X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0324240614020

Well Details

Well ID: 0324240614020
Loading map...
Location: 02/14-06-032-24W4/0
Location Alias: 02/14-06-32-24 W4M
Location Alias 2: 02/14-06-032-24 W4/00
Country: Canada
Province: Alberta
Township: 032
Meridian: 4
Range: 24
Section: 06
County/Municipality: Kneehill County
Well Name: ARTIS HZ TWINING 14-6-32-24
Operator Name: Artis Exploration Ltd.
License Number: 0481254
License Date: 2016-11-07
License Status: Amended
Spud Date: 2016-11-16
Final Drill Date: 2016-11-26
Well Total Depth: 4514.00 m
Surface Hole Latitude: 51.700702
Surface Hole Longitude: -113.384006

For data sources see[1][2]

Well History

Date Event
2016-11-07 Obtained License
2016-11-16 Surface Casing Operation Performed
2016-11-19 Direction Drilling Operation Performed - Deviate
2016-11-20 Direction Drilling Operation Performed - Horizontal
2016-11-26 Finished Drilling
2016-11-26 Well Log Performed
2016-11-26 Well Mode changed to Drilled and Cased
2016-11-28 Production Casing Operation Performed
2016-11-28 Rig Released
2016-12-02 Well Log Performed
2016-12-16 Perforation Treatment Performed - Multi-Stage Fracture
2016-12-19 Perforation Treatment Performed - Jet Perforation
2016-12-19 Perforation Treatment Performed - Multi-Stage Fracture
2016-12-20 Perforation Treatment Performed - Jet Perforation
2016-12-20 Perforation Treatment Performed - Multi-Stage Fracture
2016-12-21 Perforation Treatment Performed - Jet Perforation
2016-12-21 Perforation Treatment Performed - Multi-Stage Fracture
2016-12-22 Perforation Treatment Performed - Jet Perforation
2016-12-22 Perforation Treatment Performed - Multi-Stage Fracture
2016-12-23 Perforation Treatment Performed - Jet Perforation
2016-12-23 Perforation Treatment Performed - Multi-Stage Fracture
2016-12-27 Perforation Treatment Performed - Jet Perforation
2016-12-27 Perforation Treatment Performed - Multi-Stage Fracture
2016-12-28 Perforation Treatment Performed - Jet Perforation
2016-12-28 Perforation Treatment Performed - Multi-Stage Fracture
2016-12-29 Perforation Treatment Performed - Jet Perforation
2016-12-29 Perforation Treatment Performed - Multi-Stage Fracture
2016-12-30 Perforation Treatment Performed - Jet Perforation
2016-12-30 Perforation Treatment Performed - Multi-Stage Fracture
2016-12-31 Perforation Treatment Performed - Jet Perforation
2016-12-31 Perforation Treatment Performed - Multi-Stage Fracture
2017-01-01 Well Began Production
2017-01-01 Well Fluid changed to Crude Oil
2017-01-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2016-11-19 2002.10 Deviate (5 - 79 degrees)
2016-11-20 2403.70 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2016-12-16 Multi-Stage Fracture 4475.00 4488.10 0
2016-12-19 Multi-Stage Fracture 4325.00 4346.00 0
2016-12-28 Multi-Stage Fracture 3175.00 3196.00 0
2016-12-28 Perforation 3145.00 3146.00 17
2016-12-28 Perforation 3135.00 3136.00 17
2016-12-28 Perforation 3125.00 3126.00 17
2016-12-28 Multi-Stage Fracture 3125.00 3146.00 0
2016-12-29 Perforation 3095.00 3096.00 17
2016-12-29 Perforation 3085.00 3086.00 17
2016-12-29 Perforation 3075.00 3076.00 17
2016-12-29 Multi-Stage Fracture 3075.00 3096.00 0
