X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0315033616000

Well Details

Well ID: 0315033616000
Loading map...
Location: 00/16-36-031-03W5/0
Location Alias: 00/16-36-31-03 W5M
Location Alias 2: 00/16-36-031-03 W5/00
Country: Canada
Province: Alberta
Township: 031
Meridian: 5
Range: 03
Section: 36
County/Municipality: Mountain View County
Well Name: TAC ET AL HZ HARME 16-36-31-3
Operator Name: Tamarack Acquisition Corp.
License Number: 0425650
License Date: 2010-11-09
License Status: Issued
Spud Date: 2010-11-29
Final Drill Date: 2010-12-13
Well Total Depth: 3563.00 m
Surface Hole Latitude: 51.692527
Surface Hole Longitude: -114.291766

For data sources see[1][2]

Well History

Date Event
2010-11-09 Obtained License
2010-11-29 Well Log Performed
2010-12-01 Surface Casing Operation Performed
2010-12-04 Direction Drilling Operation Performed - Horizontal
2010-12-08 Well Log Performed
2010-12-09 Intermediate Casing Operation Performed
2010-12-13 Finished Drilling
2010-12-13 Well Log Performed
2010-12-13 Well Mode changed to Drilled and Cased
2010-12-15 Well Log Performed
2010-12-16 Liner Casing Operation Performed
2010-12-18 Rig Released
2011-01-04 Perforation Treatment Performed - Multi-Stage Fracture
2011-01-05 Perforation Treatment Performed - Multi-Stage Fracture
2011-02-24 Well Began Production
2011-02-24 Well Fluid changed to Crude Oil
2011-02-24 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-12-04 1644.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-01-04 Multi-Stage Fracture 3525.60 3525.70 0
2011-01-05 Multi-Stage Fracture 2635.50 2635.60 0
2011-01-05 Multi-Stage Fracture 2536.60 2536.70 0
2011-01-05 Multi-Stage Fracture 2437.70 2437.80 0
2011-01-05 Multi-Stage Fracture 2338.80 2338.90 0
2011-01-05 Multi-Stage Fracture 2239.80 2239.90 0
2011-01-04 Multi-Stage Fracture 3426.80 3426.90 0
2011-01-04 Multi-Stage Fracture 3327.90 3328.00 0
2011-01-04 Multi-Stage Fracture 3229.00 3229.10 0
2011-01-04 Multi-Stage Fracture 3130.00 3130.10 0
2011-01-04 Multi-Stage Fracture 3031.10 3031.20 0
2011-01-04 Multi-Stage Fracture 2932.20 2932.30 0
2011-01-05 Multi-Stage Fracture 2833.20 2833.30 0
2011-01-05 Multi-Stage Fracture 2734.30 2734.40 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 6687 0.0 0.0 0.0
2012 7832 0.0 0.0 0.0
2013 7350 0.0 0.0 0.0
2014 6123 0.0 0.0 0.0
2015 7790 0.0 0.0 0.0
2016 8101 0.0 0.0 0.0
2017 7590 0.0 0.0 0.0
2018 6928 0.0 0.0 0.0
2019 2627 0.0 0.0 0.0
2020 492 0.0 0.0 0.0

For data sources see[6]

References