X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0315043213000

Well Details

Well ID: 0315043213000
Loading map...
Location: 00/13-32-031-04W5/0
Location Alias: 00/13-32-31-04 W5M
Location Alias 2: 00/13-32-031-04 W5/00
Country: Canada
Province: Alberta
Township: 031
Meridian: 5
Range: 04
Section: 32
County/Municipality: Mountain View County
Well Name: MOBIL UNIT HARM 13-32-31-4
Operator Name: ExxonMobil Canada Ltd.
License Number: 0011850
License Date: 1956-07-16
License Status: Suspension
Spud Date: 1956-07-23
Final Drill Date: 1956-08-27
Well Total Depth: 2792.60 m
Surface Hole Latitude: 51.705686
Surface Hole Longitude: -114.541136

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1956-07-16 Obtained License
1956-08-27 Finished Drilling
1956-08-27 Production Casing Operation Performed
1956-08-27 Well Mode changed to Drilled and Cased
1956-08-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1956-08-30 Perforation Treatment Performed - Open-Hole Completion
1956-08-30 Well Began Production
1956-08-30 Well Fluid changed to Crude Oil
1956-08-30 Well Mode changed to Flowing
1957-05-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-02-14 Perforation Treatment Performed - Cement Squeeze
1979-02-15 Perforation Treatment Performed - Jet Perforation
1979-02-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-12-06 Well Fluid changed to Crude Oil
1979-12-06 Well Mode changed to Pumping
1983-02-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-03-01 Perforation Treatment Performed - Acid Wash - No Pressure
1999-04-01 Well Fluid changed to Crude Oil
1999-04-01 Well Mode changed to Suspended
2000-05-23 Well Fluid changed to Crude Oil
2000-05-23 Well Mode changed to Pumping
2013-05-01 Well Fluid changed to Crude Oil
2013-05-01 Well Mode changed to Suspended
2016-08-01 Well Fluid changed to Crude Oil
2016-08-01 Well Mode changed to Pumping
2018-05-01 Well Fluid changed to Crude Oil
2018-05-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1956-08-30 Open Hole/Barefoot Completion 2786.50 2792.60 0
1956-08-30 Acid Treatment 2786.50 2792.60 0
1957-05-17 Acid Treatment 2786.50 2792.60 0
1979-02-14 Cement Squeeze 2786.50 2792.60 0
1979-02-15 Perforation 2779.20 2781.60 7
1979-02-16 Acid Treatment 2779.20 2781.60 0
1983-02-15 Acid Treatment 2779.20 2781.60 0
1991-03-01 Acid Wash 2779.20 2781.60 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1968 781 0.0 0.0 0.0
1969 1214 0.0 0.0 0.0
1970 1521 0.0 0.0 0.0
1971 3920 0.0 0.0 0.0
1972 5557 0.0 0.0 0.0
1973 6954 0.0 0.0 0.0
1974 7840 0.0 0.0 0.0
1975 8463 0.0 0.0 0.0
1976 8511 0.0 0.0 0.0
1977 7550 0.0 0.0 0.0
1978 7432 0.0 0.0 0.0
1979 6503 0.0 0.0 0.0
1980 8355 0.0 0.0 0.0
1981 7989 0.0 0.0 0.0
1982 7323 0.0 0.0 0.0
1983 8116 0.0 0.0 0.0
1984 8116 0.0 0.0 0.0
1985 8160 0.0 0.0 0.0
1986 7654 0.0 0.0 0.0
1987 7336 0.0 0.0 0.0
1988 6950 0.0 0.0 0.0
1989 8045 0.0 0.0 0.0
1990 7971 0.0 0.0 0.0
1991 7868 0.0 0.0 0.0
1992 8256 0.0 0.0 0.0
1993 8671 0.0 0.0 0.0
1994 7954 0.0 0.0 0.0
1995 8747 0.0 0.0 0.0
1996 7842 0.0 0.0 0.0
1997 7385 0.0 0.0 0.0
1998 5734 0.0 0.0 0.0
2000 4628 0.0 0.0 0.0
2001 7655 0.0 0.0 0.0
2002 6163 0.0 0.0 0.0
2003 5628 0.0 0.0 0.0
2004 6286 0.0 0.0 0.0
2005 2472 0.0 0.0 0.0
2006 3597 0.0 0.0 0.0
2007 1096 0.0 0.0 0.0
2008 72 0.0 0.0 0.0
2009 776 0.0 0.0 0.0
2010 3174 0.0 0.0 0.0
2011 83 0.0 0.0 0.0
2012 24 0.0 0.0 0.0

For data sources see[5]

References