X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0314261608000

Well Details

Well ID: 0314261608000
Loading map...
Location: 00/08-16-031-26W4/0
Location Alias: 00/08-16-31-26 W4M
Location Alias 2: 00/08-16-031-26 W4/00
Country: Canada
Province: Alberta
Township: 031
Meridian: 4
Range: 26
Section: 16
County/Municipality: Kneehill County
Well Name: EMBER WORKMAN 8-16-31-26
Operator Name: Ember Resources Inc.
License Number: 0372077
License Date: 2007-01-16
License Status: Suspension
Spud Date: 2007-01-19
Final Drill Date: 2007-01-21
Well Total Depth: 1031.00 m
Surface Hole Latitude: 51.655901
Surface Hole Longitude: -113.620307

For data sources see[1][2]

Well History

Date Event
2007-01-16 Obtained License
2007-01-19 Surface Casing Operation Performed
2007-01-21 Finished Drilling
2007-01-21 Production Casing Operation Performed
2007-01-21 Rig Released
2007-01-21 Well Log Performed
2007-01-21 Well Mode changed to Drilled and Cased
2007-02-13 Well Log Performed
2007-07-12 Perforation Treatment Performed - Jet Perforation
2007-07-12 Well Log Performed
2007-07-26 Well Log Performed
2007-07-27 Perforation Treatment Performed - Cement Squeeze
2007-07-27 Plug Back Performed
2007-07-27 Well Log Performed
2007-07-31 Perforation Treatment Performed - Cement Squeeze
2007-07-31 Perforation Treatment Performed - Jet Perforation
2007-07-31 Plug Back Performed
2007-07-31 Well Log Performed
2007-08-23 Well Log Performed
2008-02-19 Perforation Treatment Performed - Jet Perforation
2008-02-19 Well Log Performed
2008-03-11 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2007-07-12 Perforation 355.00 356.00 14
2008-02-19 Perforation 516.70 517.20 13
2008-02-19 Perforation 526.90 527.40 13
2008-02-19 Perforation 550.00 553.00 13
2008-02-19 Perforation 572.50 573.50 13
2008-02-19 Perforation 594.50 596.00 13
2008-02-19 Perforation 597.00 597.50 13
2008-02-19 Perforation 601.00 603.00 13
2008-02-19 Perforation 620.00 620.50 13
2008-02-19 Perforation 621.70 622.20 13
2008-02-19 Perforation 638.50 639.50 13
2007-07-27 Cement Squeeze 355.00 356.00 0
2008-02-19 Perforation 661.60 664.60 13
2008-02-19 Perforation 666.00 666.50 13
2008-02-19 Perforation 667.50 668.50 13
2008-02-19 Perforation 672.00 672.50 13
2008-02-19 Perforation 676.80 677.30 13
2008-02-19 Perforation 678.60 679.10 13
2008-03-11 Fracture 676.80 679.10 0
2008-03-11 Fracture 672.00 672.50 0
2008-03-11 Fracture 661.60 668.50 0
2008-03-11 Fracture 638.50 639.50 0
2007-07-31 Perforation 165.00 166.00 14
2008-03-11 Fracture 620.00 622.20 0
2008-03-11 Fracture 597.00 603.00 0
2008-03-11 Fracture 594.50 596.00 0
2008-03-11 Fracture 572.50 573.50 0
2008-03-11 Fracture 550.00 553.00 0
2008-03-11 Fracture 526.90 527.40 0
2008-03-11 Fracture 516.70 517.20 0
2008-03-11 Fracture 484.00 486.00 0
2008-03-11 Fracture 438.00 441.00 0
2008-03-11 Fracture 388.00 392.60 0
2007-07-31 Cement Squeeze 165.00 166.00 0
2008-03-11 Fracture 380.00 380.50 0
2008-02-19 Perforation 380.00 380.50 13
2008-02-19 Perforation 388.00 390.50 13
2008-02-19 Perforation 392.10 392.60 13
2008-02-19 Perforation 438.00 441.00 13
2008-02-19 Perforation 484.00 486.00 13

For data sources see[4]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-12-15 No Incident Encountered 0.00 0.00

For data sources see[5]

References