X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0324243006000

Well Details

Well ID: 0324243006000
Loading map...
Location: 00/06-30-032-24W4/0
Location Alias: 00/06-30-32-24 W4M
Location Alias 2: 00/06-30-032-24 W4/00
Country: Canada
Province: Alberta
Township: 032
Meridian: 4
Range: 24
Section: 30
County/Municipality: Kneehill County
Well Name: EOG TWINING 6-30-32-24
Operator Name: Pine Cliff Energy Ltd.
License Number: 0021938
License Date: 1962-01-11
License Status: Abandoned
Spud Date: 1962-01-22
Final Drill Date: 1962-02-08
Well Total Depth: 1691.60 m
Surface Hole Latitude: 51.770893
Surface Hole Longitude: -113.397581

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1962-01-11 Obtained License
1962-02-08 Finished Drilling
1962-02-08 Well Mode changed to Drilled and Cased
1962-02-09 Drill Stem Test Performed
1962-02-10 Drill Stem Test Performed
1962-02-11 Drill Stem Test Performed
1962-02-12 Drill Stem Test Performed
1962-02-14 Production Casing Operation Performed
1962-03-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-03-08 Perforation Treatment Performed - Jet Perforation
1962-03-12 Well Began Production
1962-03-12 Well Fluid changed to Crude Oil
1962-03-12 Well Mode changed to Pumping
1962-08-15 Perforation Treatment Performed - Cement Squeeze
1962-08-17 Perforation Treatment Performed - Jet Perforation
1962-08-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1970-11-12 Perforation Treatment Performed - Jet Perforation
1970-11-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1971-03-01 Well Began Injection
1971-03-01 Well Fluid changed to Water
1971-03-01 Well Type changed to Disposal
1978-05-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-05-15 Perforation Treatment Performed - Cement Squeeze
1978-05-15 Perforation Treatment Performed - Jet Perforation
1978-05-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-03-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-03-29 Perforation Treatment Performed - Jet Perforation
1988-03-29 Well Log Performed
1990-05-17 Well Log Performed
1990-05-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-05-18 Plug Back Performed
1990-05-18 Well Fluid changed to Water
1990-05-18 Well Mode changed to Abandoned Zone
1990-05-18 Well Type changed to Disposal
1991-01-18 Perforation Treatment Performed - Jet Perforation
1991-01-18 Well Log Performed
1991-01-20 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-10-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-10-28 Perforation Treatment Performed - Jet Perforation
2000-10-28 Plug Back Performed
2000-10-28 Well Log Performed
2000-10-29 Perforation Treatment Performed - Cement Plug
2000-10-29 Perforation Treatment Performed - Remedial Casing
2000-11-06 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1962-03-08 Perforation 1673.00 1673.70 7
1970-11-12 Perforation 1667.00 1668.20 13
1970-11-13 Acid Treatment 1661.80 1668.20 0
1978-05-15 Perforation 1623.70 1624.00 16
1978-05-15 Acid Treatment 1623.70 1624.00 0
1978-05-15 Cement Squeeze 1623.70 1624.00 0
1978-05-27 Acid Treatment 1661.80 1673.40 0
1988-03-29 Perforation 1679.40 1682.40 13
1988-03-29 Acid Treatment 1661.80 1682.40 0
1990-05-18 Packing Device Capped w/Cement 1424.00 1647.50 0
1991-01-18 Perforation 1433.00 1435.00 14
1962-03-08 Perforation 1675.80 1676.40 7
1991-01-20 Acid Treatment 1433.00 1435.00 0
2000-10-28 Packing Device Capped w/Cement 1419.00 1427.00 0
2000-10-28 Perforation 259.00 259.80 10
2000-10-29 Remedial Casing Cementing 259.00 259.80 0
2000-10-29 Cement Plug 211.70 259.80 0
1962-03-08 Perforation 1680.70 1681.90 7
1962-03-08 Acid Treatment 1673.00 1681.90 0
1962-08-15 Cement Squeeze 1673.00 1681.90 0
1962-08-17 Perforation 1672.70 1673.40 13
1962-08-18 Acid Treatment 1672.70 1673.40 0
1970-11-12 Perforation 1661.80 1662.40 13
1970-11-12 Perforation 1664.20 1665.40 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 5285 0.0 0.0 0.0
1968 6958 0.0 0.0 0.0
1969 4645 0.0 0.0 0.0
1970 3032 0.0 0.0 0.0
1971 0 0.0 0.0 0.0
1972 0 0.0 0.0 0.0
1973 0 0.0 0.0 0.0
1974 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0

For data sources see[5]

References