X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0314252516030

Well Details

Well ID: 0314252516030
Loading map...
Location: 03/16-25-031-25W4/0
Location Alias: 03/16-25-31-25 W4M
Location Alias 2: 03/16-25-031-25 W4/00
Country: Canada
Province: Alberta
Township: 031
Meridian: 4
Range: 25
Section: 25
County/Municipality: Kneehill County
Well Name: ARTIS HZ 103 TWINING 16-25-31-25
Operator Name: Artis Exploration Ltd.
License Number: 0487843
License Date: 2018-01-26
License Status: Issued
Spud Date: 2018-02-20
Final Drill Date: 2018-03-09
Well Total Depth: 4922.00 m
Surface Hole Latitude: 51.667332
Surface Hole Longitude: -113.408435

For data sources see[1][2]

Well History

Date Event
2018-01-26 Obtained License
2018-02-22 Surface Casing Operation Performed
2018-02-24 Intermediate Casing Operation Performed
2018-02-27 Direction Drilling Operation Performed - Deviate
2018-03-02 Direction Drilling Operation Performed - Horizontal
2018-03-02 Well Log Performed
2018-03-09 Finished Drilling
2018-03-09 Well Log Performed
2018-03-09 Well Mode changed to Drilled and Cased
2018-03-10 Well Log Performed
2018-03-11 Production Casing Operation Performed
2018-03-13 Rig Released
2018-05-30 Well Log Performed
2018-06-04 Perforation Treatment Performed - Jet Perforation
2018-06-04 Perforation Treatment Performed - Multi-Stage Fracture
2018-06-05 Perforation Treatment Performed - Jet Perforation
2018-06-05 Perforation Treatment Performed - Multi-Stage Fracture
2018-06-06 Perforation Treatment Performed - Jet Perforation
2018-06-06 Perforation Treatment Performed - Multi-Stage Fracture
2018-06-07 Perforation Treatment Performed - Jet Perforation
2018-06-07 Perforation Treatment Performed - Multi-Stage Fracture
2018-06-08 Perforation Treatment Performed - Jet Perforation
2018-06-08 Perforation Treatment Performed - Multi-Stage Fracture
2018-06-09 Perforation Treatment Performed - Jet Perforation
2018-06-09 Perforation Treatment Performed - Multi-Stage Fracture
2018-06-10 Perforation Treatment Performed - Jet Perforation
2018-06-10 Perforation Treatment Performed - Multi-Stage Fracture
2018-06-11 Perforation Treatment Performed - Jet Perforation
2018-06-11 Perforation Treatment Performed - Multi-Stage Fracture
2018-06-12 Perforation Treatment Performed - Jet Perforation
2018-06-12 Perforation Treatment Performed - Multi-Stage Fracture
2018-06-13 Perforation Treatment Performed - Jet Perforation
2018-06-13 Perforation Treatment Performed - Multi-Stage Fracture
2018-06-14 Perforation Treatment Performed - Jet Perforation
2018-06-14 Perforation Treatment Performed - Multi-Stage Fracture
2018-06-15 Perforation Treatment Performed - Jet Perforation
2018-06-15 Perforation Treatment Performed - Multi-Stage Fracture
2018-06-16 Perforation Treatment Performed - Jet Perforation
2018-06-16 Perforation Treatment Performed - Multi-Stage Fracture
2018-06-17 Perforation Treatment Performed - Jet Perforation
2018-06-17 Perforation Treatment Performed - Multi-Stage Fracture
2018-06-18 Perforation Treatment Performed - Jet Perforation
2018-06-18 Perforation Treatment Performed - Multi-Stage Fracture
2018-06-19 Perforation Treatment Performed - Jet Perforation
2018-06-19 Perforation Treatment Performed - Multi-Stage Fracture
2018-06-26 Well Began Production
2018-06-26 Well Fluid changed to Crude Oil
2018-06-26 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2018-02-20 Trinidad Drilling Ltd. 418 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2018-02-27 1980.20 Deviate (5 - 79 degrees)
