If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0314252616000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.690145,"lon":-113.43344,"icon":""}]} |
Location: 00/16-26-031-25W4/0 | |
Location Alias: 00/16-26-31-25 W4M | |
Location Alias 2: 00/16-26-031-25 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 031 | |
Meridian: 4 | |
Range: 25 | |
Section: 26 | |
County/Municipality: Kneehill County | |
Well Name: EMBER TWINING 16-26-31-25 | |
Operator Name: Ember Resources Inc. | |
License Number: 0356082 | |
License Date: 2006-04-25 | |
License Status: Amended | |
Spud Date: 2006-07-24 | |
Final Drill Date: 2006-07-28 | |
Well Total Depth: 974.00 m | |
Surface Hole Latitude: 51.690145 | |
Surface Hole Longitude: -113.433440 |
Date | Event |
---|---|
2006-04-25 | Obtained License |
2006-07-24 | Surface Casing Operation Performed |
2006-07-28 | Finished Drilling |
2006-07-28 | Production Casing Operation Performed |
2006-07-28 | Rig Released |
2006-07-28 | Well Mode changed to Drilled and Cased |
2007-02-15 | Well Log Performed |
2007-05-15 | Perforation Treatment Performed - Jet Perforation |
2007-06-25 | Perforation Treatment Performed - Jet Perforation |
2007-06-25 | Well Log Performed |
2007-07-26 | Perforation Treatment Performed - Fractured |
2007-08-15 | Well Began Production |
2007-08-15 | Well Fluid changed to Coalbed Methane-Coals and Other |
2007-08-15 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2007-05-15 | Perforation | 923.50 | 926.00 | 13 |
2007-06-25 | Perforation | 501.50 | 504.50 | 13 |
2007-06-25 | Perforation | 522.50 | 523.50 | 13 |
2007-06-25 | Perforation | 524.90 | 525.40 | 13 |
2007-06-25 | Perforation | 529.00 | 529.50 | 13 |
2007-06-25 | Perforation | 536.00 | 537.00 | 13 |
2007-06-25 | Perforation | 561.00 | 561.50 | 13 |
2007-06-25 | Perforation | 567.00 | 568.00 | 13 |
2007-06-25 | Perforation | 577.00 | 578.00 | 13 |
2007-06-25 | Perforation | 579.00 | 580.00 | 13 |
2007-06-25 | Perforation | 591.00 | 591.50 | 13 |
2007-06-25 | Perforation | 252.00 | 252.50 | 13 |
2007-06-25 | Perforation | 596.00 | 597.00 | 13 |
2007-06-25 | Perforation | 606.70 | 607.20 | 13 |
2007-06-25 | Perforation | 628.70 | 629.20 | 13 |
2007-06-25 | Perforation | 631.90 | 632.40 | 13 |
2007-07-26 | Fracture | 628.70 | 632.40 | 0 |
2007-07-26 | Fracture | 606.70 | 607.20 | 0 |
2007-07-26 | Fracture | 591.00 | 597.00 | 0 |
2007-07-26 | Fracture | 577.00 | 580.00 | 0 |
2007-07-26 | Fracture | 561.00 | 568.00 | 0 |
2007-07-26 | Fracture | 536.00 | 537.00 | 0 |
2007-06-25 | Perforation | 338.00 | 339.00 | 13 |
2007-07-26 | Fracture | 522.50 | 529.50 | 0 |
2007-07-26 | Fracture | 501.50 | 504.50 | 0 |
2007-07-26 | Fracture | 476.50 | 477.00 | 0 |
2007-07-26 | Fracture | 467.00 | 468.00 | 0 |
2007-07-26 | Fracture | 404.00 | 410.00 | 0 |
2007-07-26 | Fracture | 361.50 | 362.00 | 0 |
2007-07-26 | Fracture | 344.00 | 347.00 | 0 |
2007-07-26 | Fracture | 338.00 | 339.00 | 0 |
2007-07-26 | Fracture | 252.00 | 252.50 | 0 |
2007-06-25 | Perforation | 344.00 | 347.00 | 13 |
2007-06-25 | Perforation | 361.50 | 362.00 | 13 |
2007-06-25 | Perforation | 404.00 | 405.00 | 13 |
2007-06-25 | Perforation | 409.00 | 410.00 | 13 |
2007-06-25 | Perforation | 467.00 | 468.00 | 13 |
2007-06-25 | Perforation | 476.50 | 477.00 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2007 | 3331 | 0.0 | 0.0 | 0.0 |
2008 | 8783 | 0.0 | 0.0 | 0.0 |
2009 | 8759 | 0.0 | 0.0 | 0.0 |
2010 | 8349 | 0.0 | 0.0 | 0.0 |
2011 | 8747 | 0.0 | 0.0 | 0.0 |
2012 | 8591 | 0.0 | 0.0 | 0.0 |
2013 | 8640 | 0.0 | 0.0 | 0.0 |
2014 | 8704 | 0.0 | 0.0 | 0.0 |
2015 | 8565 | 0.0 | 0.0 | 0.0 |
2016 | 8736 | 0.0 | 0.0 | 0.0 |
2017 | 8698 | 0.0 | 0.0 | 0.0 |
2018 | 8601 | 0.0 | 0.0 | 0.0 |
2019 | 8708 | 0.0 | 0.0 | 0.0 |
2020 | 2162 | 0.0 | 0.0 | 0.0 |
For data sources see[5]