X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0315021708000

Well Details

Well ID: 0315021708000
Loading map...
Location: 00/08-17-031-02W5/0
Location Alias: 00/08-17-31-02 W5M
Location Alias 2: 00/08-17-031-02 W5/00
Country: Canada
Province: Alberta
Township: 031
Meridian: 5
Range: 02
Section: 17
County/Municipality: Mountain View County
Well Name: TRANSGLOBE GARR 8-17-31-2
Operator Name: TransGlobe Energy Corporation
License Number: 0422008
License Date: 2010-07-21
License Status: Amended
Spud Date: 2010-07-31
Final Drill Date: 2010-08-21
Well Total Depth: 3465.00 m
Surface Hole Latitude: 51.665945
Surface Hole Longitude: -114.240134

For data sources see[1][2]

Well History

Date Event
2010-07-21 Obtained License
2010-08-01 Surface Casing Operation Performed
2010-08-02 Well Log Performed
2010-08-05 Direction Drilling Operation Performed - Horizontal
2010-08-08 Well Log Performed
2010-08-14 Intermediate Casing Operation Performed
2010-08-14 Well Log Performed
2010-08-21 Finished Drilling
2010-08-21 Well Log Performed
2010-08-21 Well Mode changed to Drilled and Cased
2010-08-24 Liner Casing Operation Performed
2010-08-25 Rig Released
2010-08-30 Well Log Performed
2010-09-01 Perforation Treatment Performed - Open-Hole Completion
2010-09-07 Perforation Treatment Performed - Multi-Stage Fracture
2010-09-08 Perforation Treatment Performed - Multi-Stage Fracture
2010-09-09 Perforation Treatment Performed - Multi-Stage Fracture
2010-09-10 Perforation Treatment Performed - Multi-Stage Fracture
2010-09-22 Well Began Production
2010-09-22 Well Fluid changed to Crude Oil
2010-09-22 Well Mode changed to Flowing
2012-01-01 Well Fluid changed to Crude Oil
2012-01-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-08-05 1844.50 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-09-01 Open Hole/Barefoot Completion 3461.30 3465.00 0
2010-09-10 Multi-Stage Fracture 2531.10 2531.20 0
2010-09-10 Multi-Stage Fracture 2417.50 2417.60 0
2010-09-07 Multi-Stage Fracture 3460.60 3460.70 0
2010-09-07 Multi-Stage Fracture 3347.10 3347.20 0
2010-09-07 Multi-Stage Fracture 3224.40 3224.50 0
2010-09-08 Multi-Stage Fracture 3098.20 3098.30 0
2010-09-08 Multi-Stage Fracture 2993.90 2994.00 0
2010-09-09 Multi-Stage Fracture 2876.60 2876.70 0
2010-09-09 Multi-Stage Fracture 2759.50 2759.60 0
2010-09-10 Multi-Stage Fracture 2644.40 2644.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 2383 0.0 0.0 0.0
2011 6857 0.0 0.0 0.0
2012 7644 0.0 0.0 0.0
2013 8235 0.0 0.0 0.0
2014 8430 0.0 0.0 0.0
2015 7600 0.0 0.0 0.0
2016 3191 0.0 0.0 0.0
2017 4416 0.0 0.0 0.0
2018 6912 0.0 0.0 0.0
2019 4584 0.0 0.0 0.0
2020 2064 0.0 0.0 0.0

For data sources see[6]

References