If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0314260309002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.630719,"lon":-113.600225,"icon":""}]} |
Location: 00/09-03-031-26W4/2 | |
Location Alias: 00/09-03-31-26 W4M | |
Location Alias 2: 00/09-03-031-26 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 031 | |
Meridian: 4 | |
Range: 26 | |
Section: 03 | |
County/Municipality: Kneehill County | |
Well Name: EMBER WORKMAN 9-3-31-26 | |
Operator Name: Ember Resources Inc. | |
License Number: 0325669 | |
License Date: 2005-02-04 | |
License Status: Issued | |
Spud Date: 2005-05-15 | |
Final Drill Date: 2005-05-20 | |
Well Total Depth: 1034.00 m | |
Surface Hole Latitude: 51.630719 | |
Surface Hole Longitude: -113.600225 |
Date | Event |
---|---|
2005-02-04 | Obtained License |
2005-05-16 | Surface Casing Operation Performed |
2005-05-20 | Finished Drilling |
2005-05-20 | Well Log Performed |
2005-05-20 | Well Mode changed to Drilled and Cased |
2005-05-21 | Production Casing Operation Performed |
2005-05-21 | Rig Released |
2005-07-01 | Perforation Treatment Performed - Jet Perforation |
2005-07-01 | Well Log Performed |
2005-07-04 | Perforation Treatment Performed - Fractured |
2005-07-05 | Perforation Treatment Performed - Fractured |
2005-07-05 | Perforation Treatment Performed - Jet Perforation |
2005-07-05 | Well Log Performed |
2005-10-13 | Well Began Production |
2005-10-13 | Well Fluid changed to Gas |
2005-10-13 | Well Mode changed to Flowing |
2006-01-08 | Well Structure changed to Commingled |
2006-05-25 | Perforation Treatment Performed - Jet Perforation |
2006-05-25 | Well Log Performed |
2006-05-26 | Perforation Treatment Performed - Fractured |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2005-07-01 | Perforation | 827.00 | 829.00 | 17 |
2006-05-25 | Perforation | 253.90 | 254.40 | 17 |
2006-05-25 | Perforation | 263.30 | 263.80 | 17 |
2006-05-25 | Perforation | 485.10 | 485.60 | 17 |
2006-05-25 | Perforation | 492.40 | 492.90 | 17 |
2006-05-25 | Perforation | 498.30 | 498.90 | 17 |
2006-05-25 | Perforation | 500.00 | 500.50 | 17 |
2006-05-25 | Perforation | 503.70 | 504.20 | 17 |
2006-05-25 | Perforation | 545.20 | 545.70 | 17 |
2006-05-25 | Perforation | 564.10 | 565.10 | 17 |
2006-05-25 | Perforation | 570.00 | 570.50 | 17 |
2005-07-01 | Perforation | 949.00 | 950.50 | 17 |
2006-05-25 | Perforation | 596.50 | 597.50 | 17 |
2006-05-25 | Perforation | 612.20 | 612.70 | 17 |
2006-05-25 | Perforation | 635.00 | 638.00 | 17 |
2006-05-25 | Perforation | 644.00 | 646.00 | 17 |
2006-05-25 | Perforation | 648.20 | 649.20 | 17 |
2006-05-25 | Perforation | 653.70 | 654.20 | 17 |
2006-05-25 | Perforation | 656.40 | 657.40 | 17 |
2006-05-25 | Perforation | 664.00 | 667.00 | 17 |
2006-05-25 | Perforation | 671.40 | 671.90 | 17 |
2006-05-26 | Fracture | 252.00 | 263.80 | 0 |
2005-07-04 | Fracture | 827.00 | 950.50 | 0 |
2006-05-26 | Fracture | 485.10 | 504.20 | 0 |
2006-05-26 | Fracture | 545.20 | 545.70 | 0 |
2006-05-26 | Fracture | 564.10 | 570.50 | 0 |
2006-05-26 | Fracture | 596.50 | 657.40 | 0 |
2006-05-26 | Fracture | 671.40 | 671.90 | 0 |
2005-07-05 | Perforation | 421.00 | 424.00 | 17 |
2005-07-05 | Perforation | 523.00 | 526.00 | 17 |
2005-07-05 | Perforation | 556.00 | 558.00 | 17 |
2005-07-05 | Perforation | 575.00 | 580.00 | 17 |
2005-07-05 | Fracture | 421.00 | 580.00 | 0 |
2006-05-25 | Perforation | 252.00 | 252.50 | 17 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2005 | 1414 | 0.0 | 0.0 | 0.0 |
2006 | 54 | 0.0 | 0.0 | 0.0 |
For data sources see[5]