If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0315030408000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.635952,"lon":-114.362615,"icon":""}]} |
| Location: 00/08-04-031-03W5/0 | |
| Location Alias: 00/08-04-31-03 W5M | |
| Location Alias 2: 00/08-04-031-03 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 031 | |
| Meridian: 5 | |
| Range: 03 | |
| Section: 04 | |
| County/Municipality: Mountain View County | |
| Well Name: TRANSGLOBE HARME 8-4-31-3 | |
| Operator Name: TransGlobe Energy Corporation | |
| License Number: 0431033 | |
| License Date: 2011-02-01 | |
| License Status: Issued | |
| Spud Date: 2011-02-13 | |
| Final Drill Date: 2011-03-10 | |
| Well Total Depth: 3630.00 m | |
| Surface Hole Latitude: 51.635952 | |
| Surface Hole Longitude: -114.362615 |
| Date | Event |
|---|---|
| 2011-01-24 | Well Log Performed |
| 2011-02-01 | Obtained License |
| 2011-02-15 | Surface Casing Operation Performed |
| 2011-02-19 | Well Log Performed |
| 2011-02-20 | Direction Drilling Operation Performed - Horizontal |
| 2011-02-21 | Well Log Performed |
| 2011-02-25 | Intermediate Casing Operation Performed |
| 2011-03-10 | Finished Drilling |
| 2011-03-10 | Well Log Performed |
| 2011-03-10 | Well Mode changed to Drilled and Cased |
| 2011-03-13 | Liner Casing Operation Performed |
| 2011-03-13 | Perforation Treatment Performed - Open-Hole Completion |
| 2011-03-15 | Rig Released |
| 2011-03-18 | Well Log Performed |
| 2011-03-23 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2011-03-24 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2011-03-25 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2011-03-28 | Well Log Performed |
| 2011-04-10 | Well Began Production |
| 2011-04-10 | Well Fluid changed to Gas |
| 2011-04-10 | Well Mode changed to Pumping |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2011-02-20 | 2056.00 | Horizontal |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2011-03-13 | Open Hole/Barefoot Completion | 3600.00 | 3630.00 | 0 |
| 2011-03-23 | Multi-Stage Fracture | 3097.90 | 3098.00 | 0 |
| 2011-03-24 | Multi-Stage Fracture | 3043.90 | 3044.00 | 0 |
| 2011-03-24 | Multi-Stage Fracture | 2976.20 | 2976.30 | 0 |
| 2011-03-24 | Multi-Stage Fracture | 2921.20 | 2921.30 | 0 |
| 2011-03-24 | Multi-Stage Fracture | 2854.20 | 2854.30 | 0 |
| 2011-03-25 | Multi-Stage Fracture | 2799.20 | 2799.30 | 0 |
| 2011-03-25 | Multi-Stage Fracture | 2730.70 | 2730.80 | 0 |
| 2011-03-25 | Multi-Stage Fracture | 2608.60 | 2608.70 | 0 |
| 2011-03-25 | Multi-Stage Fracture | 2553.70 | 2553.80 | 0 |
| 2011-03-25 | Multi-Stage Fracture | 2485.10 | 2485.20 | 0 |
| 2011-03-23 | Multi-Stage Fracture | 3599.80 | 3599.90 | 0 |
| 2011-03-25 | Multi-Stage Fracture | 2430.10 | 2430.20 | 0 |
| 2011-03-23 | Multi-Stage Fracture | 3531.60 | 3531.70 | 0 |
| 2011-03-23 | Multi-Stage Fracture | 3477.90 | 3478.00 | 0 |
| 2011-03-23 | Multi-Stage Fracture | 3410.30 | 3410.40 | 0 |
| 2011-03-23 | Multi-Stage Fracture | 3356.80 | 3356.90 | 0 |
| 2011-03-23 | Multi-Stage Fracture | 3289.00 | 3289.10 | 0 |
| 2011-03-23 | Multi-Stage Fracture | 3221.00 | 3221.10 | 0 |
| 2011-03-23 | Multi-Stage Fracture | 3166.40 | 3166.50 | 0 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2011 | 5856 | 0.0 | 0.0 | 0.0 |
| 2012 | 8230 | 0.0 | 0.0 | 0.0 |
| 2013 | 8293 | 0.0 | 0.0 | 0.0 |
| 2014 | 8399 | 0.0 | 0.0 | 0.0 |
| 2015 | 8171 | 0.0 | 0.0 | 0.0 |
| 2016 | 8783 | 0.0 | 0.0 | 0.0 |
| 2017 | 8663 | 0.0 | 0.0 | 0.0 |
| 2018 | 7991 | 0.0 | 0.0 | 0.0 |
| 2019 | 8759 | 0.0 | 0.0 | 0.0 |
| 2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[6]