X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0324240712000

Well Details

Well ID: 0324240712000
Loading map...
Location: 00/12-07-032-24W4/0
Location Alias: 00/12-07-32-24 W4M
Location Alias 2: 00/12-07-032-24 W4/00
Country: Canada
Province: Alberta
Township: 032
Meridian: 4
Range: 24
Section: 07
County/Municipality: Kneehill County
Well Name: SOC TWINING 12-7-32-24
Operator Name: Pine Cliff Energy Ltd.
License Number: 0087531
License Date: 1980-12-08
License Status: Issued
Spud Date: 1981-01-19
Final Drill Date: 1981-02-04
Well Total Depth: 1711.00 m
Surface Hole Latitude: 51.732435
Surface Hole Longitude: -113.401503

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-12-08 Obtained License
1981-02-04 Finished Drilling
1981-02-04 Well Mode changed to Drilled and Cased
1981-02-07 Drill Stem Test Performed
1981-02-09 Production Casing Operation Performed
1981-02-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-02-15 Perforation Treatment Performed - Jet Perforation
1981-02-25 Perforation Treatment Performed - Cement Squeeze
1981-02-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-02-26 Perforation Treatment Performed - Jet Perforation
1981-03-05 Perforation Treatment Performed - Cement Squeeze
1981-03-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-03-06 Perforation Treatment Performed - Jet Perforation
1981-03-16 Well Began Production
1981-03-16 Well Fluid changed to Crude Oil
1981-03-16 Well Mode changed to Pumping
1985-05-07 Perforation Treatment Performed - Jet Perforation
1985-05-07 Well Log Performed
1985-05-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-06-25 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1981-02-15 Perforation 1691.00 1694.00 13
1985-05-07 Perforation 1655.00 1662.00 13
1985-05-09 Acid Treatment 1655.00 1679.00 0
1987-06-25 Acid Treatment 1655.00 1679.00 0
1981-02-15 Acid Treatment 1691.00 1694.00 0
1981-02-25 Cement Squeeze 1691.00 1694.00 0
1981-02-26 Perforation 1683.50 1686.50 13
1981-02-26 Acid Treatment 1683.50 1686.50 0
1981-03-05 Cement Squeeze 1683.50 1686.50 0
1981-03-06 Perforation 1675.00 1679.00 13
1981-03-06 Acid Treatment 1675.00 1679.00 0
1985-05-07 Perforation 1664.00 1670.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1981 3880 0.0 0.0 0.0
1982 5816 0.0 0.0 0.0
1983 8088 0.0 0.0 0.0
1984 8471 0.0 0.0 0.0
1985 8352 0.0 0.0 0.0
1986 8735 0.0 0.0 0.0
1987 8423 0.0 0.0 0.0
1988 8783 0.0 0.0 0.0
1989 8591 0.0 0.0 0.0
1990 8631 0.0 0.0 0.0
1991 8540 0.0 0.0 0.0
1992 8759 0.0 0.0 0.0
1993 8735 0.0 0.0 0.0
1994 8759 0.0 0.0 0.0
1995 8731 0.0 0.0 0.0
1996 8742 0.0 0.0 0.0
1997 8255 0.0 0.0 0.0
1998 8759 0.0 0.0 0.0
1999 8729 0.0 0.0 0.0
2000 8783 0.0 0.0 0.0
2001 8759 0.0 0.0 0.0
2002 8687 0.0 0.0 0.0
2003 8639 0.0 0.0 0.0
2004 8532 0.0 0.0 0.0
2005 8661 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8351 0.0 0.0 0.0
2008 8595 0.0 0.0 0.0
2009 8615 0.0 0.0 0.0
2010 8735 0.0 0.0 0.0
2011 8715 0.0 0.0 0.0
2012 8567 0.0 0.0 0.0
2013 8280 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 7775 0.0 0.0 0.0
2016 8447 0.0 0.0 0.0
2017 8003 0.0 0.0 0.0
2018 8423 0.0 0.0 0.0
2019 8400 0.0 0.0 0.0
2020 2136 0.0 0.0 0.0

For data sources see[5]

References