X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0324230410000

Well Details

Well ID: 0324230410000
Loading map...
Location: 00/10-04-032-23W4/0
Location Alias: 00/10-04-32-23 W4M
Location Alias 2: 00/10-04-032-23 W4/00
Country: Canada
Province: Alberta
Township: 032
Meridian: 4
Range: 23
Section: 04
County/Municipality: Kneehill County
Well Name: MARATHO ET AL TWIN 10-4-32-23
Operator Name: Canadian Natural Resources Limited
License Number: 0063430
License Date: 1977-04-11
License Status: Issued
Spud Date: 1977-04-29
Final Drill Date: 1977-05-06
Well Total Depth: 1627.60 m
Surface Hole Latitude: 51.715984
Surface Hole Longitude: -113.202452

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1977-04-11 Obtained License
1977-04-30 Lost Circulation Occurred
1977-05-06 Finished Drilling
1977-05-06 Well Mode changed to Drilled and Cased
1977-05-07 Drill Stem Test Performed
1977-05-08 Production Casing Operation Performed
1977-05-24 Perforation Treatment Performed - Jet Perforation
1977-05-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-05-27 Perforation Treatment Performed - Jet Perforation
1977-06-06 Perforation Treatment Performed - Jet Perforation
1978-10-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-10-26 Perforation Treatment Performed - Cement Squeeze
1978-12-01 Well Began Production
1978-12-01 Well Fluid changed to Gas
1978-12-01 Well Mode changed to Flowing
1979-01-21 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1977-05-24 Perforation 1595.30 1598.40 0
1977-05-24 Perforation 1600.20 1605.10 0
1977-05-25 Acid Treatment 1595.30 1605.10 0
1977-05-27 Perforation 1586.80 1588.60 13
1977-06-06 Perforation 1549.30 1550.80 7
1977-06-06 Perforation 1551.70 1553.30 7
1978-10-26 Acid Treatment 1549.60 1553.60 0
1978-10-26 Cement Squeeze 1549.60 1553.60 0
1979-01-21 Acid Treatment 1587.10 1605.10 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1978 314 0.0 0.0 0.0
1979 7593 0.0 0.0 0.0
1980 5216 0.0 0.0 0.0
1981 4695 0.0 0.0 0.0
1982 5905 0.0 0.0 0.0
1983 3587 0.0 0.0 0.0
1984 4920 0.0 0.0 0.0
1985 5431 0.0 0.0 0.0
1986 4977 0.0 0.0 0.0
1987 3618 0.0 0.0 0.0
1988 4111 0.0 0.0 0.0
1989 7237 0.0 0.0 0.0
1990 7564 0.0 0.0 0.0
1991 6952 0.0 0.0 0.0
1992 8755 0.0 0.0 0.0
1993 8422 0.0 0.0 0.0
1994 8476 0.0 0.0 0.0
1995 7459 0.0 0.0 0.0
1996 7220 0.0 0.0 0.0
1997 7036 0.0 0.0 0.0
1998 6897 0.0 0.0 0.0
1999 7477 0.0 0.0 0.0
2000 7208 0.0 0.0 0.0
2001 7844 0.0 0.0 0.0
2002 8487 0.0 0.0 0.0
2003 8759 0.0 0.0 0.0
2004 8728 0.0 0.0 0.0
2005 8723 0.0 0.0 0.0
2006 8760 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8712 0.0 0.0 0.0
2010 8575 0.0 0.0 0.0
2011 8181 0.0 0.0 0.0
2012 8647 0.0 0.0 0.0
2013 8643 0.0 0.0 0.0
2014 7209 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8755 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1977-04-30 Lost Circulation 90.50 190.20

For data sources see[6]

References