.0 | 0.0 |
2018 | 8714 | 0.0 | 0.0 | 0.0 |
2019 | 8697 | 0.0 | 0.0 | 0.0 |
2020 | 2152 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2009-10-15 | Lost Circulation | 48.00 | 54.00 |
For data sources see[6]