X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0314253201000

Well Details

Well ID: 0314253201000
Loading map...
Location: 00/01-32-031-25W4/0
Location Alias: 00/01-32-31-25 W4M
Location Alias 2: 00/01-32-031-25 W4/00
Country: Canada
Province: Alberta
Township: 031
Meridian: 4
Range: 25
Section: 32
County/Municipality: Kneehill County
Well Name: ARTIS HZ TWINING 1-32-31-25
Operator Name: Artis Exploration Ltd.
License Number: 0487545
License Date: 2018-01-05
License Status: Amended
Spud Date: 2018-07-27
Final Drill Date: 2018-08-08
Well Total Depth: 5596.00 m
Surface Hole Latitude: 51.665362
Surface Hole Longitude: -113.498231

For data sources see[1][2]

Well History

Date Event
2018-01-05 Obtained License
2018-07-27 Surface Casing Operation Performed
2018-07-30 Intermediate Casing Operation Performed
2018-07-31 Direction Drilling Operation Performed - Deviate
2018-08-02 Direction Drilling Operation Performed - Horizontal
2018-08-03 Well Log Performed
2018-08-08 Finished Drilling
2018-08-08 Well Log Performed
2018-08-08 Well Mode changed to Drilled and Cased
2018-08-09 Production Casing Operation Performed
2018-08-10 Rig Released
2018-08-15 Well Log Performed
2018-08-23 Perforation Treatment Performed - Multi-Stage Fracture
2018-08-26 Perforation Treatment Performed - Jet Perforation
2018-08-26 Perforation Treatment Performed - Multi-Stage Fracture
2018-08-27 Perforation Treatment Performed - Jet Perforation
2018-08-27 Perforation Treatment Performed - Multi-Stage Fracture
2018-08-28 Perforation Treatment Performed - Jet Perforation
2018-08-28 Perforation Treatment Performed - Multi-Stage Fracture
2018-08-29 Perforation Treatment Performed - Jet Perforation
2018-08-29 Perforation Treatment Performed - Multi-Stage Fracture
2018-08-30 Perforation Treatment Performed - Jet Perforation
2018-08-30 Perforation Treatment Performed - Multi-Stage Fracture
2018-08-31 Perforation Treatment Performed - Jet Perforation
2018-08-31 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-01 Perforation Treatment Performed - Jet Perforation
2018-09-01 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-02 Perforation Treatment Performed - Jet Perforation
2018-09-02 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-03 Perforation Treatment Performed - Jet Perforation
2018-09-03 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-04 Perforation Treatment Performed - Jet Perforation
2018-09-04 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-05 Perforation Treatment Performed - Jet Perforation
2018-09-05 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-09 Well Began Production
2018-09-09 Well Fluid changed to Crude Oil
2018-09-09 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2018-07-27 Trinidad Drilling Ltd. 418 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2018-07-31 2122.20 Deviate (5 - 79 degrees)
2018-08-02 2519.40 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-08-23 Multi-Stage Fracture 5527.00 5556.00 0
2018-08-26 Perforation 5409.50 5410.00 7
2018-08-30 Multi-Stage Fracture 4250.50 4296.80 0
2018-08-30 Perforation 4235.30 4235.80 7
2018-08-30 Perforation 4220.00 4220.50 7
2018-08-30 Perforation 4204.80 4205.30 7
