If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0314272615002 | |
| Location: 00/15-26-031-27W4/2 | |
| Location Alias: 00/15-26-31-27 W4M | |
| Location Alias 2: 00/15-26-031-27 W4/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 031 | |
| Meridian: 4 | |
| Range: 27 | |
| Section: 26 | |
| County/Municipality: Mountain View County | |
| Well Name: CNRL LPINECK 15-26-31-27 | |
| Operator Name: Canadian Natural Resources Limited | |
| License Number: 0327092 | |
| License Date: 2005-02-25 | |
| License Status: Issued | |
| Spud Date: 2005-05-16 | |
| Final Drill Date: 2005-05-28 | |
| Well Total Depth: 2312.00 m | |
| Surface Hole Latitude: 51.689797 | |
| Surface Hole Longitude: -113.722360 |
| Date | Event |
|---|---|
| 2005-02-25 | Obtained License |
| 2005-05-18 | Surface Casing Operation Performed |
| 2005-05-28 | Finished Drilling |
| 2005-05-28 | Well Log Performed |
| 2005-05-28 | Well Mode changed to Drilled and Cased |
| 2005-05-31 | Production Casing Operation Performed |
| 2005-05-31 | Rig Released |
| 2005-06-17 | Well Log Performed |
| 2005-07-12 | Well Log Performed |
| 2005-07-14 | Perforation Treatment Performed - Jet Perforation |
| 2005-07-15 | Perforation Treatment Performed - Fractured |
| 2005-07-22 | Perforation Treatment Performed - Jet Perforation |
| 2005-07-22 | Well Log Performed |
| 2005-07-23 | Perforation Treatment Performed - Fractured |
| 2005-11-05 | Well Log Performed |
| 2005-11-07 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2005-11-07 | Perforation Treatment Performed - Cement Squeeze |
| 2005-11-07 | Plug Back Performed |
| 2005-11-07 | Well Mode changed to Abandoned Zone |
| 2005-12-01 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2006-07-18 | Perforation Treatment Performed - Jet Perforation |
| 2006-07-18 | Well Log Performed |
| 2006-07-20 | Perforation Treatment Performed - Fractured |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2005-07-14 | Perforation | 2268.00 | 2273.00 | 17 |
| 2005-07-15 | Fracture | 2268.00 | 2273.00 | 0 |
| 2005-07-22 | Perforation | 1953.50 | 1958.50 | 17 |
| 2005-07-23 | Fracture | 1953.50 | 1958.50 | 0 |
| 2005-11-07 | Cement Squeeze | 1953.50 | 1958.50 | 0 |
| 2005-11-07 | Packing Device Capped w/Cement | 1894.70 | 1950.00 | 0 |
| 2005-12-01 | Packing Device Capped w/Cement | 1847.00 | 1855.00 | 0 |
| 2006-07-18 | Perforation | 1676.50 | 1678.50 | 17 |
| 2006-07-20 | Fracture | 1676.50 | 1678.50 | 0 |
For data sources see[4]