X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0324241405000

Well Details

Well ID: 0324241405000
Loading map...
Location: 00/05-14-032-24W4/0
Location Alias: 00/05-14-32-24 W4M
Location Alias 2: 00/05-14-032-24 W4/00
Country: Canada
Province: Alberta
Township: 032
Meridian: 4
Range: 24
Section: 14
County/Municipality: Kneehill County
Well Name: PINE CLIFF HZ TWINING 5-14-32-24
Operator Name: Pine Cliff Energy Ltd.
License Number: 0496183
License Date: 2019-10-29
License Status: Amended
Spud Date: 2019-11-30
Final Drill Date: 2019-12-11
Well Total Depth: 3370.00 m
Surface Hole Latitude: 51.737266
Surface Hole Longitude: -113.337189

For data sources see[1][2]


Directional Drilling

Start Date Depth (m) Reason
2019-12-03 1360.27 Deviate (5 - 79 degrees)
2019-12-05 1764.07 Horizontal

For data sources see[3]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-12-19 Multi-Stage Fracture 3328.60 3328.70 0
2019-12-20 Multi-Stage Fracture 2823.30 2823.40 0
2019-12-20 Multi-Stage Fracture 2778.60 2778.70 0
2019-12-20 Multi-Stage Fracture 2724.90 2725.00 0
2019-12-20 Multi-Stage Fracture 2671.20 2671.30 0
2019-12-20 Multi-Stage Fracture 2617.50 2617.60 0
2019-12-20 Multi-Stage Fracture 2550.60 2550.70 0
2019-12-20 Multi-Stage Fracture 2496.90 2497.00 0
2019-12-20 Multi-Stage Fracture 2390.40 2390.50 0
2019-12-20 Multi-Stage Fracture 2336.70 2336.80 0
2019-12-20 Multi-Stage Fracture 2283.00 2283.10 0
2019-12-19 Multi-Stage Fracture 3288.20 3328.30 0
2019-12-20 Multi-Stage Fracture 2229.30 2229.40 0
2019-12-20 Multi-Stage Fracture 2175.60 2175.70 0
2019-12-20 Multi-Stage Fracture 2121.90 2122.00 0
2019-12-20 Multi-Stage Fracture 2068.30 2068.40 0
2019-12-20 Multi-Stage Fracture 2001.30 2001.40 0
2019-12-20 Multi-Stage Fracture 1947.60 1947.70 0
2019-12-20 Multi-Stage Fracture 1893.90 1894.00 0
2019-12-20 Multi-Stage Fracture 1840.20 1840.30 0
2019-12-20 Multi-Stage Fracture 3234.50 3234.60 0
2019-12-20 Multi-Stage Fracture 3180.80 3180.90 0
2019-12-20 Multi-Stage Fracture 3113.90 3114.00 0
2019-12-20 Multi-Stage Fracture 3060.20 3060.30 0
2019-12-20 Multi-Stage Fracture 2993.30 2993.40 0
2019-12-20 Multi-Stage Fracture 2939.60 2939.70 0
2019-12-20 Multi-Stage Fracture 2885.90 2886.00 0

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-12-19 2019-12-20 1,635 3,106 N/A
2 2019-12-20 2019-12-20 1,635 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 82.9935 N/A
40/70 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 14.6278 N/A
15% HCl Acid Calfrac Acid Hydrochloric acid 7647-01-0 100 1.5984 N/A
Water 7732-18-5 100 1.5984 N/A
DWP-966. Biocide Calfrac Bactericide/Biocide Bronopol 52-51-7 100 0.0369 N/A
Methanol 67-56-1 100 0.0369 N/A
Water 7732-18-5 100 0.0369 N/A
DWP-905. High pH Enzyme Breaker Calfrac Breaker 1.2-Ethanediol 107-21-1 100 0.0776 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0776 N/A
DWP-107. Clay Control / Low pH Adjuster Calfrac Buffer Non-Hazardous Ingredients Trade Secret 100 0.0807 N/A
Organic acid 8454 100 0.0807 N/A
DWP-126. Crosslinker Calfrac Crosslinker Borate Salt #1 9033 100 0.1157 N/A
Borate Salt #2 9033 100 0.1157 N/A
Water 7732-18-5 100 0.1157 N/A
DWP-101. Gel Slurry Calfrac Gelling Agent Guar gum 9000-30-0 100 0.3961 N/A
Non-Hazardous Ingredients Trade Secret 100 0.3961 N/A
CalSurf 9703. Advanced Nano Surfactant Calfrac Surfactant 2-Propanol 67-63-0 100 0.0723 N/A
Alkylamine 11757 100 0.0723 N/A
Linear alkyl benzene sulfonic acid 11757 100 0.0723 N/A
Non-Hazardous Ingredients 11757 100 0.0723 N/A
2 CalGuard 9000. Inhibitor Calfrac Corrosion Inhibitor Fatty acids. C14-18 and C16-18-unsatd.. Me esters 67762-26-9 100 0.0005 N/A
Hydrotreated kerosene 64742-47-8 100 0.0005 N/A

For data sources see[5]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 49 0.0 0.0 0.0
2020 1775 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-12-16 No Incident Encountered 0.00 0.00
2019-12-20 No Incident Encountered 0.00 0.00

For data sources see[7]

References