2016-12-29 Perforation 3045.00 3046.00 17
2016-12-20 Perforation 4295.00 4296.00 17
2016-12-29 Perforation 3035.00 3036.00 17
2016-12-29 Perforation 3025.00 3026.00 17
2016-12-29 Multi-Stage Fracture 3025.00 3046.00 0
2016-12-29 Perforation 2995.00 2996.00 17
2016-12-29 Perforation 2985.00 2986.00 17
2016-12-29 Perforation 2975.00 2976.00 17
2016-12-29 Multi-Stage Fracture 2975.00 2996.00 0
2016-12-29 Perforation 2945.00 2946.00 17
2016-12-29 Perforation 2935.00 2936.00 17
2016-12-29 Perforation 2925.00 2926.00 17
2016-12-20 Perforation 4275.00 4276.00 17
2016-12-29 Multi-Stage Fracture 2925.00 2946.00 0
2016-12-29 Perforation 2895.00 2896.00 17
2016-12-29 Perforation 2885.00 2886.00 17
2016-12-29 Perforation 2875.00 2876.00 17
2016-12-29 Multi-Stage Fracture 2875.00 2896.00 0
2016-12-30 Perforation 2845.00 2846.00 17
2016-12-30 Perforation 2835.00 2836.00 17
2016-12-30 Perforation 2825.00 2826.00 17
2016-12-30 Multi-Stage Fracture 2825.00 2846.00 0
2016-12-30 Perforation 2795.00 2796.00 17
2016-12-20 Multi-Stage Fracture 4275.00 4296.00 0
2016-12-30 Perforation 2785.00 2786.00 17
2016-12-30 Perforation 2775.00 2776.00 17
2016-12-30 Multi-Stage Fracture 2775.00 2796.00 0
2016-12-30 Perforation 2745.00 2746.00 17
2016-12-30 Perforation 2735.00 2736.00 17
2016-12-30 Perforation 2725.00 2726.00 17
2016-12-30 Multi-Stage Fracture 2725.00 2746.00 0
2016-12-30 Perforation 2695.00 2696.00 17
2016-12-30 Perforation 2685.00 2686.00 17
2016-12-30 Perforation 2675.00 2676.00 17
2016-12-20 Perforation 4245.00 4246.00 17
2016-12-30 Multi-Stage Fracture 2675.00 2696.00 0
2016-12-30 Perforation 2645.00 2646.00 17
2016-12-30 Perforation 2635.00 2636.00 17
2016-12-30 Perforation 2625.00 2626.00 17
2016-12-30 Multi-Stage Fracture 2625.00 2646.00 0
2016-12-30 Perforation 2595.00 2596.00 17
2016-12-30 Perforation 2585.00 2586.00 17
2016-12-30 Perforation 2575.00 2576.00 17
2016-12-30 Multi-Stage Fracture 2575.00 2596.00 0
2016-12-30 Perforation 2545.00 2546.00 17
2016-12-20 Perforation 4225.00 4226.00 17
2016-12-30 Perforation 2535.00 2536.00 17
2016-12-30 Perforation 2525.00 2526.00 17
2016-12-30 Multi-Stage Fracture 2525.00 2546.00 0
2016-12-31 Perforation 2495.00 2496.00 17
2016-12-31 Perforation 2485.00 2486.00 17
2016-12-31 Perforation 2475.00 2476.00 17
2016-12-31 Multi-Stage Fracture 2475.00 2496.00 0
2016-12-20 Multi-Stage Fracture 4225.00 4246.00 0
2016-12-20 Perforation 4195.00 4196.00 17
2016-12-20 Perforation 4185.00 4186.00 17
2016-12-20 Perforation 4175.00 4176.00 17
2016-12-19 Perforation 4445.00 4446.00 17
2016-12-20 Multi-Stage Fracture 4175.00 4196.00 0
2016-12-20 Perforation 4145.00 4146.00 17
2016-12-20 Perforation 4135.00 4136.00 17
2016-12-20 Perforation 4125.00 4126.00 17
2016-12-20 Multi-Stage Fracture 4125.00 4146.00 0
2016-12-20 Perforation 4095.00 4096.00 17
2016-12-20 Perforation 4085.00 4086.00 17
2016-12-20 Perforation 4075.00 4076.00 17
2016-12-20 Multi-Stage Fracture 4075.00 4096.00 0
2016-12-21 Perforation 4045.00 4046.00 17
2016-12-19 Perforation 4425.00 4426.00 17
2016-12-21 Perforation 4035.00 4036.00 17
2016-12-21 Perforation 4025.00 4026.00 17
2016-12-21 Multi-Stage Fracture 4025.00 4046.00 0
