X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0324012715002

Well Details

Well ID: 0324012715002
Loading map...
Location: 00/15-27-032-01W4/2
Location Alias: 00/15-27-32-01 W4M
Location Alias 2: 00/15-27-032-01 W4/02
Country: Canada
Province: Alberta
Township: 032
Meridian: 4
Range: 01
Section: 27
County/Municipality: Special Areas No. 4
Well Name: PENN WEST ESTHER 15-27-32-1
Operator Name: Obsidian Energy Ltd.
License Number: 0160894
License Date: 1993-09-10
License Status: Issued
Spud Date: 1993-09-11
Final Drill Date: 1993-09-15
Well Total Depth: 937.00 m
Surface Hole Latitude: 51.776465
Surface Hole Longitude: -110.061762

For data sources see[1][2]

Well History

Date Event
1993-09-10 Obtained License
1993-09-12 Surface Casing Operation Performed
1993-09-15 Drill Stem Test Performed
1993-09-15 Finished Drilling
1993-09-15 Well Log Performed
1993-09-15 Well Mode changed to Drilled and Cased
1993-09-17 Drill Stem Test Performed
1993-09-18 Production Casing Operation Performed
1993-09-18 Rig Released
1993-09-29 Well Log Performed
1993-10-02 Perforation Treatment Performed - Jet Perforation
1993-10-02 Perforation Treatment Performed - Remedial Casing
1993-10-04 Perforation Treatment Performed - Jet Perforation
1993-10-04 Well Log Performed
1993-10-06 Perforation Treatment Performed - Fractured
1993-11-01 Well Began Production
1993-11-01 Well Fluid changed to Gas
1993-11-01 Well Mode changed to Flowing
1993-11-15 Well Log Performed
1993-11-22 Perforation Treatment Performed - Jet Perforation
1993-11-22 Well Log Performed
1995-04-26 Perforation Treatment Performed - Cement Squeeze
1995-04-26 Plug Back Performed
1995-04-26 Well Fluid changed to Gas
1995-04-26 Well Mode changed to Abandoned Zone
1996-06-03 Perforation Treatment Performed - Jet Perforation
1996-06-03 Well Log Performed
1997-08-08 Well Log Performed
2008-11-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-11-14 Plug Back Performed
2008-11-14 Well Log Performed
2008-11-15 Perforation Treatment Performed - Jet Perforation
2008-11-15 Well Log Performed
2009-07-25 Well Fluid changed to Crude Oil
2009-07-25 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1993-10-02 Perforation 235.00 235.50 7
1993-10-02 Remedial Casing Cementing 235.00 235.50 0
1993-10-04 Perforation 804.00 806.00 13
1993-10-06 Fracture 804.00 806.00 0
1993-11-22 Perforation 748.30 749.50 13
1995-04-26 Cement Squeeze 748.30 749.50 0
1996-06-03 Perforation 804.00 806.00 14
2008-11-14 Packing Device Capped w/Cement 785.00 795.00 0
2008-11-15 Perforation 747.50 749.50 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1993 859 0.0 0.0 0.0
1994 8384 0.0 0.0 0.0
1995 2698 0.0 0.0 0.0
2009 3762 0.0 0.0 0.0
2010 8720 0.0 0.0 0.0
2011 7826 0.0 0.0 0.0
2012 8209 0.0 0.0 0.0
2013 8525 0.0 0.0 0.0
2014 7167 0.0 0.0 0.0
2015 8175 0.0 0.0 0.0
2016 5178 0.0 0.0 0.0
2017 7906 0.0 0.0 0.0
2018 7006 0.0 0.0 0.0
2019 8659 0.0 0.0 0.0
2020 1564 0.0 0.0 0.0

For data sources see[5]

References