X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0324222816000

Well Details

Well ID: 0324222816000
Loading map...
Location: 00/16-28-032-22W4/0
Location Alias: 00/16-28-32-22 W4M
Location Alias 2: 00/16-28-032-22 W4/00
Country: Canada
Province: Alberta
Township: 032
Meridian: 4
Range: 22
Section: 28
County/Municipality: Kneehill County
Well Name: EMBER GPINE 16-28-32-22
Operator Name: Ember Resources Inc.
License Number: 0340212
License Date: 2005-10-17
License Status: Issued
Spud Date: 2005-10-27
Final Drill Date: 2005-11-01
Well Total Depth: 591.00 m
Surface Hole Latitude: 51.778060
Surface Hole Longitude: -113.055472

For data sources see[1][2]

Well History

Date Event
2005-10-17 Obtained License
2005-10-27 Surface Casing Operation Performed
2005-11-01 Finished Drilling
2005-11-01 Production Casing Operation Performed
2005-11-01 Rig Released
2005-11-01 Well Mode changed to Drilled and Cased
2005-11-09 Well Log Performed
2005-12-03 Perforation Treatment Performed - Jet Perforation
2005-12-14 Perforation Treatment Performed - Fractured
2006-12-13 Well Began Production
2006-12-13 Well Fluid changed to Coalbed Methane-Coals Only
2006-12-13 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-12-03 Perforation 506.90 507.90 13
2005-12-03 Perforation 392.10 393.10 13
2005-12-03 Perforation 388.60 389.60 13
2005-12-03 Perforation 376.90 377.90 13
2005-12-03 Perforation 362.60 363.60 13
2005-12-03 Perforation 357.30 358.30 13
2005-12-03 Perforation 349.10 350.10 13
2005-12-03 Perforation 345.00 346.00 13
2005-12-03 Perforation 341.90 342.90 13
2005-12-03 Perforation 339.90 340.90 13
2005-12-03 Perforation 293.30 294.30 13
2005-12-03 Perforation 503.30 504.30 13
2005-12-03 Perforation 290.20 291.20 13
2005-12-03 Perforation 279.90 280.90 13
2005-12-03 Perforation 262.50 263.50 13
2005-12-03 Perforation 258.20 259.20 13
2005-12-03 Perforation 242.60 243.60 13
2005-12-03 Perforation 218.70 219.70 13
2005-12-14 Fracture 218.70 507.90 0
2005-12-03 Perforation 501.70 502.70 13
2005-12-03 Perforation 469.80 470.80 13
2005-12-03 Perforation 464.20 465.20 13
2005-12-03 Perforation 454.60 455.60 13
2005-12-03 Perforation 447.80 448.80 13
2005-12-03 Perforation 432.20 433.20 13
2005-12-03 Perforation 401.80 404.80 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2006 431 0.0 0.0 0.0
2007 8659 0.0 0.0 0.0
2008 8579 0.0 0.0 0.0
2009 8581 0.0 0.0 0.0
2010 8526 0.0 0.0 0.0
2011 8628 0.0 0.0 0.0
2012 8731 0.0 0.0 0.0
2013 8714 0.0 0.0 0.0
2014 8705 0.0 0.0 0.0
2015 8546 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References