If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0324032604020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.780529,"lon":-110.332181,"icon":""}]} |
Location: 02/04-26-032-03W4/0 | |
Location Alias: 02/04-26-32-03 W4M | |
Location Alias 2: 02/04-26-032-03 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 032 | |
Meridian: 4 | |
Range: 03 | |
Section: 26 | |
County/Municipality: Special Areas No. 4 | |
Well Name: ANEGADA HZ 4A ESTHER 4-26-32-3 | |
Operator Name: Baytex Energy Ltd. | |
License Number: 0476015 | |
License Date: 2015-07-06 | |
License Status: Issued | |
Spud Date: 2015-09-18 | |
Final Drill Date: 2015-09-20 | |
Well Total Depth: 2180.00 m | |
Surface Hole Latitude: 51.780529 | |
Surface Hole Longitude: -110.332181 |
Date | Event |
---|---|
2015-07-06 | Obtained License |
2015-09-18 | Surface Casing Operation Performed |
2015-09-19 | Direction Drilling Operation Performed - Deviate |
2015-09-19 | Direction Drilling Operation Performed - Horizontal |
2015-09-20 | Finished Drilling |
2015-09-20 | Well Log Performed |
2015-09-20 | Well Mode changed to Drilled and Cased |
2015-09-21 | Production Casing Operation Performed |
2015-09-21 | Rig Released |
2015-09-22 | Well Log Performed |
2015-10-11 | Perforation Treatment Performed - Multi-Stage Fracture |
2015-10-12 | Perforation Treatment Performed - Multi-Stage Fracture |
2015-10-14 | Well Began Production |
2015-10-14 | Well Fluid changed to Crude Oil |
2015-10-14 | Well Mode changed to Flowing |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2015-09-18 | Precision Drilling Corporation | 145 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2015-09-19 | 451.00 | Deviate (5 - 79 degrees) |
2015-09-19 | 794.20 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2015-10-11 | Multi-Stage Fracture | 2160.00 | 2160.50 | 0 |
2015-10-11 | Multi-Stage Fracture | 1911.00 | 1911.50 | 0 |
2015-10-11 | Multi-Stage Fracture | 1884.00 | 1884.50 | 0 |
2015-10-11 | Multi-Stage Fracture | 1857.00 | 1857.50 | 0 |
2015-10-11 | Multi-Stage Fracture | 1821.00 | 1821.50 | 0 |
2015-10-11 | Multi-Stage Fracture | 1794.00 | 1794.50 | 0 |
2015-10-11 | Multi-Stage Fracture | 1767.00 | 1767.50 | 0 |
2015-10-11 | Multi-Stage Fracture | 1740.00 | 1740.50 | 0 |
2015-10-11 | Multi-Stage Fracture | 1712.00 | 1712.50 | 0 |
2015-10-11 | Multi-Stage Fracture | 1684.00 | 1684.50 | 0 |
2015-10-11 | Multi-Stage Fracture | 1656.00 | 1656.50 | 0 |
2015-10-11 | Multi-Stage Fracture | 2132.00 | 2132.50 | 0 |
2015-10-11 | Multi-Stage Fracture | 1628.00 | 1628.50 | 0 |
2015-10-11 | Multi-Stage Fracture | 1601.00 | 1601.50 | 0 |
2015-10-11 | Multi-Stage Fracture | 1574.00 | 1574.50 | 0 |
2015-10-11 | Multi-Stage Fracture | 1547.00 | 1547.50 | 0 |
2015-10-12 | Multi-Stage Fracture | 1520.00 | 1520.50 | 0 |
2015-10-12 | Multi-Stage Fracture | 1493.00 | 1493.50 | 0 |
2015-10-12 | Multi-Stage Fracture | 1463.00 | 1463.50 | 0 |
2015-10-12 | Multi-Stage Fracture | 1261.00 | 1261.50 | 0 |
2015-10-12 | Multi-Stage Fracture | 1234.00 | 1234.50 | 0 |
2015-10-12 | Multi-Stage Fracture | 1207.00 | 1207.50 | 0 |
2015-10-11 | Multi-Stage Fracture | 2104.00 | 2104.50 | 0 |
2015-10-12 | Multi-Stage Fracture | 1180.00 | 1180.50 | 0 |
2015-10-12 | Multi-Stage Fracture | 1153.00 | 1153.50 | 0 |
2015-10-12 | Multi-Stage Fracture | 1117.00 | 1117.50 | 0 |
2015-10-11 | Multi-Stage Fracture | 2076.00 | 2076.50 | 0 |
2015-10-11 | Multi-Stage Fracture | 2048.00 | 2048.50 | 0 |
2015-10-11 | Multi-Stage Fracture | 2020.00 | 2020.50 | 0 |
2015-10-11 | Multi-Stage Fracture | 1992.00 | 1992.50 | 0 |
2015-10-11 | Multi-Stage Fracture | 1965.00 | 1965.50 | 0 |
2015-10-11 | Multi-Stage Fracture | 1938.00 | 1938.50 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2015-10-11 | 2015-10-12 | 701 | 1,260 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | 7732-18-5 | 100 | 88.831 | N/A | |||
20/40 Mesh | Element | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 10.6695 | N/A | ||
ELECC-1 | Element | Clay Control | 2-Hydroxy-N.N.N-trimethylethanaminium chloride | 67-48-1 | 100 | 0.2477 | N/A | |
Water | 7732-18-5 | 100 | 0.2477 | N/A | ||||
ELEFR-2 | Element | Friction Reducer | Non-hazardous Ingredients | Not Available | 100 | 0.1512 | N/A | |
Polyethylene glycol nonylphenylether. liquids | 9016-45-9 | 100 | 0.1512 | N/A | ||||
ELEFE-1 | Element | Surfactant | Alcohols. C9-11. ethoxylated | 68439-46-3 | 100 | 0.1004 | N/A | |
Methanol | 67-56-1 | 100 | 0.1004 | N/A | ||||
Poly(oxy-1.2-ethanediyl). alpha-undecyl-omega-hydroxy- | 34398-01-1 | 100 | 0.1004 | N/A | ||||
Water | 7732-18-5 | 100 | 0.1004 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2015-10-11 | 2015-10-11 | Municipal Water | 1358 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2015 | 1820 | 0.0 | 0.0 | 0.0 |
2016 | 8080 | 0.0 | 0.0 | 0.0 |
2017 | 8635 | 0.0 | 0.0 | 0.0 |
2018 | 8420 | 0.0 | 0.0 | 0.0 |
2019 | 6842 | 0.0 | 0.0 | 0.0 |
2020 | 2160 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2015-09-21 | No Incident Encountered | 0.00 | 0.00 |
2015-10-14 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]