X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0324201010000

Well Details

Well ID: 0324201010000
Loading map...
Location: 00/10-10-032-20W4/0
Location Alias: 00/10-10-32-20 W4M
Location Alias 2: 00/10-10-032-20 W4/00
Country: Canada
Province: Alberta
Township: 032
Meridian: 4
Range: 20
Section: 10
County/Municipality: Starland County
Well Name: TEAC ROWLEY 10-10-32-20
Operator Name: Trident Exploration (Alberta) Corp.
License Number: 0020516
License Date: 1961-03-06
License Status: Suspension
Spud Date: 1961-03-08
Final Drill Date: 1961-03-18
Well Total Depth: 1396.00 m
Surface Hole Latitude: 51.730375
Surface Hole Longitude: -112.754368

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1961-03-06 Obtained License
1961-03-18 Finished Drilling
1961-03-18 Well Mode changed to Drilled and Cased
1961-03-19 Drill Stem Test Performed
1961-03-20 Drill Stem Test Performed
1961-03-21 Production Casing Operation Performed
1961-03-22 Perforation Treatment Performed - Jet Perforation
1961-03-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-03-30 Well Began Production
1961-03-30 Well Fluid changed to Crude Oil
1961-03-30 Well Mode changed to Flowing
1961-05-16 Well Fluid changed to Crude Oil
1961-05-16 Well Mode changed to Pumping
1990-12-09 Perforation Treatment Performed - Jet Perforation
1990-12-10 Perforation Treatment Performed - Fractured
1999-01-20 Well Fluid changed to Crude Oil
1999-01-20 Well Mode changed to Suspended
1999-05-31 Well Fluid changed to Crude Oil
1999-05-31 Well Mode changed to Suspended
2003-12-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-12-11 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1961-03-22 Perforation 1360.60 1361.50 7
1961-03-22 Perforation 1364.00 1366.10 7
1961-03-23 Acid Treatment 1360.60 1366.10 0
1990-12-09 Perforation 1358.80 1364.30 13
1990-12-09 Perforation 1365.50 1370.10 13
1990-12-10 Fracture 1358.80 1370.10 0
2003-12-11 Packing Device Capped w/Cement 1348.00 1354.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 6693 0.0 0.0 0.0
1968 8752 0.0 0.0 0.0
1969 8327 0.0 0.0 0.0
1970 1848 0.0 0.0 0.0
1971 886 0.0 0.0 0.0
1972 6454 0.0 0.0 0.0
1973 7960 0.0 0.0 0.0
1974 7524 0.0 0.0 0.0
1975 5930 0.0 0.0 0.0
1976 8149 0.0 0.0 0.0
1977 6081 0.0 0.0 0.0
1978 4348 0.0 0.0 0.0
1979 4170 0.0 0.0 0.0
1980 4384 0.0 0.0 0.0
1981 5255 0.0 0.0 0.0
1982 5774 0.0 0.0 0.0
1983 6263 0.0 0.0 0.0
1984 5432 0.0 0.0 0.0
1985 8595 0.0 0.0 0.0
1986 8695 0.0 0.0 0.0
1987 8735 0.0 0.0 0.0
1988 7907 0.0 0.0 0.0
1989 8597 0.0 0.0 0.0
1990 6875 0.0 0.0 0.0
1991 8627 0.0 0.0 0.0
1992 7736 0.0 0.0 0.0
1993 8755 0.0 0.0 0.0
1994 8759 0.0 0.0 0.0
1995 8759 0.0 0.0 0.0
1996 8783 0.0 0.0 0.0
1997 8759 0.0 0.0 0.0
1998 7991 0.0 0.0 0.0

For data sources see[5]

References