X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0324221916000

Well Details

Well ID: 0324221916000
Loading map...
Location: 00/16-19-032-22W4/0
Location Alias: 00/16-19-32-22 W4M
Location Alias 2: 00/16-19-032-22 W4/00
Country: Canada
Province: Alberta
Township: 032
Meridian: 4
Range: 22
Section: 19
County/Municipality: Kneehill County
Well Name: EMBER GPINE 16-19-32-22
Operator Name: Ember Resources Inc.
License Number: 0130101
License Date: 1987-11-13
License Status: Suspension
Spud Date: 1987-12-06
Final Drill Date: 1987-12-12
Well Total Depth: 1530.00 m
Surface Hole Latitude: 51.762382
Surface Hole Longitude: -113.104281

For data sources see[1][2]

Well History

Date Event
1987-11-13 Obtained License
1987-12-07 Surface Casing Operation Performed
1987-12-12 Finished Drilling
1987-12-12 Well Log Performed
1987-12-12 Well Mode changed to Drilled and Cased
1987-12-13 Drill Stem Test Performed
1987-12-14 Production Casing Operation Performed
1987-12-14 Rig Released
1987-12-15 Well Log Performed
1987-12-20 Well Log Performed
1987-12-21 Perforation Treatment Performed - Jet Perforation
1988-01-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-09-12 Perforation Treatment Performed - Jet Perforation
1988-09-12 Well Log Performed
1988-09-13 Perforation Treatment Performed - Fractured
1989-09-01 Well Began Production
1989-09-01 Well Fluid changed to Gas
1989-09-01 Well Mode changed to Flowing
1992-11-01 Well Fluid changed to Gas
1992-11-01 Well Mode changed to Suspended
2000-11-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-11-21 Plug Back Performed
2000-11-21 Well Fluid changed to Gas
2000-11-21 Well Log Performed
2000-11-21 Well Mode changed to Abandoned Zone
2000-11-22 Perforation Treatment Performed - Jet Perforation
2000-11-22 Well Log Performed
2000-11-29 Well Log Performed
2000-12-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-12-01 Plug Back Performed
2000-12-02 Perforation Treatment Performed - Jet Perforation
2000-12-02 Well Log Performed
2000-12-17 Perforation Treatment Performed - Jet Perforation
2012-08-31 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1987-12-21 Perforation 1501.00 1503.00 9
1988-01-06 Acid Treatment 1501.00 1503.00 0
1988-09-12 Perforation 1481.00 1484.00 14
1988-09-13 Fracture 1481.00 1484.00 0
2000-11-21 Packing Device Capped w/Cement 1497.50 1500.50 0
2000-11-22 Perforation 1491.00 1495.00 17
2000-12-01 Packing Device Capped w/Cement 1469.50 1477.70 0
2000-12-02 Perforation 717.00 721.00 20
2000-12-17 Perforation 663.00 668.00 20

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1989 366 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-08-31 No Incident Encountered 0.00 0.00

For data sources see[6]

References