If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0324222016022 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.764492,"lon":-113.081564,"icon":""}]} |
Location: 02/16-20-032-22W4/2 | |
Location Alias: 02/16-20-32-22 W4M | |
Location Alias 2: 02/16-20-032-22 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 032 | |
Meridian: 4 | |
Range: 22 | |
Section: 20 | |
County/Municipality: Kneehill County | |
Well Name: EMBER 102 GPINE 16-20-32-22 | |
Operator Name: Ember Resources Inc. | |
License Number: 0361013 | |
License Date: 2006-07-31 | |
License Status: Issued | |
Spud Date: 2006-08-20 | |
Final Drill Date: 2006-08-22 | |
Well Total Depth: 795.00 m | |
Surface Hole Latitude: 51.764492 | |
Surface Hole Longitude: -113.081564 |
Date | Event |
---|---|
2006-07-31 | Obtained License |
2006-08-20 | Lost Circulation Occurred |
2006-08-21 | Lost Circulation Occurred |
2006-08-21 | Production Casing Operation Performed |
2006-08-21 | Surface Casing Operation Performed |
2006-08-22 | Finished Drilling |
2006-08-22 | Rig Released |
2006-08-22 | Well Mode changed to Drilled and Cased |
2006-09-05 | Well Log Performed |
2006-09-27 | Perforation Treatment Performed - Jet Perforation |
2006-10-10 | Perforation Treatment Performed - Jet Perforation |
2006-10-11 | Perforation Treatment Performed - Jet Perforation |
2006-11-04 | Perforation Treatment Performed - Fractured |
2008-02-20 | Well Began Production |
2008-02-20 | Well Fluid changed to Coalbed Methane-Coals and Other |
2008-02-20 | Well Mode changed to Flowing |
2008-04-11 | Well Structure changed to Commingled |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2006-09-27 | Perforation | 528.00 | 530.00 | 13 |
2006-10-10 | Perforation | 461.00 | 461.50 | 13 |
2006-10-10 | Perforation | 466.50 | 468.00 | 13 |
2006-10-10 | Perforation | 495.00 | 495.50 | 13 |
2006-10-11 | Perforation | 215.50 | 216.50 | 13 |
2006-10-11 | Perforation | 239.50 | 240.00 | 13 |
2006-10-11 | Perforation | 278.60 | 279.10 | 13 |
2006-10-11 | Perforation | 280.50 | 281.00 | 13 |
2006-10-11 | Perforation | 323.10 | 324.10 | 13 |
2006-10-11 | Perforation | 336.00 | 337.00 | 13 |
2006-10-11 | Perforation | 347.20 | 348.20 | 13 |
2006-09-27 | Perforation | 738.50 | 741.00 | 13 |
2006-10-11 | Perforation | 352.60 | 353.10 | 13 |
2006-10-11 | Perforation | 364.70 | 365.20 | 13 |
2006-11-04 | Fracture | 495.00 | 495.50 | 0 |
2006-11-04 | Fracture | 466.50 | 468.00 | 0 |
2006-11-04 | Fracture | 461.00 | 461.50 | 0 |
2006-11-04 | Fracture | 452.00 | 453.00 | 0 |
2006-11-04 | Fracture | 442.90 | 445.40 | 0 |
2006-11-04 | Fracture | 428.50 | 429.00 | 0 |
2006-11-04 | Fracture | 396.00 | 397.00 | 0 |
2006-11-04 | Fracture | 390.00 | 390.50 | 0 |
2006-10-10 | Perforation | 376.80 | 377.80 | 13 |
2006-11-04 | Fracture | 376.80 | 377.80 | 0 |
2006-11-04 | Fracture | 364.70 | 365.20 | 0 |
2006-11-04 | Fracture | 347.20 | 353.10 | 0 |
2006-11-04 | Fracture | 336.00 | 337.00 | 0 |
2006-11-04 | Fracture | 323.10 | 324.10 | 0 |
2006-11-04 | Fracture | 278.60 | 281.00 | 0 |
2006-11-04 | Fracture | 239.50 | 240.00 | 0 |
2006-11-04 | Fracture | 215.50 | 216.50 | 0 |
2006-10-10 | Perforation | 390.00 | 390.50 | 13 |
2006-10-10 | Perforation | 396.00 | 397.00 | 13 |
2006-10-10 | Perforation | 428.50 | 429.00 | 13 |
2006-10-10 | Perforation | 442.90 | 443.40 | 13 |
2006-10-10 | Perforation | 444.90 | 445.40 | 13 |
2006-10-10 | Perforation | 452.00 | 453.00 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2008 | 2159 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2006-08-20 | Lost Circulation | 15.00 | 19.00 |
2006-08-21 | Lost Circulation | 100.00 | 103.00 |
For data sources see[6]