X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0315043205000

Well Details

Well ID: 0315043205000
Loading map...
Location: 00/05-32-031-04W5/0
Location Alias: 00/05-32-31-04 W5M
Location Alias 2: 00/05-32-031-04 W5/00
Country: Canada
Province: Alberta
Township: 031
Meridian: 5
Range: 04
Section: 32
County/Municipality: Mountain View County
Well Name: MOBIL UNIT HARM 5-32-31-4
Operator Name: ExxonMobil Canada Ltd.
License Number: 0012267
License Date: 1956-09-17
License Status: Suspension
Spud Date: 1956-10-07
Final Drill Date: 1956-11-08
Well Total Depth: 2792.60 m
Surface Hole Latitude: 51.698832
Surface Hole Longitude: -114.541839

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1956-09-17 Obtained License
1956-11-08 Finished Drilling
1956-11-08 Well Mode changed to Drilled and Cased
1956-11-10 Production Casing Operation Performed
1956-11-12 Perforation Treatment Performed - Open-Hole Completion
1956-11-14 Well Began Production
1956-11-14 Well Fluid changed to Crude Oil
1956-11-14 Well Mode changed to Flowing
1985-04-18 Well Fluid changed to Crude Oil
1985-04-18 Well Mode changed to Pumping
1990-06-03 Perforation Treatment Performed - Jet Perforation
1990-06-03 Well Log Performed
1990-06-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-10-20 Perforation Treatment Performed - Jet Perforation
1991-10-20 Well Log Performed
1991-10-23 Perforation Treatment Performed - Acid Squeeze - Press Used
2013-03-19 Well Log Performed
2016-08-01 Well Fluid changed to Crude Oil
2016-08-01 Well Mode changed to Suspended
2018-05-01 Well Fluid changed to Crude Oil
2018-05-01 Well Mode changed to Pumping
2018-06-01 Well Fluid changed to Crude Oil
2018-06-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1956-11-12 Open Hole/Barefoot Completion 2789.50 2792.60 0
1990-06-03 Perforation 2778.60 2780.10 13
1990-06-03 Perforation 2783.10 2785.90 13
1990-06-04 Acid Treatment 2778.60 2792.60 0
1991-10-20 Perforation 2770.80 2777.20 13
1991-10-20 Perforation 2780.10 2783.10 13
1991-10-20 Perforation 2785.90 2789.00 13
1991-10-23 Acid Treatment 2770.80 2792.60 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 1845 0.0 0.0 0.0
1968 1393 0.0 0.0 0.0
1969 781 0.0 0.0 0.0
1970 1974 0.0 0.0 0.0
1971 161 0.0 0.0 0.0
1972 3821 0.0 0.0 0.0
1973 6951 0.0 0.0 0.0
1974 7416 0.0 0.0 0.0
1975 8187 0.0 0.0 0.0
1976 7472 0.0 0.0 0.0
1977 8349 0.0 0.0 0.0
1978 8583 0.0 0.0 0.0
1979 8291 0.0 0.0 0.0
1980 8357 0.0 0.0 0.0
1981 8223 0.0 0.0 0.0
1982 8564 0.0 0.0 0.0
1983 8484 0.0 0.0 0.0
1984 8024 0.0 0.0 0.0
1985 7534 0.0 0.0 0.0
1986 8486 0.0 0.0 0.0
1987 7737 0.0 0.0 0.0
1988 7861 0.0 0.0 0.0
1989 7785 0.0 0.0 0.0
1990 7564 0.0 0.0 0.0
1991 8294 0.0 0.0 0.0
1992 7966 0.0 0.0 0.0
1993 8630 0.0 0.0 0.0
1994 8036 0.0 0.0 0.0
1995 8698 0.0 0.0 0.0
1996 8136 0.0 0.0 0.0
1997 7856 0.0 0.0 0.0
1998 7793 0.0 0.0 0.0
1999 6929 0.0 0.0 0.0
2000 8308 0.0 0.0 0.0
2001 6587 0.0 0.0 0.0
2002 7985 0.0 0.0 0.0
2003 8293 0.0 0.0 0.0
2004 7072 0.0 0.0 0.0
2005 6246 0.0 0.0 0.0
2006 6798 0.0 0.0 0.0
2007 1971 0.0 0.0 0.0
2008 242 0.0 0.0 0.0
2009 221 0.0 0.0 0.0
2010 7064 0.0 0.0 0.0
2011 7868 0.0 0.0 0.0
2012 3828 0.0 0.0 0.0
2013 73 0.0 0.0 0.0
2014 5930 0.0 0.0 0.0
2015 47 0.0 0.0 0.0

For data sources see[5]

References