X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0324022802000

Well Details

Well ID: 0324022802000
Loading map...
Location: 00/02-28-032-02W4/0
Location Alias: 00/02-28-32-02 W4M
Location Alias 2: 00/02-28-032-02 W4/00
Country: Canada
Province: Alberta
Township: 032
Meridian: 4
Range: 02
Section: 28
County/Municipality: Special Areas No. 4
Well Name: ANEGADA HZ 2B ESTHER 2-28-32-2
Operator Name: Baytex Energy Ltd.
License Number: 0467709
License Date: 2014-07-02
License Status: Issued
Spud Date: 2014-10-12
Final Drill Date: 2014-10-14
Well Total Depth: 2276.00 m
Surface Hole Latitude: 51.781842
Surface Hole Longitude: -110.227826

For data sources see[1][2]

Well History

Date Event
2014-07-02 Obtained License
2014-10-12 Surface Casing Operation Performed
2014-10-13 Direction Drilling Operation Performed - Deviate
2014-10-13 Direction Drilling Operation Performed - Horizontal
2014-10-14 Finished Drilling
2014-10-14 Well Log Performed
2014-10-14 Well Mode changed to Drilled and Cased
2014-10-15 Production Casing Operation Performed
2014-10-15 Rig Released
2014-10-30 Well Log Performed
2014-11-20 Perforation Treatment Performed - Multi-Stage Fracture
2014-11-21 Perforation Treatment Performed - Multi-Stage Fracture
2014-11-23 Well Began Production
2014-11-23 Well Fluid changed to Crude Oil
2014-11-23 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2014-10-12 Precision Drilling Corporation 145 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2014-10-13 397.40 Deviate (5 - 79 degrees)
2014-10-13 815.50 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2014-11-20 Multi-Stage Fracture 2258.00 2258.50 0
2014-11-21 Multi-Stage Fracture 1945.00 1945.50 0
2014-11-21 Multi-Stage Fracture 1909.00 1909.50 0
2014-11-21 Multi-Stage Fracture 1875.50 1876.00 0
2014-11-21 Multi-Stage Fracture 1840.00 1840.50 0
2014-11-21 Multi-Stage Fracture 1807.00 1807.50 0
2014-11-21 Multi-Stage Fracture 1770.00 1770.50 0
2014-11-21 Multi-Stage Fracture 1735.00 1735.50 0
2014-11-21 Multi-Stage Fracture 1700.00 1700.50 0
2014-11-21 Multi-Stage Fracture 1665.00 1665.50 0
2014-11-21 Multi-Stage Fracture 1629.00 1629.50 0
2014-11-20 Multi-Stage Fracture 2225.00 2225.50 0
2014-11-21 Multi-Stage Fracture 1595.00 1595.50 0
2014-11-21 Multi-Stage Fracture 1559.00 1559.50 0
2014-11-21 Multi-Stage Fracture 1525.00 1525.50 0
2014-11-21 Multi-Stage Fracture 1373.00 1373.50 0
2014-11-21 Multi-Stage Fracture 1340.00 1340.50 0
2014-11-21 Multi-Stage Fracture 1305.00 1305.50 0
2014-11-21 Multi-Stage Fracture 1271.00 1271.50 0
2014-11-21 Multi-Stage Fracture 1235.00 1235.50 0
2014-11-21 Multi-Stage Fracture 1200.00 1200.50 0
2014-11-21 Multi-Stage Fracture 1100.00 1100.50 0
2014-11-20 Multi-Stage Fracture 2189.00 2189.50 0
2014-11-21 Multi-Stage Fracture 1065.00 1065.50 0
2014-11-21 Multi-Stage Fracture 1031.00 1031.50 0
2014-11-21 Multi-Stage Fracture 995.00 995.50 0
2014-11-21 Multi-Stage Fracture 960.00 960.50 0
2014-11-21 Multi-Stage Fracture 925.00 925.50 0
2014-11-21 Multi-Stage Fracture 890.00 890.50 0
2014-11-20 Multi-Stage Fracture 2155.00 2155.50 0
2014-11-20 Multi-Stage Fracture 2120.00 2120.50 0
2014-11-20 Multi-Stage Fracture 2087.00 2087.50 0
2014-11-20 Multi-Stage Fracture 2050.00 2050.50 0
2014-11-21 Multi-Stage Fracture 2015.00 2015.50 0
2014-11-21 Multi-Stage Fracture 1980.00 1980.50 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2014-11-20 2014-11-21 692 1,316 N/A
2 2014-11-21 2014-11-21 692 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water 7732-18-5 100 70.8902 N/A
Frac Sand - Regular Iron Horse Energy Services Crystalline Silica 14808-60-7 100 14.1599 N/A
IH-BEZ-4 Fusion Technologies Inc. Breaker Ethylene glycol 107-21-1 100 0.0314 N/A
IH-CS-1 Fusion Technologies Inc. Clay Control Non-Whimis Regulated 64-18-6 100 0.2575 N/A
IH-CBX-5 Fusion Technologies Inc. Crosslinker Boric Acid 10043-35-3 100 0.1458 N/A
Ethylene glycol 107-21-1 100 0.1458 N/A
Potassium Carbonate 584-08-7 100 0.1458 N/A
Potassium Hydroxide 1310-58-3 100 0.1458 N/A
IH-GA-1 Fusion Technologies Inc. Gelling Agent Low toxicity mineral oil 8042-47-5 100 0.2885 N/A
IH-NE-1 Fusion Technologies Inc. Surfactant 2-ethyhexanol 104-76-7 100 0.0666 N/A
EO-C7-9-iso. C8-rich alcohols 78330-19-5 100 0.0666 N/A
EO-C9-11-iso. C10-rich alcohols 78330-20-8 100 0.0666 N/A
Heavy aromatic naptha 64742-94-5 100 0.0666 N/A
Isopropanol 67-63-0 100 0.0666 N/A
Methanol 67-56-1 100 0.0666 N/A
Napthalene 91-20-3 100 0.0665 N/A
Polyethylene glycol 25322-68-3 100 0.0666 N/A
2 IH-NE-1 Fusion Technologies Inc. Surfactant 1.2.4-trimethylbenzene 95-63-6 100 0.0661 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2014-10-31 2014-11-23 Municipal Water 1324

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2014 920 0.0 0.0 0.0
2015 8595 0.0 0.0 0.0
2016 8391 0.0 0.0 0.0
2017 7985 0.0 0.0 0.0
2018 8337 0.0 0.0 0.0
2019 8724 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-10-15 No Incident Encountered 0.00 0.00
2014-11-23 No Incident Encountered 0.00 0.00

For data sources see[10]

References