2018-03-02 2476.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-06-04 Multi-Stage Fracture 4863.00 4891.00 0
2018-06-05 Perforation 4755.00 4755.50 7
2018-06-11 Multi-Stage Fracture 3875.00 3912.00 0
2018-06-11 Perforation 3856.00 3857.00 17
2018-06-11 Perforation 3838.00 3839.00 17
2018-06-11 Perforation 3820.00 3821.00 17
2018-06-11 Multi-Stage Fracture 3820.00 3857.00 0
2018-06-12 Perforation 3810.00 3810.50 7
2018-06-12 Perforation 3801.00 3801.50 7
2018-06-12 Perforation 3792.00 3792.50 7
2018-06-12 Perforation 3783.00 3783.50 7
2018-06-12 Perforation 3774.00 3774.50 7
2018-06-05 Multi-Stage Fracture 4755.00 4796.80 0
2018-06-12 Perforation 3765.00 3765.50 7
2018-06-12 Multi-Stage Fracture 3765.00 3810.50 0
2018-06-12 Perforation 3755.00 3755.50 7
2018-06-12 Perforation 3746.00 3746.50 7
2018-06-12 Perforation 3737.00 3737.50 7
2018-06-12 Perforation 3728.00 3728.50 7
2018-06-12 Perforation 3719.00 3719.50 7
2018-06-12 Perforation 3710.00 3710.50 7
2018-06-12 Multi-Stage Fracture 3710.00 3755.50 0
2018-06-12 Perforation 3700.00 3700.50 7
2018-06-05 Perforation 4741.30 4741.80 7
2018-06-12 Perforation 3691.00 3691.50 7
2018-06-12 Perforation 3682.00 3682.50 7
2018-06-12 Perforation 3673.00 3673.50 7
2018-06-12 Perforation 3664.00 3664.50 7
2018-06-12 Perforation 3655.00 3655.50 7
2018-06-12 Multi-Stage Fracture 3655.00 3700.50 0
2018-06-12 Perforation 3645.00 3645.50 7
2018-06-12 Perforation 3636.00 3636.50 7
2018-06-12 Perforation 3627.00 3627.50 7
2018-06-12 Perforation 3618.00 3618.50 7
2018-06-05 Perforation 4727.50 4728.00 7
2018-06-12 Perforation 3609.00 3609.50 7
2018-06-12 Perforation 3600.00 3600.50 7
2018-06-12 Multi-Stage Fracture 3600.00 3645.50 0
2018-06-13 Perforation 3590.00 3590.50 7
2018-06-13 Perforation 3581.00 3581.50 7
2018-06-13 Perforation 3572.00 3572.50 7
2018-06-13 Perforation 3563.00 3563.50 7
2018-06-13 Perforation 3554.00 3554.50 7
2018-06-13 Perforation 3545.00 3545.50 7
2018-06-13 Multi-Stage Fracture 3545.00 3590.50 0
2018-06-05 Perforation 4713.80 4714.30 7
2018-06-13 Perforation 3533.00 3533.50 7
2018-06-13 Perforation 3526.00 3526.50 7
2018-06-13 Perforation 3517.00 3517.50 7
2018-06-13 Perforation 3508.00 3508.50 7
2018-06-13 Perforation 3499.00 3499.50 7
2018-06-13 Perforation 3490.00 3490.50 7
2018-06-13 Multi-Stage Fracture 3490.00 3533.50 0
2018-06-14 Perforation 3480.00 3480.50 7
2018-06-14 Perforation 3471.00 3471.50 7
2018-06-14 Perforation 3462.00 3462.50 7
2018-06-05 Perforation 4700.00 4700.50 7
2018-06-14 Perforation 3453.00 3453.50 7
2018-06-14 Perforation 3444.00 3444.50 7
2018-06-14 Perforation 3435.00 3435.50 7
2018-06-14 Multi-Stage Fracture 3435.00 3480.50 0
2018-06-14 Perforation 3425.00 3425.50 7
2018-06-14 Perforation 3416.00 3416.50 7
2018-06-14 Perforation 3407.00 3407.50 7
2018-06-14 Perforation 3398.00 3398.50 7
2018-06-14 Perforation 3389.00 3389.50 7
2018-06-14 Perforation 3380.00 3380.50 7
2018-06-05 Multi-Stage Fracture 4700.00 4741.80 0
2018-06-14 Multi-Stage Fracture 3380.00 3425.50 0
2018-06-14 Perforation 3370.00 3370.50 7
2018-06-14 Perforation 3356.30 3356.80 7
2018-06-14 Perforation 3342.50 3343.00 7
2018-06-14 Perforation 3328.80 3329.30 7
2018-06-14 Multi-Stage Fracture 3328.80 3370.50 0
2018-06-14 Perforation 3315.00 3315.50 7
2018-06-14 Perforation 3301.30 3301.80 7
2018-06-14 Perforation 3287.50 3288.00 7
2018-06-14 Perforation 3273.80 3274.30 7
