X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0324223314000

Well Details

Well ID: 0324223314000
Loading map...
Location: 00/14-33-032-22W4/0
Location Alias: 00/14-33-32-22 W4M
Location Alias 2: 00/14-33-032-22 W4/00
Country: Canada
Province: Alberta
Township: 032
Meridian: 4
Range: 22
Section: 33
County/Municipality: Kneehill County
Well Name: OUTLIER HZ GPINE 14-33-32-22
Operator Name: Outlier Resources Ltd.
License Number: 0486700
License Date: 2017-12-01
License Status: Issued
Spud Date: 2017-12-15
Final Drill Date: 2017-12-28
Well Total Depth: 3915.00 m
Surface Hole Latitude: 51.778240
Surface Hole Longitude: -113.051018

For data sources see[1][2]

Well History

Date Event
2017-12-01 Obtained License
2017-12-16 Surface Casing Operation Performed
2017-12-18 Direction Drilling Operation Performed - Deviate
2017-12-20 Direction Drilling Operation Performed - Horizontal
2017-12-20 Well Log Performed
2017-12-26 Well Log Performed
2017-12-27 Production Casing Operation Performed
2017-12-28 Finished Drilling
2017-12-28 Well Mode changed to Drilled and Cased
2017-12-29 Rig Released
2018-10-17 Perforation Treatment Performed - Multi-Stage Fracture
2018-10-18 Perforation Treatment Performed - Multi-Stage Fracture
2018-10-19 Perforation Treatment Performed - Multi-Stage Fracture
2018-10-20 Perforation Treatment Performed - Multi-Stage Fracture
2018-10-21 Perforation Treatment Performed - Multi-Stage Fracture
2018-10-22 Perforation Treatment Performed - Multi-Stage Fracture
2018-10-23 Perforation Treatment Performed - Multi-Stage Fracture
2018-10-24 Perforation Treatment Performed - Multi-Stage Fracture
2018-10-25 Perforation Treatment Performed - Multi-Stage Fracture
2018-10-26 Perforation Treatment Performed - Multi-Stage Fracture
2018-10-27 Perforation Treatment Performed - Multi-Stage Fracture
2019-04-01 Well Began Production
2019-04-01 Well Fluid changed to Crude Oil
2019-04-01 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2017-12-15 Horizon Drilling Inc. 39 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2017-12-18 1713.40 Deviate (5 - 79 degrees)
2017-12-20 2204.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-10-17 Multi-Stage Fracture 3879.20 3879.30 0
2018-10-19 Multi-Stage Fracture 3619.60 3619.70 0
2018-10-19 Multi-Stage Fracture 3590.00 3590.10 0
2018-10-19 Multi-Stage Fracture 3572.00 3572.10 0
2018-10-19 Multi-Stage Fracture 3535.00 3535.10 0
2018-10-20 Multi-Stage Fracture 3500.00 3500.10 0
2018-10-20 Multi-Stage Fracture 3470.00 3470.10 0
2018-10-20 Multi-Stage Fracture 3440.00 3440.10 0
2018-10-20 Multi-Stage Fracture 3421.00 3421.10 0
2018-10-20 Multi-Stage Fracture 3387.00 3387.10 0
2018-10-20 Multi-Stage Fracture 3351.00 3351.10 0
2018-10-17 Multi-Stage Fracture 3860.00 3860.10 0
2018-10-20 Multi-Stage Fracture 3320.00 3320.10 0
2018-10-21 Multi-Stage Fracture 3290.00 3290.10 0
2018-10-21 Multi-Stage Fracture 3280.00 3280.10 0
2018-10-21 Multi-Stage Fracture 3251.00 3251.10 0
2018-10-21 Multi-Stage Fracture 3227.00 3227.10 0
2018-10-21 Multi-Stage Fracture 3200.00 3200.10 0
2018-10-21 Multi-Stage Fracture 3187.00 3187.10 0
2018-10-22 Multi-Stage Fracture 3166.40 3166.50 0
2018-10-22 Multi-Stage Fracture 3140.00 3140.10 0
2018-10-22 Multi-Stage Fracture 3110.00 3110.10 0
2018-10-17 Multi-Stage Fracture 3830.00 3830.10 0