2016-12-21 Perforation 3995.00 3996.00 17
2016-12-21 Perforation 3985.00 3986.00 17
2016-12-21 Perforation 3975.00 3976.00 17
2016-12-21 Multi-Stage Fracture 3975.00 3996.00 0
2016-12-21 Perforation 3945.00 3946.00 17
2016-12-21 Perforation 3935.00 3936.00 17
2016-12-21 Perforation 3925.00 3926.00 17
2016-12-19 Multi-Stage Fracture 4425.00 4446.00 0
2016-12-21 Multi-Stage Fracture 3925.00 3946.00 0
2016-12-21 Perforation 3895.00 3896.00 17
2016-12-21 Perforation 3885.00 3886.00 17
2016-12-21 Perforation 3875.00 3876.00 17
2016-12-21 Multi-Stage Fracture 3875.00 3896.00 0
2016-12-21 Perforation 3845.00 3846.00 17
2016-12-21 Perforation 3835.00 3836.00 17
2016-12-21 Perforation 3825.00 3826.00 17
2016-12-21 Multi-Stage Fracture 3825.00 3846.00 0
2016-12-22 Perforation 3795.00 3796.00 17
2016-12-19 Perforation 4395.00 4396.00 17
2016-12-22 Perforation 3785.00 3786.00 17
2016-12-22 Perforation 3775.00 3776.00 17
2016-12-22 Multi-Stage Fracture 3775.00 3796.00 0
2016-12-22 Perforation 3745.00 3746.00 17
2016-12-22 Perforation 3735.00 3736.00 17
2016-12-22 Perforation 3725.00 3726.00 17
2016-12-22 Multi-Stage Fracture 3725.00 3746.00 0
2016-12-22 Perforation 3695.00 3696.00 17
2016-12-22 Perforation 3685.00 3686.00 17
2016-12-22 Perforation 3675.00 3676.00 17
2016-12-19 Perforation 4375.00 4376.00 17
2016-12-22 Multi-Stage Fracture 3675.00 3696.00 0
2016-12-22 Perforation 3645.00 3646.00 17
2016-12-22 Perforation 3635.00 3636.00 17
2016-12-22 Perforation 3625.00 3626.00 17
2016-12-22 Multi-Stage Fracture 3625.00 3646.00 0
2016-12-22 Perforation 3595.00 3596.00 17
2016-12-22 Perforation 3585.00 3586.00 17
2016-12-22 Perforation 3575.00 3576.00 17
2016-12-22 Multi-Stage Fracture 3575.00 3596.00 0
2016-12-23 Perforation 3545.00 3546.00 17
2016-12-19 Multi-Stage Fracture 4375.00 4396.00 0
2016-12-23 Perforation 3535.00 3536.00 17
2016-12-23 Perforation 3525.00 3526.00 17
2016-12-23 Multi-Stage Fracture 3525.00 3546.00 0
2016-12-23 Perforation 3495.00 3496.00 17
2016-12-23 Perforation 3485.00 3486.00 17
2016-12-23 Perforation 3475.00 3476.00 17
2016-12-23 Multi-Stage Fracture 3475.00 3496.00 0
2016-12-27 Perforation 3445.00 3446.00 17
2016-12-27 Perforation 3435.00 3436.00 17
2016-12-27 Perforation 3425.00 3426.00 17
2016-12-19 Perforation 4345.00 4346.00 17
2016-12-27 Multi-Stage Fracture 3425.00 3446.00 0
2016-12-27 Perforation 3395.00 3396.00 17
2016-12-27 Perforation 3385.00 3386.00 17
2016-12-27 Perforation 3375.00 3376.00 17
2016-12-27 Multi-Stage Fracture 3375.00 3396.00 0
2016-12-28 Perforation 3345.00 3346.00 17
2016-12-28 Perforation 3335.00 3336.00 17
2016-12-28 Perforation 3325.00 3326.00 17
2016-12-28 Multi-Stage Fracture 3325.00 3346.00 0
2016-12-28 Perforation 3295.00 3296.00 17
2016-12-19 Perforation 4325.00 4326.00 17
2016-12-28 Perforation 3285.00 3286.00 17
2016-12-28 Perforation 3275.00 3276.00 17
2016-12-28 Multi-Stage Fracture 3275.00 3296.00 0
2016-12-28 Perforation 3245.00 3246.00 17
2016-12-28 Perforation 3235.00 3236.00 17
2016-12-28 Perforation 3225.00 3226.00 17
2016-12-28 Multi-Stage Fracture 3225.00 3246.00 0
2016-12-28 Perforation 3195.00 3196.00 17
2016-12-28 Perforation 3185.00 3186.00 17
2016-12-28 Perforation 3175.00 3176.00 17

