X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0324202602002

Well Details

Well ID: 0324202602002
Loading map...
Location: 00/02-26-032-20W4/2
Location Alias: 00/02-26-32-20 W4M
Location Alias 2: 00/02-26-032-20 W4/02
Country: Canada
Province: Alberta
Township: 032
Meridian: 4
Range: 20
Section: 26
County/Municipality: Starland County
Well Name: PINE CLIFF DELIA 2-26-32-20
Operator Name: Pine Cliff Energy Ltd.
License Number: 0091469
License Date: 1981-07-29
License Status: Suspension
Spud Date: 1981-08-03
Final Drill Date: 1981-08-09
Well Total Depth: 1405.00 m
Surface Hole Latitude: 51.768795
Surface Hole Longitude: -112.729407

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1981-07-29 Obtained License
1981-08-09 Finished Drilling
1981-08-10 Well Log Performed
1981-08-11 Drill Stem Test Performed
1981-08-12 Drill Stem Test Performed
1981-08-13 Production Casing Operation Performed
1982-01-14 Perforation Treatment Performed - Jet Perforation
1994-06-28 Well Log Performed
1994-06-30 Well Log Performed
1994-07-01 Perforation Treatment Performed - Jet Perforation
1994-07-01 Well Mode changed to Drilled and Cased
1994-09-29 Perforation Treatment Performed - Fractured
1994-11-11 Well Began Production
1994-11-11 Well Fluid changed to Gas
1994-11-11 Well Mode changed to Flowing
1998-05-29 Perforation Treatment Performed - Jet Perforation
1998-05-29 Perforation Treatment Performed - Remedial Casing
1998-05-29 Well Log Performed
2006-04-28 Perforation Treatment Performed - Jet Perforation
2006-04-28 Well Log Performed
2006-05-05 Perforation Treatment Performed - Fractured
2006-05-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-05-13 Plug Back Performed
2006-05-13 Well Fluid changed to Gas
2006-05-13 Well Mode changed to Abandoned Zone
2006-05-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-05-14 Plug Back Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1982-01-14 Perforation 1367.00 1369.00 13
1994-07-01 Perforation 1355.00 1357.00 20
1994-09-29 Fracture 1355.00 1357.00 0
1998-05-29 Perforation 290.50 291.00 20
1998-05-29 Remedial Casing Cementing 290.50 291.00 0
2006-04-28 Perforation 1265.00 1271.50 17
2006-05-05 Fracture 1265.00 1271.50 0
2006-05-13 Packing Device Capped w/Cement 1334.80 1343.00 0
2006-05-14 Packing Device Capped w/Cement 1248.90 1256.90 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1994 1464 0.0 0.0 0.0
1995 8731 0.0 0.0 0.0
1996 8742 0.0 0.0 0.0
1997 8620 0.0 0.0 0.0
1998 8378 0.0 0.0 0.0
1999 8678 0.0 0.0 0.0
2000 8556 0.0 0.0 0.0
2001 8269 0.0 0.0 0.0
2002 8063 0.0 0.0 0.0
2003 7340 0.0 0.0 0.0
2004 1247 0.0 0.0 0.0
2005 450 0.0 0.0 0.0

For data sources see[5]

References