2018-10-22 Multi-Stage Fracture 3078.80 3078.90 0
2018-10-22 Multi-Stage Fracture 3050.00 3050.10 0
2018-10-22 Multi-Stage Fracture 3028.00 3028.10 0
2018-10-22 Multi-Stage Fracture 2990.00 2990.10 0
2018-10-23 Multi-Stage Fracture 2980.00 2980.10 0
2018-10-23 Multi-Stage Fracture 2955.20 2955.30 0
2018-10-23 Multi-Stage Fracture 2929.70 2929.80 0
2018-10-24 Multi-Stage Fracture 2900.00 2900.10 0
2018-10-24 Multi-Stage Fracture 2865.30 2865.40 0
2018-10-24 Multi-Stage Fracture 2836.00 2836.10 0
2018-10-18 Multi-Stage Fracture 3800.00 3800.10 0
2018-10-24 Multi-Stage Fracture 2800.00 2800.10 0
2018-10-25 Multi-Stage Fracture 2770.00 2770.10 0
2018-10-25 Multi-Stage Fracture 2735.00 2735.10 0
2018-10-25 Multi-Stage Fracture 2698.00 2698.10 0
2018-10-25 Multi-Stage Fracture 2670.00 2670.10 0
2018-10-25 Multi-Stage Fracture 2641.00 2641.10 0
2018-10-25 Multi-Stage Fracture 2609.00 2609.10 0
2018-10-25 Multi-Stage Fracture 2579.00 2579.10 0
2018-10-25 Multi-Stage Fracture 2544.00 2544.10 0
2018-10-26 Multi-Stage Fracture 2507.00 2507.10 0
2018-10-18 Multi-Stage Fracture 3770.00 3770.10 0
2018-10-26 Multi-Stage Fracture 2480.00 2480.10 0
2018-10-26 Multi-Stage Fracture 2450.00 2450.10 0
2018-10-27 Multi-Stage Fracture 2419.50 2419.60 0
2018-10-27 Multi-Stage Fracture 2390.00 2390.10 0
2018-10-27 Multi-Stage Fracture 2354.60 2354.70 0
2018-10-27 Multi-Stage Fracture 2328.40 2328.50 0
2018-10-27 Multi-Stage Fracture 2300.00 2300.10 0
2018-10-27 Multi-Stage Fracture 2265.20 2265.30 0
2018-10-19 Multi-Stage Fracture 3737.70 3737.80 0
2018-10-19 Multi-Stage Fracture 3710.00 3710.10 0
2018-10-19 Multi-Stage Fracture 3680.00 3680.10 0
2018-10-19 Multi-Stage Fracture 3650.00 3650.10 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-10-17 2018-10-27 2,081 18,532 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water 7732-18-5 100 90.1611 N/A
Frac Sand - Regular Iron Horse Energy Services Crystalline Silica 14808-60-7 100 3.9147 N/A
HCL 15% Fusion Technologies Inc. Acid Hydrogen Chloride 7647-01-0 100 2.2093 N/A
water Not Available 100 2.2093 N/A
Dazomet Long-Term Fusion Technologies Inc. Bactericide/Biocide Tetrakis(Hydroxymethyl) Phosphonium Sulfate 55566-30-8 100 0.0551 N/A
water 7732-18-5 100 0.0551 N/A
Tolcide PS75LT Fusion Technologies Inc. Bactericide/Biocide Tetrakis(Hydroxymethyl) Phosphonium Sulfate 55566-30-8 100 0.0624 N/A
water 7732-18-5 100 0.0624 N/A
IH-FRV-4A Fusion Technologies Inc. Friction Reducer Non-Whimis Regulated Not Available 100 0.1518 N/A
IH-FRV-8 Fusion Technologies Inc. Friction Reducer Non-Whimis Regulated Not Available 100 0.3414 N/A
IH-GA-1 Fusion Technologies Inc. Gelling Agent Low toxicity mineral oil 8042-47-5 100 0.0068 N/A
IH-SI-1 Fusion Technologies Inc. Scale Inhibitor Methanol 67-56-1 100 0.0739 N/A
Water 7732-18-5 100 0.0739 N/A
IH-NE-7 Fusion Technologies Inc. Surfactant Methanol 67-56-1 100 0.0698 N/A
Trimethylopropane ethoxylated 52624-57-4 100 0.0698 N/A
water 7732-18-5 100 0.0698 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2018-10-15 2018-10-17 Surface Water - Runoff 17199
2018-10-14 2018-10-15 Surface Water - Runoff 3143

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 4981 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-12-29 No Incident Encountered 0.00 0.00
2018-10-30 No Incident Encountered 0.00 0.00

For data sources see[10]

References