X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0324022402000

Well Details

Well ID: 0324022402000
Loading map...
Location: 00/02-24-032-02W4/0
Location Alias: 00/02-24-32-02 W4M
Location Alias 2: 00/02-24-032-02 W4/00
Country: Canada
Province: Alberta
Township: 032
Meridian: 4
Range: 02
Section: 24
County/Municipality: Special Areas No. 4
Well Name: PENN WEST HZ ESTHER 2-24-32-2
Operator Name: Obsidian Energy Ltd.
License Number: 0478476
License Date: 2015-12-15
License Status: Amended
Spud Date: 2016-09-15
Final Drill Date: 2016-09-18
Well Total Depth: 2216.00 m
Surface Hole Latitude: 51.766266
Surface Hole Longitude: -110.154814

For data sources see[1][2]

Well History

Date Event
2015-12-15 Obtained License
2016-09-15 Surface Casing Operation Performed
2016-09-16 Direction Drilling Operation Performed - Deviate
2016-09-16 Direction Drilling Operation Performed - Horizontal
2016-09-17 Production Casing Operation Performed
2016-09-18 Finished Drilling
2016-09-18 Well Log Performed
2016-09-18 Well Mode changed to Drilled and Cased
2016-09-19 Rig Released
2016-11-18 Perforation Treatment Performed - Multi-Stage Fracture
2016-11-23 Perforation Treatment Performed - Multi-Stage Fracture
2016-11-24 Perforation Treatment Performed - Multi-Stage Fracture
2016-11-25 Well Began Production
2016-11-25 Well Fluid changed to Crude Oil
2016-11-25 Well Mode changed to Flowing
2016-11-30 Well Log Performed
2017-06-01 Well Fluid changed to Crude Oil
2017-06-01 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2016-09-15 Precision Drilling Corporation 152 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2016-09-16 444.50 Deviate (5 - 79 degrees)
2016-09-16 828.70 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2016-11-18 Multi-Stage Fracture 2166.90 2167.10 0
2016-11-24 Multi-Stage Fracture 1813.30 1813.50 0
2016-11-24 Multi-Stage Fracture 1774.30 1774.50 0
2016-11-24 Multi-Stage Fracture 1735.10 1735.30 0
2016-11-24 Multi-Stage Fracture 1696.30 1696.50 0
2016-11-24 Multi-Stage Fracture 1657.20 1657.40 0
2016-11-24 Multi-Stage Fracture 1618.20 1618.40 0
2016-11-24 Multi-Stage Fracture 1579.10 1579.30 0
2016-11-24 Multi-Stage Fracture 1539.90 1540.10 0
2016-11-24 Multi-Stage Fracture 1500.10 1501.10 0
2016-11-24 Multi-Stage Fracture 1461.90 1462.10 0
2016-11-23 Multi-Stage Fracture 2127.80 2128.00 0
2016-11-24 Multi-Stage Fracture 1422.90 1423.10 0
2016-11-24 Multi-Stage Fracture 1383.80 1384.00 0
2016-11-24 Multi-Stage Fracture 1344.80 1345.00 0
2016-11-24 Multi-Stage Fracture 1306.10 1306.30 0
2016-11-24 Multi-Stage Fracture 1266.70 1266.90 0
2016-11-24 Multi-Stage Fracture 1227.60 1227.80 0
2016-11-24 Multi-Stage Fracture 1188.70 1188.90 0
2016-11-24 Multi-Stage Fracture 1149.60 1149.80 0
2016-11-24 Multi-Stage Fracture 1110.60 1110.80 0
2016-11-24 Multi-Stage Fracture 1065.30 1065.50 0
2016-11-23 Multi-Stage Fracture 2088.40 2088.60 0
2016-11-24 Multi-Stage Fracture 1032.60 1032.80 0
2016-11-24 Multi-Stage Fracture 993.60 993.80 0
2016-11-24 Multi-Stage Fracture 953.90 954.10 0
2016-11-24 Multi-Stage Fracture 914.80 915.00 0
2016-11-24 Multi-Stage Fracture 875.70 875.90 0
2016-11-24 Multi-Stage Fracture 850.40 850.60 0
2016-11-23 Multi-Stage Fracture 2048.60 2048.80 0
2016-11-24 Multi-Stage Fracture 2009.10 2009.30 0
2016-11-24 Multi-Stage Fracture 1970.10 1970.20 0
2016-11-24 Multi-Stage Fracture 1930.90 1931.10 0
2016-11-24 Multi-Stage Fracture 1892.00 1892.20 0
2016-11-24 Multi-Stage Fracture 1852.80 1853.00 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2016-11-18 2016-11-24 733 968 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 N2 7727-37-9 100 10.9126 N/A
potassium chloride 7447-40-7 100 57.2209 N/A
water Not Available 100 57.2209 N/A
Sand 20/40 Trican silica crystalline 14808-60-7 100 31.585 N/A
GBE-1:5 Trican Breaker non-hazardous ingredients Not Available 100 0.0048 N/A
propylene glycol 57-55-6 100 0.0048 N/A
WF-2 Trican Foamer 2-butoxyethanol 111-76-2 100 0.1791 N/A
non-hazardous ingredients Not Available 100 0.1791 N/A
poly(oxy-1.2-ethanediyl). a-hexyl-w-hydroxy 31726-34-8 100 0.1791 N/A
polyethylene glycol hexyl ether sulfate. ammonium salt 63428-86-4 100 0.1791 N/A
sulfonate. alkyl (C14-16)olefin. sodium salt 68439-57-6 100 0.1791 N/A
WG-111d Trican Gelling Agent guar gum 9000-30-0 100 0.0805 N/A
S-17W Trican Surfactant ethylene/propylene oxide polymer Not Available 100 0.0168 N/A
methanol 67-56-1 100 0.0168 N/A
water Not Available 100 0.0168 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2016-11-01 2016-11-23 Surface Water - Runoff 932

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2016 528 0.0 0.0 0.0
2017 8209 0.0 0.0 0.0
2018 8668 0.0 0.0 0.0
2019 8724 0.0 0.0 0.0
2020 2169 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-09-19 No Incident Encountered 0.00 0.00
2016-11-27 No Incident Encountered 0.00 0.00

For data sources see[10]

References