X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0324231001000

Well Details

Well ID: 0324231001000
Loading map...
Location: 00/01-10-032-23W4/0
Location Alias: 00/01-10-32-23 W4M
Location Alias 2: 00/01-10-032-23 W4/00
Country: Canada
Province: Alberta
Township: 032
Meridian: 4
Range: 23
Section: 10
County/Municipality: Kneehill County
Well Name: 981384 GPINE 1-10-32-23
Operator Name: Trident Exploration (Alberta) Corp.
License Number: 0348161
License Date: 2006-01-09
License Status: Issued
Spud Date: 2006-01-24
Final Drill Date: 2006-01-26
Well Total Depth: 830.00 m
Surface Hole Latitude: 51.724939
Surface Hole Longitude: -113.176087

For data sources see[1][2]

Well History

Date Event
2006-01-09 Obtained License
2006-01-25 Surface Casing Operation Performed
2006-01-26 Finished Drilling
2006-01-26 Well Mode changed to Drilled and Cased
2006-01-27 Production Casing Operation Performed
2006-01-27 Rig Released
2006-02-04 Well Log Performed
2006-02-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-02-11 Perforation Treatment Performed - Jet Perforation
2006-02-11 Well Log Performed
2006-02-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-02-26 Perforation Treatment Performed - Jet Perforation
2006-02-26 Plug Back Performed
2006-02-26 Well Log Performed
2006-02-26 Well Mode changed to Abandoned Zone
2006-03-05 Perforation Treatment Performed - Fractured
2006-03-11 Well Log Performed
2007-09-28 Well Log Performed
2010-12-01 Perforation Treatment Performed - Jet Perforation
2010-12-01 Well Log Performed
2011-03-27 Perforation Treatment Performed - Fractured
2011-06-28 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2006-02-11 Perforation 728.00 730.00 17
2006-02-26 Perforation 470.70 471.10 17
2006-02-26 Perforation 460.80 461.10 17
2006-02-26 Perforation 447.60 447.90 17
2006-02-26 Perforation 416.00 418.40 17
2006-02-26 Perforation 414.10 414.60 17
2006-02-26 Perforation 409.60 410.60 17
2006-02-26 Perforation 407.60 407.90 17
2006-02-26 Perforation 406.80 407.10 17
2006-02-26 Perforation 404.90 405.40 17
2006-02-26 Perforation 395.70 396.00 17
2006-02-11 Packing Device Capped w/Cement 717.00 724.80 0
2006-02-26 Perforation 382.80 383.10 17
2006-02-26 Perforation 377.60 378.40 17
2006-02-26 Perforation 371.80 372.40 17
2006-02-26 Perforation 370.60 370.90 17
2006-02-26 Perforation 369.20 369.50 17
2006-02-26 Perforation 365.90 367.20 17
2006-02-26 Perforation 360.70 361.00 17
2006-02-26 Perforation 316.90 317.20 17
2006-02-26 Perforation 306.00 306.90 17
2006-02-26 Perforation 304.50 304.80 17
2006-02-11 Perforation 600.00 604.00 17
2006-03-05 Fracture 304.50 519.40 0
2010-12-01 Perforation 353.00 355.00 14
2010-12-01 Perforation 419.00 424.00 14
2011-03-27 Fracture 304.50 519.40 0
2006-02-11 Perforation 565.00 566.50 17
2006-02-26 Packing Device Capped w/Cement 555.00 563.00 0
2006-02-26 Perforation 519.10 519.40 17
2006-02-26 Perforation 515.60 515.90 17
2006-02-26 Perforation 497.30 497.60 17
2006-02-26 Perforation 480.00 480.30 17

For data sources see[4]



References