X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0315033315000

Well Details

Well ID: 0315033315000
Loading map...
Location: 00/15-33-031-03W5/0
Location Alias: 00/15-33-31-03 W5M
Location Alias 2: 00/15-33-031-03 W5/00
Country: Canada
Province: Alberta
Township: 031
Meridian: 5
Range: 03
Section: 33
County/Municipality: Mountain View County
Well Name: EMCL / EMCW HZ HARME 15-33-31-3
Operator Name: ExxonMobil Canada Ltd.
License Number: 0457668
License Date: 2013-06-20
License Status: Issued
Spud Date: 2013-09-14
Final Drill Date: 2013-09-28
Well Total Depth: 3696.00 m
Surface Hole Latitude: 51.692754
Surface Hole Longitude: -114.369249

For data sources see[1][2]

Well History

Date Event
2013-06-20 Obtained License
2013-09-15 Surface Casing Operation Performed
2013-09-21 Direction Drilling Operation Performed - Deviate
2013-09-23 Direction Drilling Operation Performed - Horizontal
2013-09-23 Well Log Performed
2013-09-28 Finished Drilling
2013-09-28 Production Casing Operation Performed
2013-09-28 Well Log Performed
2013-09-28 Well Mode changed to Drilled and Cased
2013-09-29 Perforation Treatment Performed - Open-Hole Completion
2013-09-29 Rig Released
2013-10-01 Well Began Production
2013-10-01 Well Fluid changed to Crude Oil
2013-10-01 Well Mode changed to Flowing
2013-10-26 Well Log Performed
2013-10-31 Perforation Treatment Performed - Multi-Stage Fracture
2013-12-26 Well Fluid changed to Crude Oil
2013-12-26 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2013-09-14 Nabors Drilling Limited 30 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2013-09-21 1346.00 Deviate (5 - 79 degrees)
2013-09-23 2284.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2013-09-29 Open Hole/Barefoot Completion 3692.00 3696.00 0
2013-10-31 Multi-Stage Fracture 2934.10 2934.20 0
2013-10-31 Multi-Stage Fracture 2844.50 2844.60 0
2013-10-31 Multi-Stage Fracture 2754.90 2755.00 0
2013-10-31 Multi-Stage Fracture 2665.60 2665.70 0
2013-10-31 Multi-Stage Fracture 2576.60 2576.70 0
2013-10-31 Multi-Stage Fracture 2487.20 2487.30 0
2013-10-31 Multi-Stage Fracture 2398.50 2398.60 0
2013-10-31 Multi-Stage Fracture 3655.90 3656.00 0
2013-10-31 Multi-Stage Fracture 3561.10 3561.20 0
2013-10-31 Multi-Stage Fracture 3471.30 3471.40 0
2013-10-31 Multi-Stage Fracture 3381.60 3381.70 0
2013-10-31 Multi-Stage Fracture 3292.40 3292.50 0
2013-10-31 Multi-Stage Fracture 3202.70 3202.80 0
2013-10-31 Multi-Stage Fracture 3112.70 3112.80 0
2013-10-31 Multi-Stage Fracture 3023.20 3023.30 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-10-31 2013-10-31 1,997 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Flowback Water Not Available 100 4.6914 N/A
Fresh water mix Not Available 100 80.5621 N/A
Slickwater; N002 Schlumberger Crystalline silica 14808-60-7 100 7.9296 N/A
Potash Fluid Experts Clay Control Potassium Chloride 7447-40-7 100 1.7386 N/A
Sodium Chloride 8028-77-1 100 0.0175 N/A
Slickwater; N002 Schlumberger Energizing Fluid 2-methyl-2h-isothiazol-3-one 2682-20-4 100 0 N/A
5-chloro-2-methyl-2h-isothiazolol-3-one 26172-55-4 100 0.0001 N/A
Acetic acid 64-19-7 100 0 N/A
Acetic acid; potassium salt 127-08-2 100 0 N/A
Acrylamide; 2-acrylamido-2-methylpropanesulfonic
acid; sodiu
38193-60-1 100 0.0083 N/A
Alcohol; C11-14; ethoxylated 78330-21-9 100 0.0007 N/A
Alcohols; C9-11-iso-; C10-rich 68526-85-2 100 0.0007 N/A
Cristobalite 14464-46-1 100 0 N/A
Diatomaceous earth; calcined 91053-39-3 100 0.0016 N/A
Dicoco dimethyl quaternary ammonium chloride 61789-77-3 100 0.0009 N/A
Distillates (petroleum); hydrotreated light 64742-47-8 100 0.0075 N/A
Magnesium chloride 7786-30-3 100 0.0001 N/A
Magnesium nitrate 10377-60-3 100 0.0003 N/A
Nitrogen; liquid form 7727-37-9 100 5.0141 N/A
Polyethylene glycol monohexyl ether 31726-34-8 100 0.0207 N/A
Potassium hydroxide 1310-58-3 100 0 N/A
Propan-2-ol 67-63-0 100 0.0001 N/A
Sodium chloride 7647-14-5 100 0.0036 N/A
Sorbitan monooleate; ethoxylated 9005-65-6 100 0.0003 N/A
Sorbitan; (Z)-9-octadecenoate (2:3) 8007-43-0 100 0.0005 N/A
Tetrasodium ethylenediaminetetraacetate 64-02-8 100 0 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2013-10-30 2013-10-30 Recycled Fracturing Water (treated at well site) 160
2013-10-25 2013-11-02 Central Water Distribution Facility 2612

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2013 102 0.0 0.0 0.0
2014 8130 0.0 0.0 0.0
2015 5989 0.0 0.0 0.0
2016 7125 0.0 0.0 0.0
2017 8495 0.0 0.0 0.0
2018 8042 0.0 0.0 0.0
2019 8467 0.0 0.0 0.0
2020 2164 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-09-29 No Incident Encountered 0.00 0.00
2013-12-17 No Incident Encountered 0.00 0.00

For data sources see[10]

References