X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0324233102000

Well Details

Well ID: 0324233102000
Loading map...
Location: 00/02-31-032-23W4/0
Location Alias: 00/02-31-32-23 W4M
Location Alias 2: 00/02-31-032-23 W4/00
Country: Canada
Province: Alberta
Township: 032
Meridian: 4
Range: 23
Section: 31
County/Municipality: Kneehill County
Well Name: SOC TWINING 2-31-32-23
Operator Name: Pine Cliff Energy Ltd.
License Number: 0376835
License Date: 2007-05-03
License Status: Suspension
Spud Date: 2007-05-16
Final Drill Date: 2007-05-20
Well Total Depth: 1648.00 m
Surface Hole Latitude: 51.783651
Surface Hole Longitude: -113.251598

For data sources see[1][2]

Well History

Date Event
2007-05-03 Obtained License
2007-05-17 Surface Casing Operation Performed
2007-05-19 Direction Drilling Operation Performed - Deviate
2007-05-20 Finished Drilling
2007-05-20 Well Mode changed to Drilled and Cased
2007-05-21 Well Log Performed
2007-05-22 Production Casing Operation Performed
2007-05-22 Rig Released
2007-05-23 Well Log Performed
2007-06-17 Well Log Performed
2007-06-18 Perforation Treatment Performed - Jet Perforation
2007-06-18 Well Log Performed
2007-06-20 Perforation Treatment Performed - Fractured
2007-07-05 Well Log Performed
2007-07-07 Well Log Performed
2007-07-08 Well Log Performed
2007-07-09 Well Log Performed
2007-07-10 Perforation Treatment Performed - Jet Perforation
2007-07-11 Perforation Treatment Performed - Remedial Casing
2007-07-13 Perforation Treatment Performed - Jet Perforation
2007-07-13 Well Log Performed
2007-07-14 Perforation Treatment Performed - Remedial Casing
2007-07-16 Well Log Performed
2007-07-19 Perforation Treatment Performed - Jet Perforation
2007-07-19 Well Log Performed
2007-07-30 Well Log Performed
2007-08-01 Perforation Treatment Performed - Remedial Casing
2007-08-22 Well Log Performed
2008-06-04 Well Began Production
2008-06-04 Well Fluid changed to Gas
2008-06-04 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2007-05-19 1127.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2007-06-18 Perforation 1609.00 1613.00 17
2007-06-20 Fracture 1609.00 1613.00 0
2007-07-10 Perforation 465.00 466.00 17
2007-07-11 Remedial Casing Cementing 465.00 466.00 0
2007-07-13 Perforation 404.00 405.00 14
2007-07-14 Remedial Casing Cementing 404.00 405.00 0
2007-07-19 Perforation 222.50 223.50 13
2007-08-01 Remedial Casing Cementing 222.50 223.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2008 2117 0.0 0.0 0.0
2009 474 0.0 0.0 0.0
2010 243 0.0 0.0 0.0
2011 42 0.0 0.0 0.0
2012 1164 0.0 0.0 0.0
2013 2948 0.0 0.0 0.0
2014 1181 0.0 0.0 0.0
2016 1440 0.0 0.0 0.0
2017 4392 0.0 0.0 0.0
2018 4225 0.0 0.0 0.0
2019 6600 0.0 0.0 0.0
2020 744 0.0 0.0 0.0

For data sources see[6]

References