If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0315033207000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.698708,"lon":-114.388556,"icon":""}]} |
Location: 00/07-32-031-03W5/0 | |
Location Alias: 00/07-32-31-03 W5M | |
Location Alias 2: 00/07-32-031-03 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 031 | |
Meridian: 5 | |
Range: 03 | |
Section: 32 | |
County/Municipality: Mountain View County | |
Well Name: MOBIL UNIT HARME 7-32-31-3 | |
Operator Name: ExxonMobil Canada Energy | |
License Number: 0020549 | |
License Date: 1961-03-10 | |
License Status: RecCertified | |
Spud Date: 1961-03-18 | |
Final Drill Date: 1961-04-25 | |
Well Total Depth: 2622.20 m | |
Surface Hole Latitude: 51.698708 | |
Surface Hole Longitude: -114.388556 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1961-03-10 | Obtained License |
1961-04-17 | Drill Stem Test Performed |
1961-04-21 | Drill Stem Test Performed |
1961-04-22 | Drill Stem Test Performed |
1961-04-23 | Drill Stem Test Performed |
1961-04-24 | Drill Stem Test Performed |
1961-04-25 | Drill Stem Test Performed |
1961-04-25 | Finished Drilling |
1961-04-25 | Well Mode changed to Drilled and Cased |
1961-04-26 | Perforation Treatment Performed - Jet Perforation |
1961-04-26 | Production Casing Operation Performed |
1961-05-06 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1961-05-20 | Well Began Production |
1961-05-20 | Well Fluid changed to Crude Oil |
1961-05-20 | Well Mode changed to Flowing |
1961-09-20 | Perforation Treatment Performed - Cement Squeeze |
1961-09-20 | Perforation Treatment Performed - Jet Perforation |
1961-09-28 | Perforation Treatment Performed - Jet Perforation |
1961-10-01 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1961-10-07 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1963-06-05 | Well Fluid changed to Crude Oil |
1963-06-05 | Well Mode changed to Suspended |
1964-07-04 | Perforation Treatment Performed - Jet Perforation |
1964-07-07 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1999-10-17 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1999-10-17 | Perforation Treatment Performed - Jet Perforation |
1999-10-17 | Plug Back Performed |
1999-10-17 | Well Fluid changed to Crude Oil |
1999-10-17 | Well Mode changed to Abandoned Zone |
1999-10-18 | Perforation Treatment Performed - Remedial Casing |
1999-11-02 | Well Abandoned |
1999-11-02 | Well Fluid changed to Crude Oil |
1999-11-02 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1961-04-26 | Perforation | 2596.90 | 2604.50 | 7 |
1964-07-04 | Perforation | 2585.90 | 2587.80 | 7 |
1964-07-04 | Perforation | 2589.00 | 2590.80 | 7 |
1964-07-07 | Acid Treatment | 2577.40 | 2604.50 | 0 |
1999-10-17 | Packing Device Capped w/Cement | 2558.30 | 2566.30 | 0 |
1999-10-17 | Perforation | 443.30 | 443.60 | 7 |
1999-10-18 | Remedial Casing Cementing | 443.30 | 443.60 | 0 |
1961-05-06 | Acid Treatment | 2596.90 | 2604.50 | 0 |
1961-09-20 | Perforation | 2593.20 | 2593.80 | 13 |
1961-09-20 | Cement Squeeze | 2593.20 | 2593.80 | 0 |
1961-09-28 | Perforation | 2598.10 | 2600.60 | 7 |
1961-10-01 | Acid Treatment | 2598.10 | 2600.60 | 0 |
1961-10-07 | Acid Treatment | 2598.10 | 2600.60 | 0 |
1964-07-04 | Perforation | 2577.40 | 2580.40 | 7 |
1964-07-04 | Perforation | 2583.20 | 2584.40 | 7 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
1962 | 0 | 0.0 | 0.0 | 0.0 |
1964 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]