2018-08-30 Perforation 4189.50 4190.00 7
2018-08-30 Multi-Stage Fracture 4189.50 4235.80 0
2018-08-30 Perforation 4174.30 4174.80 7
2018-08-30 Perforation 4159.00 4159.50 7
2018-08-30 Perforation 4143.80 4144.30 7
2018-08-30 Perforation 4128.50 4129.00 7
2018-08-26 Multi-Stage Fracture 5409.50 5455.80 0
2018-08-31 Multi-Stage Fracture 4128.50 4174.80 0
2018-08-31 Perforation 4113.30 4113.80 7
2018-08-31 Perforation 4098.00 4098.50 7
2018-08-31 Perforation 4082.80 4083.30 7
2018-08-31 Perforation 4067.50 4068.00 7
2018-08-31 Multi-Stage Fracture 4067.50 4113.80 0
2018-08-31 Perforation 4052.30 4052.80 7
2018-08-31 Perforation 4037.00 4037.50 7
2018-08-31 Perforation 4021.80 4022.30 7
2018-08-31 Perforation 4006.50 4007.00 7
2018-08-26 Perforation 5394.30 5394.80 7
2018-08-31 Multi-Stage Fracture 4006.50 4052.80 0
2018-08-31 Perforation 3991.30 3991.80 7
2018-08-31 Perforation 3976.00 3976.50 7
2018-08-31 Perforation 3960.80 3961.30 7
2018-08-31 Perforation 3945.50 3946.00 7
2018-08-31 Multi-Stage Fracture 3945.50 3991.80 0
2018-08-31 Perforation 3930.30 3930.80 7
2018-08-31 Perforation 3915.00 3915.50 7
2018-08-31 Perforation 3899.80 3900.30 7
2018-08-31 Perforation 3884.50 3885.00 7
2018-08-26 Perforation 5379.00 5379.50 7
2018-08-31 Multi-Stage Fracture 3884.50 3930.80 0
2018-08-31 Perforation 3869.30 3869.80 7
2018-08-31 Perforation 3854.00 3854.50 7
2018-08-31 Perforation 3838.80 3839.30 7
2018-08-31 Perforation 3823.50 3824.00 7
2018-09-01 Multi-Stage Fracture 3823.50 3869.80 0
2018-09-01 Perforation 3808.30 3808.80 7
2018-09-01 Perforation 3793.00 3793.50 7
2018-09-01 Perforation 3777.80 3778.30 7
2018-09-01 Perforation 3762.50 3763.00 7
2018-08-26 Perforation 5363.80 5364.30 7
2018-09-01 Multi-Stage Fracture 3762.50 3808.80 0
2018-09-01 Perforation 3747.30 3747.80 7
2018-09-01 Perforation 3732.00 3732.50 7
2018-09-01 Perforation 3716.80 3717.30 7
2018-09-01 Perforation 3701.50 3702.00 7
2018-09-01 Multi-Stage Fracture 3701.50 3747.80 0
2018-09-01 Perforation 3686.30 3686.80 7
2018-09-01 Perforation 3671.00 3671.50 7
2018-09-01 Perforation 3655.80 3656.30 7
2018-09-01 Perforation 3640.50 3641.00 7
2018-08-26 Perforation 5348.50 5349.00 7
2018-09-01 Multi-Stage Fracture 3640.50 3686.80 0
2018-09-01 Perforation 3625.30 3625.80 7
2018-09-01 Perforation 3610.00 3610.50 7
2018-09-01 Perforation 3594.80 3595.30 7
2018-09-01 Perforation 3579.50 3580.00 7
2018-09-02 Multi-Stage Fracture 3579.50 3625.80 0
2018-09-02 Perforation 3564.30 3564.80 7
2018-09-02 Perforation 3549.00 3549.50 7
2018-09-02 Perforation 3533.80 3534.30 7
2018-09-02 Perforation 3518.50 3519.00 7
2018-08-26 Multi-Stage Fracture 5348.50 5394.80 0
2018-09-02 Multi-Stage Fracture 3518.50 3564.80 0
2018-09-02 Perforation 3503.30 3503.80 7
2018-09-02 Perforation 3488.00 3488.50 7
2018-09-02 Perforation 3472.80 3473.30 7
2018-09-02 Perforation 3457.50 3458.00 7
2018-09-02 Multi-Stage Fracture 3457.50 3503.80 0
2018-09-03 Perforation 3442.30 3442.80 7
2018-09-03 Perforation 3427.00 3427.50 7
2018-09-03 Perforation 3411.80 3412.30 7
2018-09-03 Perforation 3396.50 3397.00 7
2018-08-27 Perforation 5333.30 5333.80 7
2018-09-03 Multi-Stage Fracture 3396.50 3442.80 0
