X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0315020814000

Well Details

Well ID: 0315020814000
Loading map...
Location: 00/14-08-031-02W5/0
Location Alias: 00/14-08-31-02 W5M
Location Alias 2: 00/14-08-031-02 W5/00
Country: Canada
Province: Alberta
Township: 031
Meridian: 5
Range: 02
Section: 08
County/Municipality: Mountain View County
Well Name: NAL HARME 14-8-31-2
Operator Name: NAL Resources Limited
License Number: 0446364
License Date: 2012-06-08
License Status: Amended
Spud Date: 2012-07-01
Final Drill Date: 2012-07-26
Well Total Depth: 3604.50 m
Surface Hole Latitude: 51.646113
Surface Hole Longitude: -114.236434

For data sources see[1][2]

Well History

Date Event
2012-06-08 Obtained License
2012-07-02 Lost Circulation Occurred
2012-07-04 Surface Casing Operation Performed
2012-07-07 Lost Circulation Occurred
2012-07-11 Direction Drilling Operation Performed - Deviate
2012-07-15 Direction Drilling Operation Performed - Horizontal
2012-07-16 Intermediate Casing Operation Performed
2012-07-26 Finished Drilling
2012-07-26 Liner Casing Operation Performed
2012-07-26 Well Mode changed to Drilled and Cased
2012-07-28 Perforation Treatment Performed - Open-Hole Completion
2012-07-29 Rig Released
2012-08-01 Well Log Performed
2012-08-09 Perforation Treatment Performed - Multi-Stage Fracture
2012-08-27 Well Began Production
2012-08-27 Well Fluid changed to Gas
2012-08-27 Well Mode changed to Flowing
2012-12-13 Well Fluid changed to Gas
2012-12-13 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2012-07-11 2184.00 Deviate (5 - 79 degrees)
2012-07-15 2560.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-07-28 Open Hole/Barefoot Completion 3601.50 3604.50 0
2012-08-09 Multi-Stage Fracture 2818.30 2818.40 0
2012-08-09 Multi-Stage Fracture 2744.70 2744.80 0
2012-08-09 Multi-Stage Fracture 2659.60 2659.70 0
2012-08-09 Multi-Stage Fracture 3592.20 3592.30 0
2012-08-09 Multi-Stage Fracture 3527.50 3527.60 0
2012-08-09 Multi-Stage Fracture 3443.70 3443.80 0
2012-08-09 Multi-Stage Fracture 3346.90 3347.00 0
2012-08-09 Multi-Stage Fracture 3212.80 3212.90 0
2012-08-09 Multi-Stage Fracture 3117.20 3117.30 0
2012-08-09 Multi-Stage Fracture 3010.10 3010.20 0
2012-08-09 Multi-Stage Fracture 2913.30 2913.40 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 2727 0.0 0.0 0.0
2013 7433 0.0 0.0 0.0
2014 8699 0.0 0.0 0.0
2015 8599 0.0 0.0 0.0
2016 8440 0.0 0.0 0.0
2017 8435 0.0 0.0 0.0
2018 7772 0.0 0.0 0.0
2019 7901 0.0 0.0 0.0
2020 2063 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-07-02 Lost Circulation 12.00 244.90
2012-07-07 Lost Circulation 1392.00 1700.00
2012-08-01 No Incident Encountered 0.00 0.00

For data sources see[7]

References