2018-06-05 Perforation 4686.30 4686.80 7
2018-06-14 Multi-Stage Fracture 3273.80 3315.50 0
2018-06-15 Perforation 3260.00 3260.50 7
2018-06-15 Perforation 3246.30 3246.80 7
2018-06-15 Perforation 3232.50 3233.00 7
2018-06-15 Perforation 3218.80 3219.30 7
2018-06-15 Multi-Stage Fracture 3218.80 3260.50 0
2018-06-15 Perforation 3205.00 3205.50 7
2018-06-15 Perforation 3191.30 3191.80 7
2018-06-15 Perforation 3177.50 3178.00 7
2018-06-15 Perforation 3163.80 3164.30 7
2018-06-05 Perforation 4672.50 4673.00 7
2018-06-15 Multi-Stage Fracture 3163.80 3205.50 0
2018-06-16 Perforation 3150.00 3150.50 7
2018-06-16 Perforation 3136.30 3136.80 7
2018-06-16 Perforation 3122.50 3123.00 7
2018-06-16 Perforation 3108.80 3109.30 7
2018-06-16 Multi-Stage Fracture 3108.80 3150.50 0
2018-06-16 Perforation 3095.00 3095.50 7
2018-06-16 Perforation 3081.30 3081.80 7
2018-06-16 Perforation 3067.50 3068.00 7
2018-06-16 Perforation 3053.80 3054.30 7
2018-06-05 Perforation 4658.80 4659.30 7
2018-06-16 Multi-Stage Fracture 3053.80 3095.50 0
2018-06-17 Perforation 3040.00 3040.50 7
2018-06-17 Perforation 3026.30 3026.80 7
2018-06-17 Perforation 3012.50 3013.00 7
2018-06-17 Perforation 2993.80 2994.30 7
2018-06-17 Multi-Stage Fracture 2993.80 3040.50 0
2018-06-17 Perforation 2985.00 2985.50 7
2018-06-17 Perforation 2971.30 2971.80 7
2018-06-17 Perforation 2957.50 2958.00 7
2018-06-17 Perforation 2943.80 2944.30 7
2018-06-04 Perforation 4852.70 4853.20 7
2018-06-05 Perforation 4645.00 4645.50 7
2018-06-17 Multi-Stage Fracture 2943.80 2985.50 0
2018-06-17 Perforation 2930.00 2930.50 7
2018-06-17 Perforation 2916.30 2916.80 7
2018-06-17 Perforation 2902.50 2903.00 7
2018-06-17 Perforation 2888.80 2889.30 7
2018-06-17 Multi-Stage Fracture 2888.80 2930.50 0
2018-06-18 Perforation 2875.00 2875.50 7
2018-06-18 Perforation 2861.30 2861.80 7
2018-06-18 Perforation 2847.50 2848.00 7
2018-06-18 Perforation 2833.80 2834.30 7
2018-06-05 Multi-Stage Fracture 4645.00 4686.80 0
2018-06-18 Multi-Stage Fracture 2833.80 2875.50 0
2018-06-18 Perforation 2820.00 2820.50 7
2018-06-18 Perforation 2806.30 2806.80 7
2018-06-18 Perforation 2792.50 2793.00 7
2018-06-18 Perforation 2778.80 2779.30 7
2018-06-18 Multi-Stage Fracture 2778.80 2820.50 0
2018-06-18 Perforation 2765.00 2765.50 7
2018-06-18 Perforation 2751.30 2751.80 7
2018-06-18 Perforation 2737.50 2738.00 7
2018-06-18 Perforation 2723.80 2724.30 7
2018-06-06 Perforation 4631.30 4631.80 7
2018-06-18 Multi-Stage Fracture 2723.80 2765.50 0
2018-06-19 Perforation 2710.00 2710.50 7
2018-06-19 Perforation 2696.30 2696.80 7
2018-06-19 Perforation 2682.50 2683.00 7
2018-06-19 Perforation 2668.80 2669.30 7
2018-06-19 Multi-Stage Fracture 2668.80 2710.50 0
2018-06-19 Perforation 2655.00 2655.50 7
2018-06-19 Perforation 2641.30 2641.80 7
2018-06-19 Perforation 2627.50 2628.00 7
2018-06-19 Perforation 2613.80 2614.30 7
2018-06-06 Perforation 4617.50 4618.00 7
2018-06-19 Multi-Stage Fracture 2613.80 2655.50 0
2018-06-19 Perforation 2600.00 2600.50 7
2018-06-19 Perforation 2586.30 2586.80 7
2018-06-19 Perforation 2572.50 2573.00 7
2018-06-19 Perforation 2558.80 2559.30 7
2018-06-19 Multi-Stage Fracture 2558.80 2600.50 0
2018-06-19 Perforation 2545.00 2545.50 7
2018-06-19 Perforation 2531.30 2531.80 7
2018-06-19 Perforation 2517.50 2518.00 7
2018-06-19 Perforation 2503.80 2504.30 7
2018-06-06 Perforation 4603.80 4604.30 7
2018-06-19 Multi-Stage Fracture 2503.80 2545.50 0
2018-06-06 Perforation 4590.00 4590.50 7
