X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0315021507002

Well Details

Well ID: 0315021507002
Loading map...
Location: 00/07-15-031-02W5/2
Location Alias: 00/07-15-31-02 W5M
Location Alias 2: 00/07-15-031-02 W5/02
Country: Canada
Province: Alberta
Township: 031
Meridian: 5
Range: 02
Section: 15
County/Municipality: Mountain View County
Well Name: TRANSGLOBE GARR 7-15-31-2
Operator Name: TransGlobe Energy Corporation
License Number: 0421448
License Date: 2010-06-30
License Status: Suspension
Spud Date: 2010-07-08
Final Drill Date: 2010-07-27
Well Total Depth: 3040.00 m
Surface Hole Latitude: 51.655734
Surface Hole Longitude: -114.211242

For data sources see[1][2]

Well History

Date Event
2010-06-30 Obtained License
2010-07-10 Surface Casing Operation Performed
2010-07-14 Direction Drilling Operation Performed - Horizontal
2010-07-19 Intermediate Casing Operation Performed
2010-07-25 Direction Drilling Operation Performed - Horizontal
2010-07-27 Finished Drilling
2010-07-27 Well Mode changed to Drilled and Cased
2010-07-28 Liner Casing Operation Performed
2010-08-01 Perforation Treatment Performed - Open-Hole Completion
2010-08-01 Rig Released
2010-08-01 Well Fluid changed to Crude Oil
2010-08-01 Well Mode changed to Drilling and Completing
2010-08-19 Perforation Treatment Performed - Multi-Stage Fracture
2010-09-01 Well Began Production
2010-09-01 Well Fluid changed to Crude Oil
2010-09-01 Well Mode changed to Flowing
2012-01-01 Well Fluid changed to Crude Oil
2012-01-01 Well Mode changed to Pumping
2014-07-01 Well Fluid changed to Crude Oil
2014-07-01 Well Mode changed to Suspended
2019-07-02 Well Fluid changed to Crude Oil
2019-07-02 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-07-14 2141.00 Horizontal
2010-07-25 2767.70 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-08-01 Open Hole/Barefoot Completion 2782.00 3040.00 0
2010-08-19 Multi-Stage Fracture 2781.30 2781.40 0
2010-08-19 Multi-Stage Fracture 2744.60 2744.70 0
2010-08-19 Multi-Stage Fracture 2680.00 2680.10 0
2010-08-19 Multi-Stage Fracture 2618.30 2618.40 0
2010-08-19 Multi-Stage Fracture 2556.70 2556.80 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 2544 0.0 0.0 0.0
2011 7683 0.0 0.0 0.0
2012 8451 0.0 0.0 0.0
2013 7790 0.0 0.0 0.0
2014 1728 0.0 0.0 0.0
2019 2496 0.0 0.0 0.0
2020 1056 0.0 0.0 0.0

For data sources see[6]

References