2018-09-03 Perforation 3381.30 3381.80 7
2018-09-03 Perforation 3366.00 3366.50 7
2018-09-03 Perforation 3350.80 3351.30 7
2018-09-03 Perforation 3335.50 3336.00 7
2018-09-03 Multi-Stage Fracture 3335.50 3381.80 0
2018-09-03 Perforation 3320.30 3320.80 7
2018-09-03 Perforation 3305.00 3305.50 7
2018-09-03 Perforation 3289.80 3290.30 7
2018-09-03 Perforation 3274.50 3275.00 7
2018-08-27 Perforation 5318.00 5318.50 7
2018-09-03 Multi-Stage Fracture 3274.50 3320.80 0
2018-09-03 Perforation 3259.30 3259.80 7
2018-09-03 Perforation 3244.00 3244.50 7
2018-09-03 Perforation 3228.80 3229.30 7
2018-09-03 Perforation 3213.50 3214.00 7
2018-09-03 Multi-Stage Fracture 3213.50 3259.80 0
2018-09-03 Perforation 3198.30 3198.80 7
2018-09-03 Perforation 3183.00 3183.50 7
2018-09-03 Perforation 3167.80 3168.30 7
2018-09-03 Perforation 3152.50 3153.00 7
2018-08-27 Perforation 5302.80 5303.30 7
2018-09-04 Multi-Stage Fracture 3152.50 3198.80 0
2018-09-04 Perforation 3137.30 3137.80 7
2018-09-04 Perforation 3122.00 3122.50 7
2018-09-04 Perforation 3106.80 3107.30 7
2018-09-04 Perforation 3091.50 3092.00 7
2018-09-04 Multi-Stage Fracture 3091.50 3137.80 0
2018-09-04 Perforation 3076.30 3076.80 7
2018-09-04 Perforation 3061.00 3061.50 7
2018-09-04 Perforation 3045.80 3046.30 7
2018-09-04 Perforation 3030.50 3031.00 7
2018-08-26 Perforation 5517.00 5517.50 7
2018-08-27 Perforation 5287.50 5288.00 7
2018-09-04 Multi-Stage Fracture 3030.50 3076.80 0
2018-09-04 Perforation 3015.30 3015.80 7
2018-09-04 Perforation 3000.00 3000.50 7
2018-09-04 Perforation 2984.80 2985.30 7
2018-09-04 Perforation 2969.50 2970.00 7
2018-09-04 Multi-Stage Fracture 2969.50 3015.80 0
2018-09-04 Perforation 2954.30 2954.80 7
2018-09-04 Perforation 2939.00 2939.50 7
2018-09-04 Perforation 2923.80 2924.30 7
2018-09-04 Perforation 2908.50 2909.00 7
2018-08-27 Multi-Stage Fracture 5287.50 5333.80 0
2018-09-04 Multi-Stage Fracture 2908.50 2954.80 0
2018-09-04 Perforation 2893.30 2893.80 7
2018-09-04 Perforation 2878.00 2878.50 7
2018-09-04 Perforation 2862.80 2863.30 7
2018-09-04 Perforation 2847.50 2848.00 7
2018-09-05 Multi-Stage Fracture 2847.50 2893.80 0
2018-09-05 Perforation 2827.50 2828.00 7
2018-09-05 Perforation 2807.50 2808.00 7
2018-09-05 Perforation 2787.50 2788.00 7
2018-09-05 Perforation 2767.50 2768.00 7
2018-08-27 Perforation 5272.30 5272.80 7
2018-09-05 Multi-Stage Fracture 2767.50 2828.00 0
2018-09-05 Perforation 2747.50 2748.00 7
2018-09-05 Perforation 2727.50 2828.00 7
2018-09-05 Perforation 2707.50 2708.00 7
2018-09-05 Perforation 2687.50 2688.00 7
2018-09-05 Multi-Stage Fracture 2687.50 2748.00 0
2018-09-05 Perforation 2667.50 2668.00 7
2018-09-05 Perforation 2647.50 2648.00 7
2018-09-05 Perforation 2627.50 2628.00 7
2018-09-05 Perforation 2607.50 2608.00 7
2018-08-27 Perforation 5257.00 5257.50 7
2018-09-05 Multi-Stage Fracture 2607.50 2668.00 0
2018-08-27 Perforation 5241.80 5242.30 7
2018-08-27 Perforation 5226.50 5227.00 7
2018-08-27 Multi-Stage Fracture 5226.50 5272.80 0
2018-08-27 Perforation 5211.30 5211.80 7
2018-08-27 Perforation 5196.00 5196.50 7
2018-08-27 Perforation 5180.80 5181.30 7
2018-08-26 Perforation 5501.00 5501.50 7
2018-08-27 Perforation 5165.50 5166.00 7