For data sources see[5]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2016-12-16 2016-12-31 2,288 41,874 N/A
2 2016-12-19 2016-12-31 2,288 0 N/A
3 2016-12-21 2016-12-31 2,288 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 88.2553 N/A
Sand (30/50) Ottawa Canyon Technical Services Aluminum Oxide 1344-28-1 100 4.3705 N/A
Crystalline silica. quartz 14808-60-7 100 4.3705 N/A
Iron Oxide 1309-37-1 100 4.3705 N/A
Titanium Oxide 13463-67-7 100 4.3705 N/A
Sand (40/70) Canyon Technical Services Aluminum Oxide 1344-28-1 100 3.4904 N/A
Crystalline silica. quartz 14808-60-7 100 3.4904 N/A
Iron Oxide 1309-37-1 100 3.4904 N/A
Titanium Oxide 13463-67-7 100 3.4904 N/A
Sand (50/140) Canyon Technical Services Aluminum Oxide 1344-28-1 100 0.4397 N/A
Crystalline silica. quartz 14808-60-7 100 0.4397 N/A
Iron Oxide 1309-37-1 100 0.4398 N/A
Titanium Oxide 13463-67-7 100 0.4398 N/A
HCL 15% Canyon Technical Services Acid Hydrogen Chloride 7647-01-0 100 1.359 N/A
Water 7732-18-5 100 1.359 N/A
Tolcide PS75LT Canyon Technical Services Bactericide/Biocide Tetrakis (Hydroxymethyl) Phosphonium Sulfate 55566-30-8 100 0.0126 N/A
Water 7732-18-5 100 0.0127 N/A
CAN-1000 Corrosion Inhibitor Canyon Technical Services Corrosion Inhibitor Refer to MSDS 8141 100 0.0087 N/A
CAN-1200 Anti-Sludge Agent / Non-Emulsifier Canyon Technical Services Demulsifier Refer to MSDS 8251 100 0.0119 N/A
CAN-2412 Non-emulsifier Canyon Technical Services Demulsifier 1-Hexanol. 2-ethyl-. manuf. of.
by-products from. distn. residues
68609-68-7 100 0.0813 N/A
Benzenesulfonic acid. dodecyl-.
compd. with 2-aminoethanol (1:1)
26836-07-7 100 0.0813 N/A
Methanol 67-56-1 100 0.0813 N/A
Poly(oxyethelyne. oxypropylene) copolymer. liquids 11/6/9003 100 0.0813 N/A
Water 7732-18-5 100 0.0813 N/A
CAN-2057 Friction Reducer Canyon Technical Services Gelling Agent No hazardous ingredients Not Available 100 0.0793 N/A
CAN-1101 Iron Control Reduction Canyon Technical Services Iron Control 2-Mercaptoethanol 60-24-2 100 0.018 N/A
Cupric Chloride 7447-39-4 100 0.018 N/A
Monoethanolamine 141-43-5 100 0.018 N/A
CAN-1402 Scale Inhibitor Canyon Technical Services Scale Inhibitor Methyl Alcohol 67-56-1 100 0.0336 N/A
Potassium Chloride 7447-40-7 100 0.0336 N/A
Water 7732-18-5 100 0.0336 N/A
CAN-1202 Acid Wetting Agent Canyon Technical Services Surfactant 1-Methoxy-2-Propanol 107-98-2 100 0.0127 N/A
Water 7732-18-5 100 0.0127 N/A
2 Prime Plus (30/50) Canyon Technical Services No specific ingredients Not Available 100 2.0641 N/A
3 CAN-2321 Breaker (Oxidizer Delayed HT) Canyon Technical Services Breaker Ammonium Persulfate 7727-54-0 100 0.0137 N/A
Crystalline silica. quartz 14808-60-7 100 0.0137 N/A
CAN-2102 pH Buffer (HpH) Canyon Technical Services Buffer Methyl Alcohol 67-56-1 100 0.043 N/A
Sodium Hydroxide 1310-73-2 100 0.043 N/A
Water 7732-18-5 100 0.043 N/A
CAN-2200S Crosslinker / pH buffer (Borate) Canyon Technical Services Crosslinker Monoethanolamine 141-43-5 100 0.0627 N/A
Water 7732-18-5 100 0.0627 N/A
CAN-2000 Gellant (Guar) Canyon Technical Services Gelling Agent Polysacharide Suspension Not Available 100 0.1067 N/A

For data sources see[6]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2016-12-10 2016-12-30 Surface Water - Runoff 38978

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 5871 0.0 0.0 0.0
2018 8422 0.0 0.0 0.0
2019 8457 0.0 0.0 0.0
2020 1980 0.0 0.0 0.0

For data sources see[8]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-11-20 No Incident Encountered 0.00 0.00
2017-01-22 No Incident Encountered 0.00 0.00

For data sources see[9]

References