X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0324243313000

Well Details

Well ID: 0324243313000
Loading map...
Location: 00/13-33-032-24W4/0
Location Alias: 00/13-33-32-24 W4M
Location Alias 2: 00/13-33-032-24 W4/00
Country: Canada
Province: Alberta
Township: 032
Meridian: 4
Range: 24
Section: 33
County/Municipality: Kneehill County
Well Name: PINE CLIFF HZ TWINING 13-33-32-24
Operator Name: Pine Cliff Energy Ltd.
License Number: 0490731
License Date: 2018-08-30
License Status: Issued
Spud Date: 2018-11-24
Final Drill Date: 2018-12-07
Well Total Depth: 3216.00 m
Surface Hole Latitude: 51.779339
Surface Hole Longitude: -113.358085

For data sources see[1][2]

Well History

Date Event
2018-08-30 Obtained License
2018-11-25 Direction Drilling Operation Performed - Deviate
2018-11-25 Surface Casing Operation Performed
2018-11-28 Direction Drilling Operation Performed - Horizontal
2018-11-30 Intermediate Casing Operation Performed
2018-11-30 Well Log Performed
2018-12-07 Finished Drilling
2018-12-07 Well Log Performed
2018-12-07 Well Mode changed to Drilled and Cased
2018-12-08 Liner Casing Operation Performed
2018-12-09 Rig Released
2018-12-13 Well Log Performed
2018-12-15 Perforation Treatment Performed - Multi-Stage Fracture
2018-12-22 Well Began Production
2018-12-22 Well Fluid changed to Crude Oil
2018-12-22 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2018-11-24 Precision Drilling Corporation 196 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2018-11-25 334.00 Deviate (5 - 79 degrees)
2018-11-28 1796.20 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-12-15 Multi-Stage Fracture 3166.30 3166.40 0
2018-12-15 Multi-Stage Fracture 2699.00 2699.10 0
2018-12-15 Multi-Stage Fracture 2648.70 2648.80 0
2018-12-15 Multi-Stage Fracture 2586.20 2586.30 0
2018-12-15 Multi-Stage Fracture 2547.30 2547.40 0
2018-12-15 Multi-Stage Fracture 2508.20 2508.30 0
2018-12-15 Multi-Stage Fracture 2469.20 2469.30 0
2018-12-15 Multi-Stage Fracture 2429.80 2429.90 0
2018-12-15 Multi-Stage Fracture 2390.30 2390.40 0
2018-12-15 Multi-Stage Fracture 2351.20 2351.30 0
2018-12-15 Multi-Stage Fracture 2312.00 2312.10 0
2018-12-15 Multi-Stage Fracture 3115.50 3115.60 0
2018-12-15 Multi-Stage Fracture 2272.50 2272.60 0
2018-12-15 Multi-Stage Fracture 2233.40 2233.50 0
2018-12-15 Multi-Stage Fracture 2182.40 2182.50 0
2018-12-15 Multi-Stage Fracture 2131.50 2131.60 0
2018-12-15 Multi-Stage Fracture 2080.40 2080.50 0
2018-12-15 Multi-Stage Fracture 2006.60 2006.70 0
2018-12-15 Multi-Stage Fracture 1967.40 1967.50 0
2018-12-15 Multi-Stage Fracture 3076.20 3076.30 0
2018-12-15 Multi-Stage Fracture 3036.50 3036.60 0
2018-12-15 Multi-Stage Fracture 2962.70 2962.80 0
2018-12-15 Multi-Stage Fracture 2911.80 2911.90 0
2018-12-15 Multi-Stage Fracture 2849.40 2849.50 0
2018-12-15 Multi-Stage Fracture 2787.60 2787.70 0
2018-12-15 Multi-Stage Fracture 2749.10 2749.20 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-12-15 2018-12-15 1,654 3,584 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 85.0322 N/A
40/70 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 12.7944 N/A
15% HCl Acid Calfrac Acid Hydrochloric acid 7647-01-0 100 1.3787 N/A
Water 7732-18-5 100 1.3787 N/A
DWP-966. Biocide Calfrac Bactericide/Biocide Bronopol 52-51-7 100 0.0376 N/A
Methanol 67-56-1 100 0.0376 N/A
Water 7732-18-5 100 0.0376 N/A
DWP-905. High pH Enzyme Breaker Calfrac Breaker 1.2-Ethanediol 107-21-1 100 0.079 N/A
Non-Hazardous Ingredients Trade Secret 100 0.079 N/A
DWP-107. Clay Control / Low pH Adjuster Calfrac Buffer Non-Hazardous Ingredients Trade Secret 100 0.0832 N/A
Organic acid 8454 100 0.0832 N/A
DWP-126. Crosslinker Calfrac Crosslinker Borate Salt #1 9033 100 0.1243 N/A
Borate Salt #2 9033 100 0.1243 N/A
Water 7732-18-5 100 0.1243 N/A
DWP-101. Gel Slurry Calfrac Gelling Agent Guar gum 9000-30-0 100 0.3992 N/A
Non-Hazardous Ingredients Trade Secret 100 0.3992 N/A
CalSurf 9400. Flowback Surfactant Calfrac Surfactant Ethoxylated Alcohols Trade Secret 100 0.071 N/A
Methanol 67-56-1 100 0.071 N/A
Non-Hazardous Ingredients Trade Secret 100 0.071 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2018-12-12 2018-12-13 Surface Water - Runoff 4110

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 48 0.0 0.0 0.0
2019 8312 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-12-09 No Incident Encountered 0.00 0.00
2018-12-22 No Incident Encountered 0.00 0.00

For data sources see[10]

References