2018-08-27 Multi-Stage Fracture 5165.50 5211.80 0
2018-08-27 Perforation 5150.30 5150.80 7
2018-08-27 Perforation 5135.00 5135.50 7
2018-08-27 Perforation 5119.80 5120.30 7
2018-08-27 Perforation 5104.50 5105.00 7
2018-08-27 Multi-Stage Fracture 5104.50 5150.80 0
2018-08-28 Perforation 5089.30 5089.80 7
2018-08-28 Perforation 5074.00 5074.50 7
2018-08-28 Perforation 5058.80 5059.30 7
2018-08-26 Perforation 5485.80 5486.30 7
2018-08-28 Perforation 5043.50 5044.00 7
2018-08-28 Multi-Stage Fracture 5043.50 5089.80 0
2018-08-28 Perforation 5028.30 5028.80 7
2018-08-28 Perforation 5013.00 5013.50 7
2018-08-28 Perforation 4997.80 4998.30 7
2018-08-28 Perforation 4982.50 4983.00 7
2018-08-28 Multi-Stage Fracture 4982.50 5028.80 0
2018-08-28 Perforation 4967.30 4967.80 7
2018-08-28 Perforation 4952.00 4952.50 7
2018-08-28 Perforation 4936.80 4937.30 7
2018-08-26 Perforation 5470.50 5471.00 7
2018-08-28 Perforation 4921.50 4922.00 7
2018-08-28 Multi-Stage Fracture 4921.50 4967.80 0
2018-08-28 Perforation 4906.30 4906.80 7
2018-08-28 Perforation 4891.00 4891.50 7
2018-08-28 Perforation 4875.50 4876.30 7
2018-08-28 Perforation 4860.50 4861.00 7
2018-08-28 Multi-Stage Fracture 4860.50 4906.80 0
2018-08-29 Perforation 4784.30 4784.80 7
2018-08-29 Perforation 4769.00 4769.50 7
2018-08-29 Perforation 4753.80 4754.30 7
2018-08-26 Multi-Stage Fracture 5470.50 5517.50 0
2018-08-29 Perforation 4738.50 4739.00 7
2018-08-29 Multi-Stage Fracture 4738.50 4784.80 0
2018-08-29 Perforation 4723.30 4723.80 7
2018-08-29 Perforation 4708.00 4708.50 7
2018-08-29 Perforation 4692.80 4693.30 7
2018-08-29 Perforation 4677.50 4678.00 7
2018-08-29 Multi-Stage Fracture 4677.50 4723.80 0
2018-08-29 Perforation 4662.30 4662.80 7
2018-08-29 Perforation 4647.00 4647.50 7
2018-08-29 Perforation 4631.80 4632.30 7
2018-08-26 Perforation 5455.30 5455.80 7
2018-08-29 Perforation 4616.50 4617.00 7
2018-08-29 Multi-Stage Fracture 4616.50 4662.80 0
2018-08-29 Perforation 4601.30 4601.80 7
2018-08-29 Perforation 4586.00 4586.50 7
2018-08-29 Perforation 4570.80 4571.30 7
2018-08-29 Perforation 4555.50 4556.00 7
2018-08-29 Multi-Stage Fracture 4555.50 4601.80 0
2018-08-29 Perforation 4540.30 4540.80 7
2018-08-29 Perforation 4525.00 4525.50 7
2018-08-29 Perforation 4509.80 4510.30 7
2018-08-26 Perforation 5440.00 5440.50 7
2018-08-30 Multi-Stage Fracture 4509.80 4540.80 0
2018-08-30 Perforation 4479.30 4479.80 7
2018-08-30 Perforation 4464.00 4464.50 7
2018-08-30 Perforation 4448.80 4449.30 7
2018-08-30 Perforation 4433.50 4434.00 7
2018-08-30 Multi-Stage Fracture 4433.50 4479.80 0
2018-08-30 Perforation 4418.30 4418.80 7
2018-08-30 Perforation 4403.00 4403.50 7
2018-08-30 Perforation 4387.80 4388.30 7
2018-08-30 Perforation 4372.50 4373.00 7
2018-08-26 Perforation 5424.80 5425.30 7
2018-08-30 Multi-Stage Fracture 4372.50 4418.80 0
2018-08-30 Perforation 4357.30 4357.80 7
2018-08-30 Perforation 4342.00 4342.50 7
2018-08-30 Perforation 4326.80 4327.30 7
2018-08-30 Perforation 4311.50 4312.00 7
2018-08-30 Multi-Stage Fracture 4311.50 4357.80 0
2018-08-30 Perforation 4296.30 4296.80 7
2018-08-30 Perforation 4281.00 4281.50 7
2018-08-30 Perforation 4265.80 4266.30 7
2018-08-30 Perforation 4250.50 4251.00 7

