X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0324203008000

Well Details

Well ID: 0324203008000
Loading map...
Location: 00/08-30-032-20W4/0
Location Alias: 00/08-30-32-20 W4M
Location Alias 2: 00/08-30-032-20 W4/00
Country: Canada
Province: Alberta
Township: 032
Meridian: 4
Range: 20
Section: 30
County/Municipality: Starland County
Well Name: CLEARBROOK ROWLEY 8-30-32-20
Operator Name: Enhance Energy Inc.
License Number: 0144070
License Date: 1990-05-04
License Status: Abandoned
Spud Date: 1990-05-16
Final Drill Date: 1990-05-23
Well Total Depth: 1453.00 m
Surface Hole Latitude: 51.772166
Surface Hole Longitude: -112.815365

For data sources see[1][2]

Well History

Date Event
1990-05-04 Obtained License
1990-05-17 Surface Casing Operation Performed
1990-05-19 Direction Drilling Operation Performed - Deviate
1990-05-23 Finished Drilling
1990-05-23 Well Log Performed
1990-05-23 Well Mode changed to Drilled and Cased
1990-05-24 Well Log Performed
1990-05-25 Drill Stem Test Performed
1990-05-25 Production Casing Operation Performed
1990-05-25 Rig Released
1990-05-25 Well Log Performed
1990-06-01 Well Log Performed
1990-06-02 Perforation Treatment Performed - Jet Perforation
1990-06-02 Well Log Performed
1990-07-01 Well Began Production
1990-07-01 Well Fluid changed to Crude Oil
1990-07-01 Well Mode changed to Pumping
1995-03-11 Well Log Performed
1995-03-12 Perforation Treatment Performed - Jet Perforation
1995-03-12 Well Log Performed
2018-07-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-07-21 Plug Back Performed
2018-07-21 Well Fluid changed to Crude Oil
2018-07-21 Well Mode changed to Abandoned Zone
2018-07-25 Well Abandoned
2018-07-25 Well Fluid changed to Crude Oil
2018-07-25 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1990-05-19 796.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1990-06-02 Perforation 1385.00 1388.50 13
1995-03-12 Perforation 1379.00 1383.00 18
2018-07-21 Packing Device Capped w/Cement 1374.80 1375.20 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1990 2006 0.0 0.0 0.0
1991 8130 0.0 0.0 0.0
1992 8687 0.0 0.0 0.0
1993 8685 0.0 0.0 0.0
1994 8615 0.0 0.0 0.0
1995 7858 0.0 0.0 0.0
1996 7847 0.0 0.0 0.0
1997 8668 0.0 0.0 0.0
1998 8753 0.0 0.0 0.0
1999 8732 0.0 0.0 0.0
2000 8649 0.0 0.0 0.0
2001 8734 0.0 0.0 0.0
2002 7522 0.0 0.0 0.0
2003 8069 0.0 0.0 0.0
2004 8310 0.0 0.0 0.0
2005 7517 0.0 0.0 0.0
2006 8637 0.0 0.0 0.0
2007 7694 0.0 0.0 0.0
2008 6395 0.0 0.0 0.0
2009 8359 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8553 0.0 0.0 0.0
2012 7451 0.0 0.0 0.0
2013 8743 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 190 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-07-21 No Incident Encountered 0.00 0.00

For data sources see[7]

References