2018-06-06 Multi-Stage Fracture 4590.00 4631.80 0
2018-06-07 Perforation 4576.30 4576.80 7
2018-06-07 Perforation 4562.50 4563.00 7
2018-06-07 Perforation 4548.80 4549.30 7
2018-06-04 Perforation 4837.50 4838.00 7
2018-06-07 Perforation 4535.00 4535.50 7
2018-06-07 Multi-Stage Fracture 4535.00 4576.80 0
2018-06-07 Perforation 4521.30 4521.80 7
2018-06-07 Perforation 4507.50 4508.00 7
2018-06-07 Perforation 4493.80 4494.30 7
2018-06-07 Perforation 4480.00 4480.50 7
2018-06-07 Multi-Stage Fracture 4480.00 4521.80 0
2018-06-07 Perforation 4466.30 4466.80 7
2018-06-07 Perforation 4452.50 4453.00 7
2018-06-07 Perforation 4438.80 4439.30 7
2018-06-04 Perforation 4823.80 4824.30 7
2018-06-07 Perforation 4425.00 4425.50 7
2018-06-07 Multi-Stage Fracture 4425.00 4466.80 0
2018-06-08 Perforation 4411.30 4411.80 7
2018-06-08 Perforation 4397.50 4398.00 7
2018-06-08 Perforation 4383.80 4384.30 7
2018-06-08 Perforation 4370.00 4370.50 7
2018-06-08 Multi-Stage Fracture 4370.00 4411.80 0
2018-06-08 Perforation 4360.00 4360.50 7
2018-06-08 Perforation 4351.00 4351.50 7
2018-06-08 Perforation 4342.00 4342.50 7
2018-06-04 Perforation 4810.00 4810.50 7
2018-06-08 Perforation 4333.00 4333.50 7
2018-06-08 Perforation 4324.00 4324.50 7
2018-06-08 Perforation 4315.00 4315.50 7
2018-06-08 Multi-Stage Fracture 4315.00 4360.50 0
2018-06-09 Perforation 4305.00 4305.50 7
2018-06-09 Perforation 4296.00 4296.50 7
2018-06-09 Perforation 4287.00 4287.50 7
2018-06-09 Perforation 4278.00 4278.50 7
2018-06-09 Perforation 4269.00 4269.50 7
2018-06-09 Perforation 4260.00 4260.50 7
2018-06-04 Multi-Stage Fracture 4810.00 4853.20 0
2018-06-09 Multi-Stage Fracture 4260.00 4305.50 0
2018-06-09 Perforation 4250.00 4250.50 7
2018-06-09 Perforation 4241.00 4241.50 7
2018-06-09 Perforation 4232.00 4232.50 7
2018-06-09 Perforation 4223.00 4223.50 7
2018-06-09 Perforation 4214.00 4214.50 7
2018-06-09 Perforation 4205.00 4205.50 7
2018-06-09 Multi-Stage Fracture 4205.00 4250.50 0
2018-06-09 Perforation 4195.00 4195.50 7
2018-06-09 Perforation 4186.00 4186.50 7
2018-06-05 Perforation 4796.30 4796.80 7
2018-06-09 Perforation 4177.00 4177.50 7
2018-06-09 Perforation 4168.00 4168.50 7
2018-06-09 Perforation 4159.00 4159.50 7
2018-06-09 Perforation 4150.00 4150.50 7
2018-06-09 Multi-Stage Fracture 4150.00 4195.50 0
2018-06-10 Perforation 4140.00 4140.50 7
2018-06-10 Perforation 4131.00 4131.50 7
2018-06-10 Perforation 4122.00 4122.50 7
2018-06-10 Perforation 4113.00 4113.50 7
2018-06-10 Perforation 4104.00 4104.50 7
2018-06-05 Perforation 4782.50 4783.00 7
2018-06-10 Perforation 4095.00 4095.50 7
2018-06-10 Multi-Stage Fracture 4095.00 4140.50 0
2018-06-10 Perforation 4085.00 4085.50 7
2018-06-10 Perforation 4076.00 4076.50 7
2018-06-10 Perforation 4067.00 4067.50 7
2018-06-10 Perforation 4058.00 4058.50 7
2018-06-10 Perforation 4049.00 4049.50 7
2018-06-10 Perforation 4040.00 4040.50 7
2018-06-10 Multi-Stage Fracture 4040.00 4085.50 0
2018-06-10 Perforation 4021.00 4022.00 17
2018-06-05 Perforation 4768.80 4769.30 7
2018-06-10 Perforation 4003.00 4004.00 17
2018-06-10 Perforation 3985.00 3986.00 17
2018-06-10 Multi-Stage Fracture 3985.00 4022.00 0
2018-06-10 Perforation 3966.00 3967.00 17
2018-06-10 Perforation 3948.00 3949.00 17
2018-06-10 Perforation 3930.00 3931.00 17
2018-06-10 Multi-Stage Fracture 3930.00 3967.00 0
2018-06-11 Perforation 3911.00 3912.00 17
2018-06-11 Perforation 3893.00 3894.00 17
2018-06-11 Perforation 3875.00 3876.00 17