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-08-23 2018-09-05 2,398 42,400 N/A
2 2018-08-26 2018-09-05 2,398 0 N/A
3 2018-08-23 2018-09-03 2,398 0 N/A
4 2018-08-29 2018-09-05 2,398 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water 7732-18-5 100 90.0994 N/A
40/70 Domestic Sand Step Energy Services Crystalline Silica 14808-60-7 100 3.793 N/A
50/140 Domestic Sand Step Energy Services Crystalline Silica 14808-60-7 100 0.5114 N/A
15% HCL Acid Step Energy Services Acid Hydrochloric Acid 7647-01-0 100 0.6613 N/A
Water 7732-18-5 100 0.6613 N/A
SAB-1 Acid Blend Step Energy Services Acid Acetic Acid 64-19-7 100 0.007 N/A
Ethylene Glycol 107-21-1 100 0.007 N/A
Methyl Alcohol 67-56-1 100 0.007 N/A
Non Hazardous Ingredients Not Available 100 0.007 N/A
Propan-2-ol 67-63-0 100 0.007 N/A
Aqucar 742 (Biocide) Step Energy Services Bactericide/Biocide Ethanol 64-17-5 100 0.0142 N/A
Glutaraldehyde 111-30-8 100 0.0142 N/A
Methanol 67-56-1 100 0.0142 N/A
Non-Hazardous Ingredients Not Available 100 0.0142 N/A
Quaternary ammonium compounds.
benzyl-C12-16-alkyldimethyl. chlorides
68424-85-1 100 0.0142 N/A
SCBO-2 (Breaker) Step Energy Services Breaker Ammonium Persulfate 7727-54-0 100 0.0108 N/A
Cured Acrylic Resin Not Available 100 0.0108 N/A
Non-Hazardous Ingredients Not Available 100 0.0108 N/A
SFR-106 (Friction Reducer) Step Energy Services Friction Reducer Ethoxylated Alcohol 78330-21-9 100 0.0615 N/A
Non-Hazardous Ingredients Not Available 100 0.0615 N/A
Petroleum distillates. hydrotreated light 64742-47-8 100 0.0615 N/A
SWG-101 (Gellant) Step Energy Services Gelling Agent Guar gum 9000-30-0 100 0.1328 N/A
SSI-1 (Scale Inhibitor) Step Energy Services Scale Inhibitor Methyl Alcohol 67-56-1 100 0.0148 N/A
Non-Hazardous Ingredients Not Available 100 0.0148 N/A
SAS-4 (Anti-Sludge) Step Energy Services Surfactant 1.1' - Oxybisbenzene. tetrapropylene dervis. sulfonated 119345-03-8 100 0.0032 N/A
Alkylbenzene sulfonic acid 27176-87-0 100 0.0032 N/A
Methanol 67-56-1 100 0.0032 N/A
Xylene 1330-20-7 100 0.0032 N/A
SNE-2 (Non-Emulsifier) Step Energy Services Surfactant 2-Ethylhexanol distillation residue 68609-68-7 100 0.09 N/A
Dodecylbenzene Sulfonic Acid 27176-87-0 100 0.09 N/A
Methanol 67-56-1 100 0.09 N/A
Monoethanolamine 141-43-5 100 0.09 N/A
Oxirane. methyl-. polymer 11/6/9003 100 0.09 N/A
Poly(oxy-1.2-ethanediyl). alphaisotridecyl-omega-hydroxy- 9043-30-5 100 0.09 N/A
Water 7732-18-5 100 0.09 N/A
2 30/50 Domestic Sand Step Energy Services Crystalline Silica 14808-60-7 100 5.1138 N/A
3 SBH-1 (Buffer) Step Energy Services Buffer Non-Hazardous Ingredients Not Available 100 0.0037 N/A
Potassium Carbonate 584-08-7 100 0.0037 N/A
Potassium Hydroxide 1310-58-3 100 0.0037 N/A
SBX-7 (Crosslinker) Step Energy Services Crosslinker Non-Hazardous Ingredients Not Available 100 0.0816 N/A
Petroleum Distillates. hydrotreated light 64742-47-8 100 0.0816 N/A
4 SBX-1 (Crosslinker) Step Energy Services Crosslinker Boric Acid 10043-35-3 100 0.0175 N/A
Ethylene Glycol 107-21-1 100 0.0175 N/A
Non-Hazardous Ingredients Not Available 100 0.0175 N/A
Potassium Carbonate 584-08-7 100 0.0175 N/A
Potassium Hydroxide 1310-58-3 100 0.0175 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2018-08-20 2018-09-05 Surface Water - Runoff 42711
2018-08-04 2018-08-04 Recycled Fracturing Water (treated at well site) 798
2018-08-07 2018-08-07 Recycled Fracturing Water (treated at well site) 799

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 1916 0.0 0.0 0.0
2019 7744 0.0 0.0 0.0
2020 1995 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-08-02 No Incident Encountered 0.00 0.00
2018-08-23 No Incident Encountered 0.00 0.00

For data sources see[10]

References