X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0324042814002

Well Details

Well ID: 0324042814002
Loading map...
Location: 00/14-28-032-04W4/2
Location Alias: 00/14-28-32-04 W4M
Location Alias 2: 00/14-28-032-04 W4/02
Country: Canada
Province: Alberta
Township: 032
Meridian: 4
Range: 04
Section: 28
County/Municipality: Special Areas No. 4
Well Name: SPUR HZ SEDALIA 3-28-32-4
Operator Name: Tamarack Acquisition Corp.
License Number: 0434536
License Date: 2011-06-21
License Status: Amended
Spud Date: 2011-06-28
Final Drill Date: 2011-07-09
Well Total Depth: 2217.00 m
Surface Hole Latitude: 51.766173
Surface Hole Longitude: -110.516602

For data sources see[1][2]

Well History

Date Event
2011-06-21 Obtained License
2011-06-29 Surface Casing Operation Performed
2011-07-04 Direction Drilling Operation Performed - Horizontal
2011-07-06 Intermediate Casing Operation Performed
2011-07-09 Finished Drilling
2011-07-09 Well Log Performed
2011-07-09 Well Mode changed to Drilled and Cased
2011-07-10 Liner Casing Operation Performed
2011-07-10 Rig Released
2011-07-21 Well Log Performed
2011-07-26 Well Log Performed
2011-07-29 Perforation Treatment Performed - Abrasa-Jet Perforation
2011-07-29 Perforation Treatment Performed - Fractured
2011-07-29 Perforation Treatment Performed - Multi-Stage Fracture
2011-07-30 Perforation Treatment Performed - Multi-Stage Fracture
2011-07-30 Well Began Production
2011-07-30 Well Fluid changed to Gas
2011-07-30 Well Mode changed to Flowing
2012-09-01 Well Fluid changed to Crude Oil
2012-09-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-07-04 558.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-07-29 Hydra Jet Perforation 2195.00 2195.20 0
2011-07-30 Multi-Stage Fracture 1540.60 1540.80 0
2011-07-30 Multi-Stage Fracture 1438.90 1439.10 0
2011-07-30 Multi-Stage Fracture 1351.30 1351.50 0
2011-07-30 Multi-Stage Fracture 1276.70 1276.90 0
2011-07-30 Multi-Stage Fracture 1175.40 1175.60 0
2011-07-30 Multi-Stage Fracture 1100.90 1101.10 0
2011-07-30 Multi-Stage Fracture 999.10 999.30 0
2011-07-29 Fracture 2195.00 2195.20 0
2011-07-29 Multi-Stage Fracture 2116.90 2117.10 0
2011-07-29 Multi-Stage Fracture 2028.70 2028.90 0
2011-07-29 Multi-Stage Fracture 1926.90 1927.10 0
2011-07-29 Multi-Stage Fracture 1852.30 1852.50 0
2011-07-29 Multi-Stage Fracture 1777.80 1778.00 0
2011-07-30 Multi-Stage Fracture 1689.70 1689.90 0
2011-07-30 Multi-Stage Fracture 1601.50 1601.70 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 192 0.0 0.0 0.0
2012 2119 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8737 0.0 0.0 0.0
2015 8627 0.0 0.0 0.0
2016 8738 0.0 0.0 0.0
2017 8311 0.0 0.0 0.0
2018 8536 0.0 0.0 0.0
2019 8688 0.0 0.0 0.0
2020 1262 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2011-07-30 No Incident Encountered 0.00 0.00

For data sources see[7]

References