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-06-04 2018-06-19 2,318 44,639 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 hydrochloric acid 7647-01-0 100 0.5172 N/A
water Not Available 100 52.9308 N/A
Sand - Tier 2 (40/70) Trican silica crystalline 14808-60-7 100 3.56 N/A
Sand 30/50 Trican silica crystalline 14808-60-7 100 5.5096 N/A
Sand 50/140 Trican silica crystalline 14808-60-7 100 0.4696 N/A
AQUCAR DB20 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.011 N/A
dibromoacetonitrile 3252-43-5 100 0.0109 N/A
non-hazardous ingredients Not Available 100 0.011 N/A
polyethylene glycol 25322-68-3 100 0.011 N/A
sodium bromide 7647-15-6 100 0.011 N/A
WBO-2 Trican Breaker sodium persulfate 7775-27-1 100 0.0079 N/A
AI-11 Trican Corrosion Inhibitor non-hazardous ingredients Not Available 100 0.0036 N/A
potassium iodide 7681-11-0 100 0.0036 N/A
propargyl alcohol 107-19-7 100 0.0036 N/A
propargyl alcohol derivative 9393 100 0.0036 N/A
Bulk WXB-17 Trican Crosslinker monoethanolamine 141-43-5 100 0.0857 N/A
monoethanolamine borate 26038-87-9 100 0.0857 N/A
non-hazardous ingredients Not Available 100 0.0857 N/A
DF-2W Trican Defoamer non-hazardous ingredients Not Available 100 0.0013 N/A
propylene glycol 57-55-6 100 0.0013 N/A
Bulk FR-22 Trican Friction Reducer alcohols. C10-16. ethoxylated 68002-97-1 100 0.0639 N/A
distillates (petroleum). hydrotreated light naphthenic 64742-53-6 100 0.0639 N/A
non-hazardous ingredients Not Available 100 0.0639 N/A
WG-111DA Trican Gelling Agent fumaric acid 110-17-8 100 0.1535 N/A
guar gum 9000-30-0 100 0.1535 N/A
Bulk SI-18 Trican Scale Inhibitor non-hazardous ingredients Not Available 100 0.0431 N/A
Bulk S-17X Trican Surfactant 1-hexanol. 2-ethyl-. manuf. of.
by-products from. distn. residues
68609-68-7 100 0.089 N/A
benzenesulfonic acid. dodecyl-. compd. with 2-aminoethanol 26836-07-7 100 0.089 N/A
methanol 67-56-1 100 0.089 N/A
methyloxirane polymer with oxirane 11/6/9003 100 0.089 N/A
non-hazardous ingredients Not Available 100 0.089 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2018-05-30 2018-06-20 Waste Water - Municipal 41403
2018-06-03 2018-07-14 Recycled Fracturing Water (treated at well site) 3597

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 3559 0.0 0.0 0.0
2019 8251 0.0 0.0 0.0
2020 1965 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-03-13 No Incident Encountered 0.00 0.00
2018-06-04 No Incident Encountered 0.00 0.00

For data sources see[10]

References