X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0314252301020

Well Details

Well ID: 0314252301020
Loading map...
Location: 02/01-23-031-25W4/0
Location Alias: 02/01-23-31-25 W4M
Location Alias 2: 02/01-23-031-25 W4/00
Country: Canada
Province: Alberta
Township: 031
Meridian: 4
Range: 25
Section: 23
County/Municipality: Kneehill County
Well Name: ARTIS TWINING 1-23-31-25
Operator Name: Artis Exploration Ltd.
License Number: 0434749
License Date: 2011-06-30
License Status: Suspension
Spud Date: 2011-08-14
Final Drill Date: 2011-08-28
Well Total Depth: 3165.00 m
Surface Hole Latitude: 51.679822
Surface Hole Longitude: -113.436185

For data sources see[1][2]

Well History

Date Event
2011-06-30 Obtained License
2011-08-15 Surface Casing Operation Performed
2011-08-17 Direction Drilling Operation Performed - Horizontal
2011-08-20 Intermediate Casing Operation Performed
2011-08-20 Liner Casing Operation Performed
2011-08-28 Finished Drilling
2011-08-28 Well Log Performed
2011-08-28 Well Mode changed to Drilled and Cased
2011-09-03 Liner Casing Operation Performed
2011-09-05 Rig Released
2011-09-29 Well Log Performed
2011-11-10 Perforation Treatment Performed - Multi-Stage Fracture
2011-11-11 Perforation Treatment Performed - Multi-Stage Fracture
2011-11-17 Well Began Production
2011-11-17 Well Fluid changed to Crude Oil
2011-11-17 Well Mode changed to Pumping
2015-10-31 Well Fluid changed to Crude Oil
2015-10-31 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-08-17 1269.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-11-10 Multi-Stage Fracture 2910.60 2910.70 0
2011-11-11 Multi-Stage Fracture 2353.70 2353.80 0
2011-11-11 Multi-Stage Fracture 2291.30 2291.40 0
2011-11-11 Multi-Stage Fracture 2228.60 2228.70 0
2011-11-11 Multi-Stage Fracture 2166.60 2166.70 0
2011-11-11 Multi-Stage Fracture 2104.20 2104.30 0
2011-11-11 Multi-Stage Fracture 2041.80 2041.90 0
2011-11-11 Multi-Stage Fracture 1979.80 1979.90 0
2011-11-11 Multi-Stage Fracture 1917.30 1917.40 0
2011-11-10 Multi-Stage Fracture 2849.60 2849.70 0
2011-11-10 Multi-Stage Fracture 2776.20 2776.30 0
2011-11-10 Multi-Stage Fracture 2714.30 2714.40 0
2011-11-10 Multi-Stage Fracture 2652.20 2652.30 0
2011-11-10 Multi-Stage Fracture 2590.30 2590.40 0
2011-11-10 Multi-Stage Fracture 2528.50 2528.60 0
2011-11-10 Multi-Stage Fracture 2478.00 2478.10 0
2011-11-11 Multi-Stage Fracture 2415.90 2416.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 1046 0.0 0.0 0.0
2012 6729 0.0 0.0 0.0
2013 8096 0.0 0.0 0.0
2014 5130 0.0 0.0 0.0

For data sources see[6]

References