X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0324200706002

Well Details

Well ID: 0324200706002
Loading map...
Location: 00/06-07-032-20W4/2
Location Alias: 00/06-07-32-20 W4M
Location Alias 2: 00/06-07-032-20 W4/02
Country: Canada
Province: Alberta
Township: 032
Meridian: 4
Range: 20
Section: 07
County/Municipality: Starland County
Well Name: TEAC ROWLEY 6-7-32-20
Operator Name: Trident Exploration (Alberta) Corp.
License Number: 0124517
License Date: 1986-11-24
License Status: Abandoned
Spud Date: 1986-11-27
Final Drill Date: 1986-12-06
Well Total Depth: 1563.00 m
Surface Hole Latitude: 51.725592
Surface Hole Longitude: -112.828650

For data sources see[1][2]

Well History

Date Event
1986-11-24 Obtained License
1986-11-28 Surface Casing Operation Performed
1986-12-06 Finished Drilling
1986-12-06 Well Log Performed
1986-12-06 Well Mode changed to Drilled and Cased
1986-12-08 Production Casing Operation Performed
1986-12-08 Rig Released
1986-12-12 Well Log Performed
1986-12-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-12-13 Perforation Treatment Performed - Jet Perforation
1986-12-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-12-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1986-12-15 Perforation Treatment Performed - Jet Perforation
1986-12-15 Plug Back Performed
1986-12-15 Well Log Performed
1986-12-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-12-16 Perforation Treatment Performed - Jet Perforation
1986-12-16 Well Log Performed
1986-12-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-12-18 Perforation Treatment Performed - Jet Perforation
1986-12-18 Well Log Performed
1986-12-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-01-06 Perforation Treatment Performed - Fractured
1991-07-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1991-07-03 Plug Back Performed
1991-07-04 Perforation Treatment Performed - Jet Perforation
1991-08-01 Well Began Production
1991-08-01 Well Fluid changed to Crude Oil
1991-08-01 Well Mode changed to Pumping
1994-09-15 Well Fluid changed to Crude Oil
1994-09-15 Well Mode changed to Suspended
2007-11-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-11-02 Plug Back Performed
2007-11-02 Well Fluid changed to Crude Oil
2007-11-02 Well Log Performed
2007-11-02 Well Mode changed to Abandoned Zone
2014-12-01 Well Log Performed
2015-12-01 Well Abandoned
2015-12-01 Well Fluid changed to Crude Oil
2015-12-01 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1986-12-13 Perforation 1434.00 1439.00 7
1986-12-19 Acid Treatment 1391.00 1412.00 0
1987-01-06 Fracture 1391.00 1412.00 0
1991-07-03 Packing Device Capped w/Cement 1372.00 1380.00 0
1991-07-04 Perforation 1204.00 1205.50 13
2007-11-02 Packing Device Capped w/Cement 1190.00 1198.00 0
1986-12-13 Acid Treatment 1434.00 1439.00 0
1986-12-15 Packing Device Capped w/Cement 1429.00 1432.00 0
1986-12-15 Perforation 1407.00 1412.00 7
1986-12-15 Acid Treatment 1407.00 1412.00 0
1986-12-16 Perforation 1398.00 1404.00 7
1986-12-16 Acid Treatment 1398.00 1404.00 0
1986-12-17 Acid Treatment 1398.00 1412.00 0
1986-12-18 Perforation 1391.00 1401.00 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1991 2232 0.0 0.0 0.0
1992 4354 0.0 0.0 0.0
1993 4700 0.0 0.0 0.0
1994 2447 0.0 0.0 0.0

For data sources see[5]

References