X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0315033002004

Well Details

Well ID: 0315033002004
Loading map...
Location: 00/02-30-031-03W5/4
Location Alias: 00/02-30-31-03 W5M
Location Alias 2: 00/02-30-031-03 W5/04
Country: Canada
Province: Alberta
Township: 031
Meridian: 5
Range: 03
Section: 30
County/Municipality: Mountain View County
Well Name: BACCALIEU HARME 2-30-31-3
Operator Name: Baccalieu Energy Inc.
License Number: 0353739
License Date: 2006-03-09
License Status: Issued
Spud Date: 2006-06-30
Final Drill Date: 2006-08-06
Well Total Depth: 2693.00 m
Surface Hole Latitude: 51.682568
Surface Hole Longitude: -114.409806

For data sources see[1][2]

Well History

Date Event
2006-03-09 Obtained License
2006-07-03 Surface Casing Operation Performed
2006-07-06 Direction Drilling Operation Performed - Deviate
2006-07-09 Drill Stem Test Performed
2006-07-16 Well Log Performed
2006-07-17 Production Casing Operation Performed
2006-08-06 Finished Drilling
2006-08-06 Rig Released
2006-08-06 Well Mode changed to Drilled and Cased
2006-08-07 Perforation Treatment Performed - Open-Hole Completion
2006-08-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-08-09 Plug Back Performed
2006-08-10 Perforation Treatment Performed - Jet Perforation
2006-08-16 Perforation Treatment Performed - Fractured
2006-08-28 Perforation Treatment Performed - Jet Perforation
2006-09-02 Perforation Treatment Performed - Fractured
2010-02-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-02-24 Perforation Treatment Performed - Jet Perforation
2010-03-04 Perforation Treatment Performed - Fractured
2010-05-22 Well Began Production
2010-05-22 Well Fluid changed to Crude Oil
2010-05-22 Well Mode changed to Pumping
2011-09-25 Well Fluid changed to Crude Oil
2011-09-25 Well Mode changed to Suspended
2011-10-11 Well Fluid changed to Crude Oil
2011-10-11 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2006-07-06 2124.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2006-08-07 Open Hole/Barefoot Completion 2661.00 2691.00 0
2006-08-09 Packing Device Capped w/Cement 2650.00 2655.00 0
2006-08-10 Perforation 2630.00 2631.00 17
2006-08-16 Fracture 2630.00 2631.00 0
2006-08-28 Perforation 2613.00 2616.00 17
2006-09-02 Fracture 2613.00 2616.00 0
2010-02-24 Packing Device Capped w/Cement 2595.00 2603.00 0
2010-02-24 Perforation 2356.00 2361.00 17
2010-03-04 Fracture 2356.00 2361.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 5203 0.0 0.0 0.0
2011 8231 0.0 0.0 0.0
2012 7607 0.0 0.0 0.0
2013 8544 0.0 0.0 0.0
2014 8604 0.0 0.0 0.0
2015 8352 0.0 0.0 0.0
2016 8759 0.0 0.0 0.0
2017 7845 0.0 0.0 0.0
2018 6646 0.0 0.0 0.0
2019 8351 0.0 0.0 0.0
2020 2088 0.0 0.0 0.0

For data sources see[6]

References