X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0315031315000

Well Details

Well ID: 0315031315000
Loading map...
Location: 00/15-13-031-03W5/0
Location Alias: 00/15-13-31-03 W5M
Location Alias 2: 00/15-13-031-03 W5/00
Country: Canada
Province: Alberta
Township: 031
Meridian: 5
Range: 03
Section: 13
County/Municipality: Mountain View County
Well Name: TRANSGLOBE HARME 15-13-31-3
Operator Name: TransGlobe Energy Corporation
License Number: 0442172
License Date: 2012-01-03
License Status: Issued
Spud Date: 2012-01-19
Final Drill Date: 2012-02-11
Well Total Depth: 3749.00 m
Surface Hole Latitude: 51.650366
Surface Hole Longitude: -114.289566

For data sources see[1][2]

Well History

Date Event
2012-01-03 Obtained License
2012-01-22 Surface Casing Operation Performed
2012-01-26 Direction Drilling Operation Performed - Horizontal
2012-01-27 Well Log Performed
2012-02-01 Intermediate Casing Operation Performed
2012-02-02 Well Log Performed
2012-02-11 Finished Drilling
2012-02-11 Well Log Performed
2012-02-11 Well Mode changed to Drilled and Cased
2012-02-13 Liner Casing Operation Performed
2012-02-13 Perforation Treatment Performed - Open-Hole Completion
2012-02-15 Rig Released
2012-02-18 Well Log Performed
2012-02-24 Perforation Treatment Performed - Multi-Stage Fracture
2012-02-26 Well Began Production
2012-02-26 Well Fluid changed to Gas
2012-02-26 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-01-19 Precision Drilling Corporation 234 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-01-26 2165.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-02-13 Open Hole/Barefoot Completion 3731.50 3749.00 0
2012-02-24 Multi-Stage Fracture 2800.80 2800.90 0
2012-02-24 Multi-Stage Fracture 2683.40 2683.50 0
2012-02-24 Multi-Stage Fracture 3726.80 3726.90 0
2012-02-24 Multi-Stage Fracture 3654.00 3654.10 0
2012-02-24 Multi-Stage Fracture 3527.90 3528.00 0
2012-02-24 Multi-Stage Fracture 3401.80 3401.90 0
2012-02-24 Multi-Stage Fracture 3275.70 3275.80 0
2012-02-24 Multi-Stage Fracture 3149.80 3149.90 0
2012-02-24 Multi-Stage Fracture 3035.40 3035.50 0
2012-02-24 Multi-Stage Fracture 2917.90 2918.00 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 7271 0.0 0.0 0.0
2013 8325 0.0 0.0 0.0
2014 8358 0.0 0.0 0.0
2015 8144 0.0 0.0 0.0
2016 8750 0.0 0.0 0.0
2017 8735 0.0 0.0 0.0
2018 6480 0.0 0.0 0.0
2019 8495 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[7]

References