X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0324160206000

Well Details

Well ID: 0324160206000
Loading map...
Location: 00/06-02-032-16W4/0
Location Alias: 00/06-02-32-16 W4M
Location Alias 2: 00/06-02-032-16 W4/00
Country: Canada
Province: Alberta
Township: 032
Meridian: 4
Range: 16
Section: 02
County/Municipality: Starland County
Well Name: DEML WATTS 6-2-32-16
Operator Name: Prairie Provident Resources Canada Ltd.
License Number: 0121543
License Date: 1986-01-20
License Status: Issued
Spud Date: 1986-01-26
Final Drill Date: 1986-01-31
Well Total Depth: 1320.00 m
Surface Hole Latitude: 51.711229
Surface Hole Longitude: -112.172000

For data sources see[1][2]

Well History

Date Event
1986-01-20 Obtained License
1986-01-26 Lost Circulation Occurred
1986-01-27 Surface Casing Operation Performed
1986-01-31 Finished Drilling
1986-01-31 Well Log Performed
1986-01-31 Well Mode changed to Drilled and Cased
1986-02-02 Drill Stem Test Performed
1986-02-03 Production Casing Operation Performed
1986-02-04 Rig Released
1986-02-09 Well Log Performed
1986-02-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-02-11 Perforation Treatment Performed - Jet Perforation
1986-02-11 Well Log Performed
1986-02-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-02-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-02-13 Perforation Treatment Performed - Jet Perforation
1986-02-13 Well Log Performed
1986-02-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-02-22 Well Began Production
1986-02-22 Well Fluid changed to Crude Oil
1986-02-22 Well Mode changed to Pumping
2009-01-01 Well Fluid changed to Crude Oil
2009-01-01 Well Mode changed to Suspended
2010-06-23 Well Fluid changed to Crude Oil
2010-06-23 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1986-02-11 Perforation 1269.00 1271.00 13
1986-02-11 Acid Treatment 1269.00 1271.00 0
1986-02-12 Acid Treatment 1269.00 1271.00 0
1986-02-13 Perforation 1233.00 1235.00 13
1986-02-13 Perforation 1237.00 1239.00 13
1986-02-13 Perforation 1242.00 1244.00 13
1986-02-13 Acid Treatment 1233.00 1244.00 0
1986-02-15 Acid Treatment 1233.00 1244.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1986 7262 0.0 0.0 0.0
1987 8305 0.0 0.0 0.0
1988 8293 0.0 0.0 0.0
1989 8501 0.0 0.0 0.0
1990 8562 0.0 0.0 0.0
1991 8554 0.0 0.0 0.0
1992 8682 0.0 0.0 0.0
1993 8735 0.0 0.0 0.0
1994 8359 0.0 0.0 0.0
1995 8670 0.0 0.0 0.0
1996 8416 0.0 0.0 0.0
1997 8395 0.0 0.0 0.0
1998 8358 0.0 0.0 0.0
1999 7380 0.0 0.0 0.0
2000 8207 0.0 0.0 0.0
2001 816 0.0 0.0 0.0
2003 7033 0.0 0.0 0.0
2004 6708 0.0 0.0 0.0
2005 2606 0.0 0.0 0.0
2006 6345 0.0 0.0 0.0
2007 8084 0.0 0.0 0.0
2008 8519 0.0 0.0 0.0
2010 5012 0.0 0.0 0.0
2011 7324 0.0 0.0 0.0
2012 8778 0.0 0.0 0.0
2013 8549 0.0 0.0 0.0
2014 8746 0.0 0.0 0.0
2015 2878 0.0 0.0 0.0
2016 4344 0.0 0.0 0.0
2017 5352 0.0 0.0 0.0
2018 6288 0.0 0.0 0.0
2019 7059 0.0 0.0 0.0
2020 272 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1986-01-26 Lost Circulation 138.00 138.00

For data sources see[6]

References