X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0324191201000

Well Details

Well ID: 0324191201000
Loading map...
Location: 00/01-12-032-19W4/0
Location Alias: 00/01-12-32-19 W4M
Location Alias 2: 00/01-12-032-19 W4/00
Country: Canada
Province: Alberta
Township: 032
Meridian: 4
Range: 19
Section: 12
County/Municipality: Starland County
Well Name: TEAC DELIA 1-12-32-19
Operator Name: Trident Exploration (Alberta) Corp.
License Number: 0383478
License Date: 2007-10-18
License Status: Suspension
Spud Date: 2007-12-11
Final Drill Date: 2007-12-12
Well Total Depth: 402.00 m
Surface Hole Latitude: 51.724906
Surface Hole Longitude: -112.561150

For data sources see[1][2]

Well History

Date Event
2007-10-18 Obtained License
2007-12-11 Surface Casing Operation Performed
2007-12-12 Finished Drilling
2007-12-12 Production Casing Operation Performed
2007-12-12 Rig Released
2007-12-12 Well Mode changed to Drilled and Cased
2008-01-06 Well Log Performed
2008-01-21 Perforation Treatment Performed - Jet Perforation
2008-01-26 Perforation Treatment Performed - Fractured
2009-04-16 Well Began Production
2009-04-16 Well Fluid changed to Coalbed Methane-Coals Only
2009-04-16 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2008-01-21 Perforation 352.90 353.40 20
2008-01-21 Perforation 208.10 210.70 20
2008-01-21 Perforation 206.10 207.30 20
2008-01-21 Perforation 199.80 200.90 20
2008-01-21 Perforation 184.30 185.40 20
2008-01-21 Perforation 182.40 183.50 20
2008-01-21 Perforation 174.90 176.20 20
2008-01-21 Perforation 169.70 170.60 20
2008-01-21 Perforation 159.70 160.50 20
2008-01-21 Perforation 157.40 158.10 20
2008-01-21 Perforation 152.40 153.20 20
2008-01-21 Perforation 351.60 352.00 20
2008-01-21 Perforation 116.20 116.90 20
2008-01-21 Perforation 115.50 115.80 20
2008-01-21 Perforation 109.20 110.20 20
2008-01-26 Fracture 352.90 353.40 0
2008-01-26 Fracture 351.60 352.00 0
2008-01-26 Fracture 350.20 350.80 0
2008-01-26 Fracture 320.20 321.00 0
2008-01-26 Fracture 303.20 303.90 0
2008-01-26 Fracture 295.30 296.10 0
2008-01-26 Fracture 285.10 285.50 0
2008-01-21 Perforation 350.20 350.80 20
2008-01-26 Fracture 251.90 252.80 0
2008-01-26 Fracture 233.30 233.80 0
2008-01-26 Fracture 208.10 210.70 0
2008-01-26 Fracture 206.10 207.30 0
2008-01-26 Fracture 199.80 200.90 0
2008-01-26 Fracture 184.30 185.40 0
2008-01-26 Fracture 182.40 183.50 0
2008-01-26 Fracture 174.90 176.20 0
2008-01-26 Fracture 169.70 170.60 0
2008-01-26 Fracture 159.70 160.50 0
2008-01-21 Perforation 320.20 321.00 20
2008-01-26 Fracture 157.40 158.10 0
2008-01-26 Fracture 152.40 153.20 0
2008-01-26 Fracture 116.20 116.90 0
2008-01-26 Fracture 115.50 115.80 0
2008-01-26 Fracture 109.20 110.20 0
2008-01-21 Perforation 303.20 303.90 20
2008-01-21 Perforation 295.30 296.10 20
2008-01-21 Perforation 285.10 285.50 20
2008-01-21 Perforation 251.90 252.80 20
2008-01-21 Perforation 233.30 233.80 20

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2009 871 0.0 0.0 0.0
2010 1322 0.0 0.0 0.0
2011 1823 0.0 0.0 0.0
2012 1864 0.0 0.0 0.0
2013 1075 0.0 0.0 0.0

For data sources see[5]

References